約束優化方法 的英文怎麼說

中文拼音 [yāoshùyōuhuàfāng]
約束優化方法 英文
constrained optimization method
  • : 約動詞[口語] (用秤稱) weigh
  • : Ⅰ動詞1 (捆; 系) bind; tie 2 (控制; 約束)control; restrain Ⅱ量詞(用於捆在一起的東西) bundle;...
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 約束 : keep within bounds; restrain; bind; bound; boundage;tie; restraint; restriction; engagement; repr...
  • 方法 : method; means; way; technique; process; procedure; plan; device; recipe; fashion; tool; maneuver
  1. A nonmonotonic criterion is used to speed up the convergence progress in some ill - conditioned cases

    hesse演算是目前較流行的解決非線性等式問題的有效之一。
  2. The evolution laws of structural weight, the best optimum fitness, average fitness, maximum nodal stress and displacement with increasing generations are discussed. and multi - result fact of the topology optimization can be obtained by ga - fem. the research results in this thesis show that the developed method is successful in the topology optimization for 2d continuum structures under multi - load and multi - constrain conditions

    上述工作表明,本文ga ? fem可以實現多載荷、多條件下平面連續結構拓撲,與eso等獲得的結果相比,本文的結果不存在單元鉸接和不連續單元,結構多樣,質量更小,效果更
  3. Convergence of line search methods for unconstrained optimization

    問題線搜索的收斂性
  4. The connection between the torque and the polarized charges is established. on the base of mathematical model of torsional effect, using multivariate unrestrained nonlinear optimization method, we research cutting angles and parameters of crosssection to get best torsional sensitivity

    在建立石英晶體扭轉效應模型的基礎上,應用多變量、無非線性對于晶體切型、截面形狀等參數進行了,以獲得最佳扭轉靈敏度。
  5. First regarding cutting speed, working feed as the variable of designing, this article establishes the multi - goal mathematics model of manufacturing cost, productivity, profit ; second according to the mathematics model, it adopts added - power optimum method with matlab and resolves the feasible optimum parameter with computer ; it provides the person who optimize with turning processing technology parameter, and can offer reference supporting other optimization of parameters

    摘要以切削速度、進給量為設計變量,建立了以加工成本、生產率、利潤為多目標的數學模型;根據所得多目標綜合數學模型,採用加權函數,用matlab求出在限制可行域內最參數,為車削加工工藝參數提供依據和量,可供其他參數的提供參考。
  6. The concept of the optimize design is proposed and its mathematic foundation is analyzed in this paper. after comparing several optical calculation methods, the one that is suitable for the lubricating system is chosen and analyzed in detail about its concept, characteristic and some focal points. meanwhile, combining with the analysis of the relationship among the parts and structure of marine low - speed diesel lubricating system, the internal disciplinary, other pipeline system and main engine, aiming at reducing the initial investment and the running cost in a certain years, the mathematic model of the system is built and the object function and subjected conditions are set up

    本課題闡述了最設計的概念,分析了最設計問題的數學基礎,比較了多維問題的幾種,選取了適合於潤滑油系統的設計式,並對該式的概念、特點及其應注意的問題進行了較詳細的分析;同時,結合海船低速柴油機潤滑油系統的組成部件及其結構以及潤滑油系統內部規律與其它管路系統、船舶主機的關系的分析,從經濟性的角度,以設備初投資及其在一定年限內的耗能費最低為目標,建立了本系統設計的數學模型,確立了目標函數和條件。
  7. 4 by studying mechanical optimization method, combining theory of metal cutting processing, summarize the optimization function by the cutting parameter as optimization aim and corresponding restraint condition. adopt one of optimization methods - compound shape method - to calculate cutting parameter ' s optimization result

    4運用機械最,結合金屬切削加工理論,推導了以切削參數為四川大學碩i學位論文目標的目標函數並確定了相應條件,採用中的復合形實現了切削參數的最設計。
  8. Considering that the characteristics of our country ' s highway tunnels are always of long spans, tabular and of various geometry, by means of thorough analysis of the different problems existed in the design of support structures of the tunnels at present, this paper pays special attention to the two key problems, optimization method of form selection of structural section of the tunnel as well as the stability and bearing capacity of the support structures, in the design of the long and large tunnel on high - class highway, introduces the simplified complex - form optimum method in the structure optimization theory, discusses the optimum design model of lining section of highway tunnel with satisfying demands in building clearance, ventilation and load conditions, puts forward an optimization method of form selection of three different kinds of lining sectional forms ( i. e. single - center circle, three - center tabular circle and three - center sharp circle ), establishes a complete set of systematic optimum design the ory and method of long and large tunnel on high - class highway, develops the corresponding computer software used on the planned xuefeng mountain highway tunnel on shaoyang to huaihua expressway in hunan province for optimization of form selections of the structural sections, and obtains a series of relatively reasonable structural design parameters

