索垂 的英文怎麼說

中文拼音 [suǒchuí]
索垂 英文
sagging bight
  • : Ⅰ名詞1 (大繩子; 大鏈子) a large rope 2 (姓氏) a surname Ⅱ動詞1 (搜尋; 尋找) search 2 (要; ...
  • : Ⅰ動詞1 (東西的一頭向下) hang down; droop; let fall 2 [書面語] (敬辭 多用於長輩、上級對自己的行...
  1. In november a un report said that eritrea had almost 2, 000 soldiers inside somalia, a claim strongly denied in asmara

    十一月的一份聯合國報告表示,厄利亞在馬里境內有大約2000名駐兵,這遭到厄政府的堅決否認。
  2. And at the zenith of his fame, how he would suddenly appear at the old village and stalk into church, brown and weather - beaten, in his black velvet doublet and trunks, his great jack - boots, his crimson sash, his belt bristling with horse - pistols, his crime - rusted cutlass at his side, his slouch hat with waving plumes, his black flag unfurled, with the skull and crossbones on it, and hear with swelling ecstasy the whisperings, " it s tom sawyer the pirate

    只見他上身穿件黑色絨布緊身衣,下身是條寬大短褲,腳蹬肥大長統靴,還背著大紅肩帶,腰帶上掛著馬槍,身邊還別了把用損了的短劍。那頂邊的帽子上飄著翎毛,黑旗迎風招展,上面交叉著骷髏頭和白骨。聽到別人悄聲低語: 「這就是海盜湯姆亞西班牙海面上的黑衣俠盜! 」
  3. The cable sag caused by cable dead weight is vertical.

    由鋼自重引起的度是豎向的。
  4. Yossarian slumped with disappointment.

    頭喪氣,失望已極。
  5. The igad region covers djibouti, eritrea, ethiopia, kenya, somalia, sudan, and uganda

    伊加特所轄區域包括吉布地,厄利亞,衣比亞,馬里,蘇丹和烏干達。
  6. The drills included rescue rubber dinghies moving in formation, a vertical landing by a rescue helicopter, evacuation of victims by amphibious vehicles, saving people in rapid water through the use of rubber dinghies, vertical evacuation of victims, use of a rope - gun, setting up a rope - bridge over a valley or stream, vertical descent from great heights, and a display of advanced earthquake rescue equipment

    演習的項目包括救生橡皮艇水上分列式直升機降救援水陸兩用車撤離災民橡皮艇急流水中救援直地形傷患拖吊拋繩槍救援溪谷單吊橋架設高空降,及多項先進的地震救援裝配靜態展示。
  7. Sony bmg hopes that by releasing all of elvis ' s previous chart - toppers he will be able to claim the coveted 1, 000th number - one slot early in the new year

    尼bmg公司希望通過發行埃爾維斯以前的所有榮登排行榜首的音樂專輯,使他在新年年初成為令人涎的第1000位排行榜冠軍。
  8. This paper considers the towline as " flexible suspended cable with rigidization " model, and applies catenary theory to analyzing the stress of the towline and to performing the simulation calculation

    將拖纜視為「剛化柔性懸」 ,應用懸理論中的懸線理論對拖纜的受力進行了分析和模擬計算。
  9. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  10. First steps taken in quest to prove backpack vtol aircraft

    背包式直起落飛行器邁出了第一步
  11. The results demonstrated that prl immunopositive cells were dispersed throughout the adenohypophysis at day 60 of gestation, and prl immunopositive cells arranged in cords or clusters in late gestation

    研究結果表明:在胎兒發育的第60天, prl免疫陽性細胞散在或呈狀分佈於整個腺體,而在妊娠後期, prl免疫陽性細胞形成細胞或細胞團。
  12. It is a sign of the popularity of his developments, as well as the bleak future of conventional malls, that the owners of nearby shopping centres are fighting hard to stop him

    它是瑞克?卡魯開發區流行的一個標志,同時也是傳統的購物中心凄涼未來的象徵,附近其他購物中心的業主為了阻止瑞克?卡魯的入侵,正做著死掙扎。
  13. We jumped off a bridge and ( fell / dropped / plummeted ) 500 feet before the bungee cord caught us

