索塔基拉 的英文怎麼說

中文拼音 [suǒ]
索塔基拉 英文
sotaquira
  • : Ⅰ名詞1 (大繩子; 大鏈子) a large rope 2 (姓氏) a surname Ⅱ動詞1 (搜尋; 尋找) search 2 (要; ...
  • : 拉構詞成分。
  1. In single pylon cable stayed bridges, and cable stayed bridges without backstays, when the bottom of the tower bears the moment from the dead load, it is concluded that non - symmetric configuration of pile cluster corresponding to the upper structure is more practical than symmetric configuration of pile cluster

    當獨橋、無背橋等橋梁底永久作用有彎矩時,與完全對稱的礎形式相比較,和上部結構相協調的不對稱礎形式更加適用。
  2. The scenes depicted on the emunctory field, showing our ancient duns and raths and cromlechs and grianauns and seats of learning and maledictive stones, are as wonderfully beautiful and the pigments as delicate as when the sligo illuminators gave free rein to their artistic fantasy long long ago in the time of the barmecides. glendalough, the lovely lakes of killarney, the ruins of clonmacnois, cong abbey, glen inagh and the twelve pins, ireland s eye, the green hills of tallaght, croagh patrick, the brewery of messrs arthur guinness, son and company limited, lough neagh s banks, the vale of ovoca, isolde s tower, the mapas obelisk, sir patrick dun s hospital, cape clear, the glen of aherlow, lynch s castle, the scotch house, rathdown union workhouse at loughlinstown, tullamore jail, castleconnel rapids, kilballymacshonakill, the cross at monasterboice, jury s hotel, s. patrick s purgatory, the salmon leap, maynooth college refectory, curley s hole, the three birthplaces of the first duke of wellington, the rock of cashel, the bog of allen, the henry street warehouse, fingal s cave - all these moving scenes are still there for us today rendered more beautiful still by the waters of sorrow which have passed over them and by the rich incrustations of time

    二湖谷,尼那些可愛的湖泊,克朗麥克諾伊斯487的廢墟,康大寺院,衣納格峽谷和十二山丘,愛爾蘭之眼488 ,特的綠色丘陵,克羅阿帕特里克山489 ,阿瑟吉尼斯父子股份有限公司的釀酒廠,夫尼格湖畔,奧沃卡峽谷490 ,伊,瑪帕斯方尖491 ,聖帕特里克鄧恩爵士醫院492 ,克利爾岬角,阿赫爾羅峽谷493 ,林奇城堡,蘇格蘭屋,夫林斯頓的思唐聯合貧民習藝所494 ,圖莫爾監獄,卡斯爾克尼爾瀑布, 495市鎮樹林約翰之子教堂496 ,莫納斯特爾勃衣斯的十字架,朱里飯店,聖帕特里克的煉獄, 497鮭魚飛躍,梅努斯學院飯廳,柯利洞穴, 498第一任威靈頓公爵的三個誕生地,卡舍爾巖石, 499艾倫沼澤,亨利街批發莊,芬戈爾洞500所有這一切動人的501情景今天依然為我們而存在。
  3. According to the information concerned, the analogous structure were adopted on the alamilo bridge in sevilla, spain and on the curved cable - stayed bridge on golf court in xiaoye city, bingbu country, japan. at present, this kind of structure has not utilized all over the country yet. nanjing, the region of basic seismic intensity 7, is an unfavorable site for anti - earthquake in terms of geological conditions according to seismic code for buildings

    但是,主屬于傾斜高聳結構,拱屬于柔性拱結構,屬于特殊懸結構,經檢了解,西班牙sevilla的alamilo橋和日本兵庫縣小野市內高爾夫球場上的曲線斜橋採用過類似結構,國內目前尚未有此形態的結構記載,南京地區地震本烈度為七度,地質條件按照建築抗震設計規范之規定,屬對抗震不利地段。
  4. In order to satisfy the demands of the main pylon measure benchmark stakingout and the cable anchor - pipe positioning for cable - stayed bridge, a new georobot relative datum 3d polar coordinate method is presented

    摘要結合斜準放樣及斜預埋鋼管的精密定位的需要,提出了一種新的於測量機器人的三維相對準放樣方法,並成功用於灌河特大橋斜橋主橋的施工放樣。
  5. It has also pounded the keys, devices, disposition of surveyed spots, measure method and procedures, data gathering and process ( relation with construction workmanship ), error analysis and adjustment, control precision and rules, mechanism and method of control, tables of records, results and discussion. after completion, the bridge has good behaviors in dead loads state, cable forces, shape style of main beam, stress and strain of concerned sections, displacements of the tower top, which assure the reasonable state of cables, main girder and towers, and safe under running, demonstrate supervision

    通過課題研究與實橋運用,荊州長江公路大橋斜橋施工過程各狀態和成橋恆載狀態下,斜力、主梁線形、主梁關鍵截面應變、頂水平偏位等關鍵項目的施工控制結果均滿足設計期望值的要求,滿足橋梁施工范圍的要求,大橋主梁線形流暢,斜、主梁和三大體系的受力狀態合理,橋梁結構安全可靠,大橋的監測監控取得了圓滿成功,並為該橋營運階段的長期監測監控奠定了良好的礎。
  6. Burnett, a staffer from the lomax foundation, and a reporter for the sarasota herald tribune, managed to track down carter using the newspaper ' s databases

    是lomax金會的一名編輯兼薩先驅論壇報的記者,他通過搜該報的數據庫,終于發現了有關卡特的記錄。
  7. Aiming at main project of the xiaoxihu bridge, a low pylon cable - stayed bridge, based on the existing theory and method of the bridge construction controlling theory, using the basic function of " ansys ", farther exploitation was done on concrete elasticity and creep calculating distinguishingly, nonlinearity analysis theory was used to construct the space model, the main beam, string pylon and abutment were simulated by the beam elements which was considered the shearing effect. which is worthy of considering that using the geometric non - linear truss elements to simulate the stayed - cable, form traveler is modeled as structure elements and participate in stress analysis. four stages are used to model the construction stage, which are : ( 1 ) the erection of form traveler ; ( 2 ) placing the segmental concrete ; ( 3 ) jacking the tendons ; ( 4 ) tensioning the stay cables

    針對建設中的小西湖矮橋的主體工程,結合已有的橋梁施工控制的理論和方法,利用大型通用計算軟體ansys的本功能,並著重在混凝土彈性計算及徐變計算方面做了相應的二次開發,採用非線性分析理論並建立了空間結構模型、用考慮剪切作用的梁單元模擬主梁、和橋墩;用可考慮幾何非線性的桁元模擬斜、施工掛藍作為結構單元進行拆裝,參與受力計算,整個施工過程按施工循環周期分為若干階段,每個階段又分為四個工況,即:空掛藍就位、澆築完畢階段混凝土、張預應力鋼筋和張
  8. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土施工設備進場及現場管理都比較困難;柱多為空心變截面,且為高空作業,給模板工程及預應力張帶來一定困難;支撐系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;施工偏位會引起的承臺和礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心柱部分體積較大,易產生溫度裂縫。
分享友人