管道穿越 的英文怎麼說

中文拼音 [guǎndàochuānyuè]
管道穿越 英文
pipeline crossing
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 穿 : Ⅰ動詞1 (破; 透) pierce through; penetrate 2 (通過孔、隙、空地等) pass through; cross; go thro...
  • : Ⅰ動詞1 (跨過; 跳過) get over; jump over 2 (超出) exceed; overstep 3 (昂揚) (of one s voice...
  • 管道 : [工業] pipeline; channel; tunnel; piping; canalis; pipe run; duct; conduit; conduit pipe; ducting...
  • 穿越 : (橫穿) pass through; cut across
  1. Danish navigator and explorer who in1728 sailed through the bering strait, proving ( though he did not realize it at the time ) that asia and north america are separate continents

    白令,維圖斯1681 1741丹麥航海家、探險家, 1728年駕船穿白令海峽,證明(盡他當時不知)亞洲和北美洲是兩片分開的大陸
  2. Design code for oil and gas transportation pipeline crossing engineering - aerial crossing engineering

    原油和天然氣輸送穿工程設計規范跨工程
  3. Standard for quality inspection and evaluation of petroleum construction engineering - pipeline crossing and aerial crossing project

    石油建設工程質量檢驗評定標準穿工程
  4. Entitled " natural environment ", " prehistoric life ", " trade and coastal defences ", " glimpse of the fishermen s life ", " life in a village ", " british rule ", " great transformation " and " new challenges ", they provide a wonderful insight into the life and traditional culture of the past

    導賞員與參加的長者結伴穿新界文物館內的時光隧,探索展覽八大主題:自然環境史前生活貿易與海防漁家掠影鄉村情貌英國治舊貌展新顏及新里程。讓長者重拾昔日的社會生活和傳統文化的回憶。
  5. West pipeline crossing heihe river is the longest crossing project by a large excavation way and the method of laying both crude oil pipeline and products pipeline in a single trench

    摘要黑河是西部工程採用大開挖方式穿的距離最長的河流,原油與成品油採用同溝敷設方式穿該河流。
  6. This paper depicts the engineering outline of the pipeline crossing project as well as a series of new construction methods such as integral pipeline prefabrication, trenching layer by layer, integral lowering pipeline into trench and integral pressure testing, which speed up the construction progress and reduce the construction cost

    文章介紹了穿段的工程概況以及整體預制、溝分層開挖、整體下溝和整體試壓等一系列新的施工方法,該方法加快了施工進度,節約了施工費用。
  7. So far she ' s logged 11, 000 miles through 37 states, carrying laundry soap, grease, sugar, soda and plumbing supplies

    到目前為止,她已駕車穿了37個州,行程11 , 000英里,運輸過洗衣皂、油脂、白糖、汽水和用品。
  8. We succeeded in crossing hanjing river of zhong - wu gas pipeline project, dawen river of jining branch line of west - east gas pipeline using the technique of trenching in water, controlling negative buoyancy and bottom towing without water interception

    公司採用帶水大開挖成溝,控制負浮力,底拖法等施工工藝,在江河不斷流的前提下,成功完成了忠武輸氣襄樊支線漢江穿、西氣東輸冀寧支線大汶河穿等工程。
  9. Multi - thousand miles long, west - east gas pipeline passes through ten provinces & cities of china like a huge steel dragon

    四川石油理局資陽鋼廠西氣東輸管道穿越十省市,橫貫八千里,宛如一條鋼鐵巨龍,行走于神州大地。
  10. Because of its advantages in traversing the channels, with the development of the national economy, immersed tunnels will inevitably be used as the main means of traversing rivers, bays and seabeds. in the cities divided by rivers over bays, immersed tunnels have great superiorities in connecting the different parts