    我們從一座橋上跳下, (下降/跳下/直下落) 500英尺,然後蹦極繩把我們吊住。
  14. Chapter 4 time - dependent computational simulation of the response of cable - suspension feed system in gusty wind based on the time - independent structure finite element method, and with consideration of the movement laws of cabin, a 3 - d time - dependent structure finite element model formulated by a new method named iss method ( instantaneous structure supposition method ) to deal with the vibration response of cable - suspension feed system in gusty wind is presented. in the model, all sources of geometric non - linearity, cable sag and changes of cable geometry due to large displacement, are fully considered

    基於時不變結構的有限單元法,在綜合考慮饋源艙運動規律的基礎上,提出了時變系統的瞬時結構假定法,通過將懸離散為桿單元,建立了系統的時變有限元模型,該模型充分考慮了懸度和大變形等幾何非線性因素,應用ne 。
  15. The cable crane is a sort of special hoisting machinery, which uses flexible cable hung between two fulcrums as carrying structure, makes use of the crane carriage moving over the carrying cable to work, and hold the ability of vertical transporting and horizontal transporting

    起重機是一種以懸掛于兩支點之間的柔性鋼作為大跨距承載結構、利用載重小車在其上往返移動進行工作、兼有直運輸和水平運輸的特種起重機械。
  16. Based on historic radiosonde data of changchun city, jilin province and xian city. shanxi province and on the typical model of profiles of cloud liquid water content for stratiformis, the coefficients of retrieval equation are obtained as the functions of height for each month from april to july in the two cities. furthermore, we explore the internal physics signification of retrieval coefficients ' distributing according to every month and have comparisons between the two cities. then the numerical simulation tests of the accuracy of retrieval results are given : the statistical relative deviation of retrieved values of l to the simulated " trues " on the ground is 15 - 25 % and that at altitude of 6km is 5 - 10 %, that means the retrieval method and implementation of the method are applicable to processing measurements of an airborne radiometer made in china recently

    本文介紹機載對空微波輻射計探測雲中路徑積分液態水含量( l )的輻射傳輸原理和反演方法;根據吉林省長春市和陜西省西安市的歷史探空資料和典型的層狀雲液水直分佈模式,得到這兩個地區4 - 7月各月的隨高度而變的反演公式及其系數的表達式;探了和反演系數有關系的大氣的影響,並在各個月份之間進行了比較分析;給出了反演誤差的數值模擬檢驗結果:在地面反演值對『真值』的統計相對偏差是15 - 25 ,在6公里高度處為5 - 10 ,表明該方法已具有實用可接受的精度。
  17. Afterwards, we take sag of cables into consideration and investigate the effect of the sag of cables on the effectiveness of viscous shearing damper. finally, experiments are carried out on jun shan bridge and bai sha zhou bridge to testify the effect of viscous shearing damper and the feasibility of the finite element method and galerkin approach to analyze the effectiveness of viscous shearing damper

    然後在考慮斜拉索垂度的情況下,利用迦遼金方法,編製程序求解拉振動的附加阻尼,並與未考慮度情況下的拉振動的附加阻尼值相對比,分析度對附加阻尼的影響。
  18. In the article there is also an analysis about the influence to the complete status of the prestressed concrete cable stayed bridge of such factors as the stiffness change of the girder and the deflection of cables and the concrete creep and the temperature change. this must be useful to engineer to take a reasonable stress limitation in determining the reasonable completed status

    本文還採取對比分析計算的方法,對主梁剛度變化、拉索垂度、混凝土徐變及溫度變化等因素的影響進行了分析,並指出了它們的影響程度,有助於工程師們在確定成橋狀態時合理地選取控制條件。
  19. Consequently, some discussion on search engine has been made, including the search effects and existing questions, developing situations and development in addition, put forward some new development direction of search engine technology, such as intelligent search, personalizing search, structured search, vertical professional search and localizing search

    在此基礎上對搜引擎的檢效果、存在問題和發展狀況,以及未來發展方向作出一些探討。並提出智能化搜、個性化搜、結構化搜直化專業領域搜和本地化搜等搜引擎將成為搜引擎技術發展的主要趨勢。
  20. Since vertical specialization mainly takes place between developed countries and developing countries, and concerns intra - industry vertical trade as well as intermediate goods trade, we need a new analytical framework to study its trade basis and trade pattern

    由於直專業化分工大量發生於發達國家和發展中國家之間,同時其表現形式又是包含中間產品的產業內直貿易,而比較優勢理論和新貿易理論都只對最終產品貿易提出了理論分析框架,因而探索垂直專業化分工的基礎和模式需要一種新的理論框架。
分享友人