線路施工 的英文怎麼說
中文拼音 [xiànlùshīgōng]
線路施工
英文
track construction- 線 : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
- 路 : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
- 施 : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 線路 : 1. [電學] circuit; line 2. [交通運輸] line; route
- 施工 : be in the process of construction; be under construction; build; construction
-
Circuitry construction tools produced by our company are more than eight hundred of kinds in 18 series, which are suitable for foundation construction, tower group sets up the pole 、 a thread constructs 、 cable construction, optical cable construction, such as entangle and rub flexibly 、 insulating aerial cable and cable skinning device 、 aluminiam alloy cherishes the pole 、 and lead 、 card thread device of ground wire 、 high strength shackle 、 ratchet wheel board hands with sharp board hands 、 tight line device of double hook 、 lifting block 、 nylon wheel and aluminium wheel is pat the thread coaster, and etc, with full series and more kinds. as high technology and reliable quality, we have a good reputation among sane fields at home and abroad
公司生產的線路施工機具包括用於基礎施工,桿塔組立、架線施工、電纜施工,光纜施工等工序的18大類800餘種產品,如機動絞磨、絕緣架空電纜及高壓電纜剝皮器,各類鋁合金抱桿,以及導、地線卡線器、高強度卸扣、棘輪扳手與尖扳手、雙鉤緊線器、起重滑車、尼龍輪或鋁輪放線滑車等,系列全、品種多,產品具有工藝精湛,質量可靠等特點,在國內外同行業中有較高的信譽。This thesis built the models computing the working frequency over - voltage " operation over - voltage for 220kv fugai transmission line, calculates and analyzes working frequency over - voltage " operation over - voltage using emtp program and provides reasonable protection measures for the transmission line. furthermore, regulations method, traveling wave method and striking distance method are used to study and compare lightning - enduring capabilities of different types of pole in power transmission lines aiming at the fact that the lightning strike switching rate of 220kv fugai line is higher
本文分別建立了計算220kv復蓋線路的工頻電壓升高及操作過電壓的計算模型,利用emtp程序對220kv復蓋線路工頻電壓升高、投切空線過電壓、投切空變過電壓、單相故障過電壓進行計算分析,並提出合理的防護措施。Erection works of electrical installations code for construction and acceptance of cable levels
電氣裝置安裝工程電纜線路施工及驗收規范Abstract : main construction method of seamless railway at home and abroad is introduced. construction method of railway laying machine model pk1 - 20es , svm1000 , svm1000s and tcm60 is compared each other. long railway laying machine ntc which was used at qing - shen passenger seamless railway is described in detail
文摘:介紹了國內外無縫線路施工的主要方法,對pk1 - 20es型鋪軌機、 svm1000及svm1000s型鋪軌機以及tcm60型鋪軌機施工方法作了比較,並結合秦沈客運專線無縫線路施工對ntc型長鋼軌鋪設機的應用作了較詳細介紹。Liner 400 / 450mm is auxiliary in road construction activity, used in zebra crossing ( pedestrian crossing ) and entrance and exit to a highway, hand pull marker
斑馬線熱熔劃線機是熱熔標線施工的輔助設備,它是用來塗敷斑馬線(人行橫道線)及高速公路出入口標線的,施工方向為拉力方向。Basic requirements for design and test of construction machines and tools of overhead transmission line
輸電線路施工機具設計試驗基本要求Application of fx - 4800p - type electronic calculator to overhead transmission line construction
型計算器在架空輸電線路施工中的應用Specification for construction and acceptance of wire pipelines with fastening connection steel conduit
套接緊定式鋼導管電線管路施工及驗收規程Code for construction and acceptance of wire pipelines with extruded connection thin wall steel conduit
套接扣壓式薄壁鋼導管電線管路施工及驗收規范Code for construction and acceptance of 110 kv over - head electrical power transmission
架空電力線路施工及驗收規范The characteristics, construction and attentive proceeding are discussed in construction of red sandstone. a detailed description is given according practical examples, especially in blasting of red sandstone and compaction
摘要通過京九鐵路麻武聯絡線的施工,簡要地敘述了線路所處地區的紅砂巖的特性與施工,及其施工中所應注意的事項,根據實際施工情況,特別對紅砂巖的爆破及填築壓實方面進行了較為詳細的敘述。At present, the engineering enterprises often adopt the linear functional structure, but this form of organization has restricted the enterprises " development due to the opening of building industries
目前鐵路施工企業的組織結構普遍採用的是直線職能制,隨著建築市場的開放,這種組織結構已經制約了企業的發展。This paper expounds and demonstrates how the first bureau establishes its operational strategy from four sides. on the basis of analyzing its history and existing circumstances, firstly, the strategy of pluricellular management is put forward
本論文以國有大型公路施工企業路橋集團公路一局如何制定切實可行的經營戰略為主線,從四個層面進行闡述和論證。Specification for construction quality checkout and evaluation of electric equipment installation part 5 : cable line
電氣裝置安裝工程質量檢驗及評定規程第5部分:電纜線路施工質量檢驗The indoors tests of compaction, liquid and plastic limit, strength, permeability and compres - sion are done, including cement - improved - soil, lime - improved - soil, lime - fly ash - improved soil. the correctness and rationality of mixing proportion is proved according to the site of qin - shen quick - speed railway. and the construction technics of each improved soil are summarized
最後結合秦沈客運專線的施工,驗證了各摻入料配合比的正確性、合理性,歸納總結了各改良土的施工工藝、關鍵工序、質量保證措施,為今後高速鐵路路基填料的改良積累了一些資料。However, because of the natura i, historical, economic, social and pol itical reasons, in the long run, gansu industries were dispersed along the lan ? in rai ( way, circulated by its own style and system, and had little driving and spreading force to the around regions " economic development
這些形成甘肅加快工業化的歷史基礎。文章正是基於甘肅提出以結構調整為主線、實施「工業強省」的區域背景,立足新型工業化道路的可持續發展理念,對如何加快甘肅工業化做了理論分析和實證研究。Erection and acceptance regulations for overhead distribution lines with insulated conductors
架空絕緣配電線路施工及驗收規程Code for construction and acceptance of 110 500kv overhead transmission line
110 500kv架空送電線路施工及驗收規范Code for construction and acceptance of cable levels electric equipment installation engineering
電氣裝置安裝工程電纜線路施工及驗收規范The transitioonal plan for cao xi road bridge construction on the pear line seamless track
明珠線漕溪路橋無縫線路施工邊渡方案分享友人