    本文針對我國公路隧道多為大跨度、扁平、幾何形狀呈多樣的特點,通過深入分析目前隧道支護結構設計中存在的各種問題,抓住高等級公路長大隧道設計中隧道結構斷面的選型及隧道支護結構的穩定性與承載能力兩個核心問題,引入結構理論中的簡易復合形,深入探討了滿足建築限界、通風條件、受力狀態等條件下公路隧道襯砌斷面設計模型,提出了三種襯砌斷面形狀(單心圓、坦三心圓和尖三心圓)的選型,建立起一套完善的高等級公路長大隧道的系統設計理論與,並開發出相應的計算機程序,用於擬建的上海至瑞麗國道主幹線湖南省邵陽至懷高速公路雪峰山長大高速公路隧道的結構斷面選型,得出了一系列較為合理的支護結構設計參數。
  9. ( 2 ) also, we discuss how to set up a hydrogen network super structure and a optimization model of oil refineries. the advantage of the super structure is considering suppliers, consumers, purifier, compressors, pipes and pressure constraints, and connecting all possible links from sources to sinks

    ( 2 )本文討論了煉油廠氫網路子系統超結構的構建和,綜合考慮了氫系統的供氫裝置、耗氫裝置、提純裝置、壓縮機、管網,以及系統壓力的條件,建立了所有可能的氫源與氫阱之間的連接。
  10. Interval optimization in interval analysis is proper to solve nonlinear programming problems with restrictions, which most of the reservoir optimal dispatching models belong to

    區間分析中的區間適用於求解有的非線性規劃問題,而大多數的水庫調度模型就是屬于這類問題。
  11. With the using of microsoft visual basic 6. 0, a multimedia computer - aided design system of small type pumping irrigation district is developed in this paper. provided with the live multimedia messages as well as a good man - machine conversation mechanism, this system can help the user to finish the planning of an pumping irrigated area such as the layout of canal system, the selection of pump models, the establishment of the irrigation program, the calculating of canals " parameters, the estimate of the project magnitude, the selection of the field constructions, the economic analysis of the project, the output of results, etc, a new oo ( object oriented ) programming method is adopted in this system, various softwares are integrated in this systems as well by the " automation " technic provided by vb, in addition, the multimedia technic is applied to this system for the first time, it makes the system easy to ope rate. as for the optimization of the canals " section, a new optimization method is adopted based on the existing theories about the canals " section, and in this way, with the purpose of minimizing the project ' s investment as well as a stalized canal, limited by the longituding slope, the canals " best feasible parameters can be deduced. furthermore, a integral method to reckon the earth work is developed in this paper, by this way, the estimate precision of the earthwork is enhanced notably. this paper includes the particular illumination for the developing procedure of each systems " segment, and in the end, the directions of the system are demonstrated in a sample area which lies in the zhaija village, taizhou city, jiangsu province, the running results showed that the initial purposes are achieved effectively, and it has a preferable practicability

    在渠道縱橫斷面面,本文在利用已經比較成熟的縱橫斷面理論的基礎上,提出以工程總費用最小為目標函數,以渠道縱坡i為控制變量,以渠道不沖不淤流速及灌區允許地面比降為條件,通過縱橫斷面聯動得到渠道的最佳工程可行的斷面參數。另外,針對部分地區的取土困難的狀況,本文採用積分計算渠道工程土量,從而大大提高了土量的估算精度,有助於準確控制工程投資規模及資金投向。本文詳細闡述了該系統所採用的編程、系統構成、系統各組成模塊的開發過程以及灌區規劃所採用的及原理,最後應用本系統對泰州市翟家村機電灌區進行規劃設計,運行結果證明其操作比較簡便,界面友好,運行速度快,規劃成果合理,基本達到了系統預定的要求,具備較強的實用性。
  12. The main work of this paper was as fellows : ( 1 ) generalized the development of pre - stressed steel structure in our nation and abroad, and pointed out the main problem in practice ; ( 2 ) presented the mechanism of pre - stressed steel structure and revealed its applicable range ; ( 3 ) established the optimization design model for pre - stressed steel structure, which accounts for constraints on stresses and displacements of structure ; ( 4 ) brought forward the optimization design method, which combined linear programming and the principle of full restriction, through which we can obtain the magnitude of each time pre - stress and the optimized sections of each members of structure ; ( 5 ) analyzed the best times of pre - stress and pointed out that 2 ~ 3 times is preferable ; ( 6 ) conducted optimization design on large - space steel roof, horizontal parallel steel truss with local cables, horizontal parallel steel truss with global cable, and ultra - static steel truss, the result of which indicated that the multiple pre - stress structure is very economic ; ( 7 ) compared different schemes of cable placement for horizontal parallel steel truss, and the results showed that the local cable only unloaded the second girders, but had no response on the first girders and stomach poles, while global cable could unload the second girders and the stomach poles outside of turning point of cable, thus proving that global cable is more economic than local - cable

