索閘 的英文怎麼說

中文拼音 [suǒzhá]
索閘 英文
cable brake
  • : Ⅰ名詞1 (大繩子; 大鏈子) a large rope 2 (姓氏) a surname Ⅱ動詞1 (搜尋; 尋找) search 2 (要; ...
  • : anchor gate
  1. At locks, isolated farmhouses and riverside pubs he would talk to people, hoping for hints of a military presence.

    在水、孤零零的農舍和河邊客棧,他同人聊天,希望能探聽到一些有關軍事駐地的線
  2. Blocking treatment technology for secondary grout feeding pipe of end - anchor cable of tgp ' s shiplock

    三峽船端頭錨二次進漿管堵塞處理研究
  3. The system also makes a groping research on the precision and quickness in the process of generator connection, because it captures the angle of advance with the help of fuzzy algorithm

    系統還採用模糊演算法動態捕獲合提前量,在並車合的精度和快速性方面作了有益的探
  4. Mainly adopting mathematical - statistical method and in combination with engineering practice, this paper discusses the residual life estimation method of hydraulic steel gate structure under different rusty conditions and analyses the reliability of residual life of existing hydraulic steel gate ( including extended service ones )

    主要採用數理統計理論的方法,結合工程實踐,探水工鋼門結構在不同銹蝕條件下的剩餘壽命估算方法,分析既有(包括超期服役)水工鋼門剩餘壽命的可靠性。
  5. Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier

    本文結合黃河小峽水電站泄洪預應力墩這一工程實踐,採用國際上已成熟的有限元方法,合理地建立了預應力墩的三維有限元模型,該模型可方便地按預應力錨的點位施加錨預張拉力,考慮了可能發生的多種荷載工況組合,並與無預應力墩結構進行了對比分析研究,指出其預應力效果是明顯的,可以大大改善墩結構的受力狀態,通過三維有限元分析,還得到了胸墻簡支、固端不同情況下的應力成果和各荷載下的位移成果,這些成果的取得對預應力墩的設計具有一定的指導和參考價值。
  6. I see you can say nothing : in the first place, you are faint still, and have enough to do to draw your breath ; in the second place, you cannot yet accustom yourself to accuse and revile me, and besides, the flood - gates of tears are opened, and they would rush out if you spoke much ; and you have no desire to expostulate, to upbraid, to make a scene : you are thinking how to act - talking you consider is of no use

    我看你無話可說,首先你身子依然虛弱,還得花好些工夫才能喘過氣來其次,你還不習慣于指控我,辱罵我此外眼淚的門大開著,要是你說得太多,淚水會奔涌而出,你沒有心思來勸說,來責備,來大鬧一場。你在思著怎樣來行動你認為空談無濟於事。
  7. In order to avoid the ehv system disaster caused by reclosing on the permanent fault of transmission line, adaptive autoreclosure based on microprocessor - based protection arises at the historic moment, but is still in the stage of theory study

    為了避免超高壓輸電線路採用自動重合時重合於永久性故障所造成系統穩定破壞等重大系統災難,在微機保護的基礎上,自適應重合應運而生,但尚處于理論探階段。
  8. Reinforcement effects and construction key techniques of two - ended anchors of tgp shiplock

    三峽永久船對穿錨施工關鍵技術及加固效果
  9. They tied up a 49 - year - old shop owner and his 45 - year - old brother with plastic cuffs and closed the rolling gate of the shop

    他們用膠帶綁起店內一名四十九歲東主及其四十五歲兄弟,然後關上卷
  10. In order to optimize the perpetuation tensioning tonnage of prestressed pier anchor wire of goupitan arch dam, first the scheme contrast method is adopted to define the perpetuation tensioning tonnage combination of the primary and secondary anchor wire, but the optimization result is that the pull - anchor coefficient is too big ; then the body form of the pier is optimized ; finally the anchor wire perpetuation tensioning tonnage is optimized by using ansys optimization design module based on parametric fem, the optimization result is acceptable and the pull - anchor coefficient is lowered down

    摘要為優化構皮灘拱壩中孔預應力墩錨永存張拉噸位,首先採用方案優選的方法確定主次錨永存張拉噸位組合,但優選結果拉錨系數偏大,再對墩體型進行優化,然後採用基於參數化有限元的ansys優化設計模塊對主次錨永存張拉噸位進行優化,優化結果滿足應力控制要求,降低了拉錨系數。
  11. This paper introduces the change and claim happened during construction of zhuzhou navigation - power junction ' s lock project, summarizes the control method, procedure and management effect of engineering contract variation and claim, and presents some understandings to contract variation of low - price accepted bids and claim management

    摘要介紹了株洲航電樞紐船工程施工過程發生的變更與賠情況,總結了工程合同變更與賠的控制方法、辦理程序、以及管理效果,探討了低價中標項目合同變更與賠管理的一些體會。
  12. Unstable vibrations of a steel cable in water - gate system

    鋼拉的不穩定振動分析
分享友人