    由於沉在跨上所具有的優性,我國隨著經濟的發展,必然將沉作為穿河流、港灣、海底的重要手段,在被河流港灣分割的城市,用沉聯系城市交通尤其具有優性。
  11. Taking zibo - qingdao natural gas pipeline engineering for example, starting with the present crossing river modes for gas transport pipeline, the main contents and methods of geotechnical engineering investigation for pipeline crossing river are put forward ; the existential geotechnical engineering problems and relevant countermeasures in the course of design and construction of this pipeline engineering ' s crossing river project are analyzed and evaluated ; the importance of geotechnical engineering investigation in the design and construction of long distance pipe lines is pointed out

    摘要以淄青天然氣工程為例,從目前輸氣河流穿方式入手,提出了管道穿越河流巖土工程勘察的主要內容和方法,分析評價了淄博青島輸氣工程河流穿工程設計及施工過程中存在的巖土工程問題及相應的對策,指明了巖土工程勘察在長輸設計及施工中的重要性。
  12. The application of natm tunnel method in zhongxian wuhan gas transmission pipeline crossing

    鉆爆法隧在忠武輸氣管道穿越中的應用
  13. Associated with a practical example of pipeline crossing with directional drilling technique in yizheng - changling crude oil pipeline, this paper analyzes the characteristics of crossing through rocky stratum with directional drilling, deliberates the stratum status, drilling machine selection, drilling tool assembly, direction control, mud control ; drilling process as well as emergency dealing scenarios at the stages of guiding - hole drilling, aperture expanding and back - towing

    摘要結合儀征長嶺原油洪湖長江定向鉆穿工程實例,分析了定向鉆穿長距離巖石層的特點,論述了定向鉆穿巖石層的地層狀況、鉆具組合、控向措施、泥漿控制、鉆進工藝以及導向孔鉆進、擴孔、回拖階段的應急預案,針對在鉆導向孔過程中因泥漿壓力高、信號線多次出現被高壓泥漿沖壞、造成控向信號不穩定甚至中斷的情況,對信號線的安裝提出了改進措施。
  14. Way of large pipeline tunnel passing through river and its construction

    大型管道穿越大江大河方式和施工方法的探討
  15. Petroleum and gas pipeline crossing engineering construction and acceptance specification

    石油天然氣管道穿越工程施工及驗收規范
  16. Several opinions of natural gas pipeline underground crossing project forecast evaluation of labor sffety and health

    對天然氣管道穿越工程勞動安全衛生預評價的幾點認識
  17. His truck left the road, travelling from right to left. he slipped end - over - end, across the culvert outlet and landed on the left side of it

    他的卡車沖出了路,從路右側沖向左側。車頭尾翻轉穿,在涵左側著陸。
  18. Much as water currents helping vessels to move across oceans, there exist pathways among planets that allow probes to glide through without expending much energy. these pathways are actually consequences of universal gravitation. take the sun and earth as example

    就像橫渡海洋的船隻藉助洋流一樣,天空中也有類似連接起行星的,只要探測船進入了,推進探測船就不須能量,便會沿滑行在太陽系中穿梭。
  19. The results show that although there are somewhat systematic errors in the coupled model, the model simulates the basic features of seasonal cycle and interannual variability of sea surface height to the considerable extent, in order to examine the impact of indonesian through flow ( itf ) on the seasonal cycle and interannual variation of sea surface height, a sensitivity experiment is accomplished, in which the indonesian passage is closed fully in the coupled model

    結果表明,盡耦合模式存在一定的系統誤差,但仍然能相當程度上夠模擬出海面高度季節和年際變化的基本特徵。同時為檢驗模式中印度西亞穿流( itf )對海面高度季節和年際變化的影響,本文還進行了印度尼西亞海完全關閉的敏感性試驗,與控制試驗結果對比表明,印尼穿流對季節變化的影響不大,但可以顯著影響熱帶太平洋和印度洋年際變化的特徵。
  20. In combination with a project schedule management case of pipe horizontal direction drill project, the author analyzes its network program with monte carlo simulation technique, and then comes to the conclusion that the stochastic network program can give more substantial schedule information to the project manager than ordinary network program

    結合水平定向鉆穿工程進度理實例,在其網路計劃中應用蒙特卡洛模擬技術進行分析,以概率形式確定關鍵工作和施工工期,為項目經理進行進度理提供更多更充實信息。