    本文的主要工作是:對國內外預應力鋼結構的發展歷史及現狀作了綜述和總結,指出當前預應力鋼結構工程實踐中存在的主要問題;闡述了預應力鋼結構的受力機理,並指出預應力鋼結構的適用范圍和特點;在考慮結構應力和變位的條件下,建立預應力鋼結構設計模型;提出多次預應力鋼結構設計和步驟,採用線性規劃和滿準則相結合的,可設計出施加的每一級預應力的大小,並得到結構各部分的截面;對多次預應力最佳的施加次數作了分析,並建議以2 3次為宜;為驗證文中理論和,分別對大跨多次預應力鋼屋架、局部布索的水平平行弦鋼桁架、整體布索的水平平行弦鋼桁架和局部布索的超靜定鋼桁架等算例進行了設計,經濟效益明顯;對水平平行弦鋼桁架的幾種施加預應力的案進行比較,對于局部布索,預應力只對下弦起到卸載作用,對上弦和腹桿基本不起作用;而整體布索預應力除對下弦卸載外,對索折點以外部分腹桿也起到卸載作用,經濟效益好於局部布索。
  13. The heuristic analysis, some concepts and theorems of constrained optimization are employed, e. g., linear feasible direction ( lfd ), and then the proof is first provided for the uniqueness, i. e., maximum nongaussianity is the sufficient and necessary condition to independent source recovery. moreover, based on the conclusion of the uniqueness of maximum nongaussianity, the paper also proposes an alternative but straightforward approach to the proof for the well known “ one - bit - matching ” conjecture presented in multi - unit approaches

    和基於啟發性分析等傳統和結論比較,文中引入了線性可行向( linearfeasibledirection , lfd )等概念和理論,首次給出了基於峭度的最大非高斯估計的唯一性證明,指出最大非高斯估計是獨立源提取的充分和必要條件。
  14. Considering chance constrained programming is a well developed stochastic optimization method which can describe risk in an explicit manner, with the premised market trading protocols, a chance constrained programming based model for describing the optimal bidding strategies of distribution companies in a pool co - type transmission and distribution separated electricity market is presented, and solved by genetic algorithm

    鑒于機會規劃作為一類快速發展的隨機能以顯式的形式刻畫風險,針對以聯營體為基礎的輸配分開電力市場,在假設的市場交易規則基礎上,構造了在現貸市場中基於機會規劃的供電公司最報價策略模型,並採用遺傳演算求解。
  15. Furthermore, the comparison is made between eso and mathematical programming. in continuum structure optimization, eso is applied for topology optimization under the constraints of stress, displacement and frequency. in addition, eso is applied to the optimization for shells reinforced by ribs

    在連續體結構面,討論了幾類下基於漸進的連續體拓撲,這些分別是應力,位移以及頻率;利用漸進,進行了加筋板殼結構的形狀研究。
  16. Abstract : in this article an optimization method is applied to de sign open - type distribution networks. graph theory technology is used. its mathem at ical model considers both the investment of constructing lines and the cost of o peration. the main idea is getting the structure of tree network that meets with the technical constraint conditions and at the same time make the annual cost mi nimum. the examples of simulation show that this method is fast and effective

    文摘:將圖論技術應用於配電網路的設計,提出了一種適合於開式配電網路規劃的.所建的數學模型綜合考慮了待建線路的投資和運行費用.求解是以圖論中的最短路徑問題為基礎,配合以開式網路潮流演算,並通過可行路徑的合理變換,得出滿足技術條件且使年計算費用取極小值的樹狀網路結構
  17. Global convergence of a class of unconstrained optimal methods included conjugate descent method

    包含共軛下降的一類無約束優化方法的全局收斂性
  18. A model updating optimization algorithm under quadratic constraints is applied to structure dynamic model updating

    摘要將二次約束優化方法應用於結構動力模型修正問題中。
  19. The paper introduces the method of optimal design, which includes the non - constrained optimal design and constrained optimal design, then brings this method into the modeling of nurbs surfaces to resolve practical problems. the fitting of nurbs curves and surfaces are discussed in detail

    其次,本文介紹了最設計,包括無約束優化方法設計,並將最全面引入到nurbs曲線、曲面造型中去,解決設計中的實際問題。
  20. In the second chapter some problems for degree reduction of bezier curves and surfaces are studied. in this chapter, degree reduction of bezier curves with points constraints is proposed and the new approach of constrained optimization is brought in light. the stepwise method for degree reduction of rectangular bezier surfaces is further discussed

    第二章研究b zier曲線曲面的降階逼近問題,在這一章中,提出了b zier曲線的點降階逼近新問題,並給出了約束優化方法;討論了張量積b zier曲面的逐步降階逼近新,此點是直接利用b zier曲線的降階逼近解決張量積b zier曲面的降階逼近問題。
分享友人