綜合利用水壩 的英文怎麼說

中文拼音 [zōngyòngshuǐ]
綜合利用水壩 英文
multiple-purpose dam
  • : 綜名詞[紡織] (織布機上使 經線交錯著上下分開以便梭子通過的裝置; 綜片) heddle; heald
  • : 合量詞(容量單位) ge, a unit of dry measure for grain (=1 decilitre)
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 綜合 : 1 (歸在一起; 聯合成一個統一的整體) synthesize 2 (不同種類、不同性質的事物組合在一起) syntheti...
  • 水壩 : dam; pen
  1. At the stage of comparison of drafts, according to the fact of water resources in laiwu city, and the case of the water replenished together with used in qiaodian reservoir, it analyses that the water level heightened is necessary and feasible. it sums up an easy, rational and facile means that can be generalized in water design units at grass roots, according to choosing a best scheme by fuzzy comprehensive judgement. in the course of designing engineering, it has obtained the results such as the seepage of dam bottom, verifying the safety of dams, and the design of reinforcement, so that it ensures the safety on the engineering, and achieves the aims of prospective

    在方案論證階段,根據萊蕪市資源狀況及喬店庫來情況,分析了抬高興位的必要性和可行性,採模糊數學評判的方法,總結探討出一種簡單理,易於操作,在基層設計單位具有一定推廣價值的方案優選辦法;在工程設計中,主要對大基滲漏,大安全校核及加固設計進行了計算,並對大加固設計進行模糊優選,保證了工程安全,達到了預期的目的。
  2. The deformation situation of scouring and sedimentation in reservoir have a direct impact on the reservoir ' s lifespan, and even threat to the safety of the darn, while affect whether the reservoir can make full use of expecting multi - efficiency

    庫泥沙沖淤變形狀況直接影響到庫的壽命甚至威脅到大的安全,也同時影響到庫能否充分發揮預期效益。
  3. Reviewing and summarizing the existence theory for maintenance time decision, their shortcomings are analyzed, in which the economic factor is considered more than the safety factor. so in this paper from the point of security and risk cost the natural usage limit state reliability index is put forward as the maintenance time decision rule. the right bank section of danjiangkou dam of the south - north water transfer project ( snwtp ) as an example is analyzed to decision the maintenance time

    另外,回顧現有結構維護時間決策的準則問題,一般是偏向于從工程經濟角度考慮問題,而對結構使的安全性考慮的較少,針對上述決策準則的不足之處,本文從工程力學的角度出發,考慮了結構的安全性和風險,提出了以正常使極限狀態的可靠指標作為維護時間的決策準則,並以南北調工程丹江口樞紐的右聯混凝土為例進行了維護時間的決策分析。
分享友人