纜索吊裝法 的英文怎麼說

中文拼音 [suǒdiàozhuāng]
纜索吊裝法 英文
erection with cableway
  • : Ⅰ名1. (拴船用的鐵索或多股粗繩) cable; hawser; mooring rope 2. (擰成多股的似纜物) thick rope; cable Ⅱ動詞(用繩索拴船) cable
  • : Ⅰ名詞1 (大繩子; 大鏈子) a large rope 2 (姓氏) a surname Ⅱ動詞1 (搜尋; 尋找) search 2 (要; ...
  • : hangsuspend
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 吊裝 : [建築] hoisting吊裝車 sling cart; 吊裝工 slinger; 吊裝豎井 emplacement hole; 吊裝套管 emplacement casing
  1. During the construction of the water pile, every key step needs floating crane. compared with cable crane, the floating crane has the characteristics of low cost, large lifting capacity, easy assembling and operating. it is a good method and can be spread and used in the deep - water construction

    在水中橋墩的施工過程中,每個關鍵步驟都需要浮作業,有了浮,無需,就完成了施工,而且浮造價低、操作靈活、拼簡易、起重量大,在深水作業中,是一種值得推廣和使用的好方
  2. Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders

    其次,根據懸橋恆載設計理想狀態建立了懸橋施工計算原理;以分段懸鏈線理論為基礎,推導了懸的線形變化剛度和懸支點的滑移剛度;介紹了懸橋成橋設計線形計算、無應力長度計算、空線形與預偏量計算、絲股架設線形計算、夾安位置計算和加勁梁線形計算的具體方、數值演算及軟體sgkz2000的計算模塊的實現。
  3. This paper also presents the methods of controlling unstressed length of cable, pre - displacement of saddle, anchor span tension, erection of wire strands, the fixed position for erecting cable band and cable length. determination and control approach of displacement of saddles during cable erection are also introduced. at the same time, the change course of linetype during construction period for suspension bridge is analyzed

    再次,介紹了懸橋的施工控制內容與方,利用軟體sgkz2000對多座懸橋進行了施工計算,提出本文關于懸橋的主無應力長度控制、鞍預偏量控制、錨跨張力控制、絲股架設控制、夾安位置與長度控制的方;介紹了梁階段鞍座頂推量的確定與控制方,分析了施工階段懸橋的線形變化過程。
  4. Abstract : through the geometric factor analysis of main cable in erection, the calculation formula of internal force of main cable is given and the analysis method of main cable safety is also discussed in detail

    文摘:通過對設備主的幾何因素分析,給出了主的內力計算與驗算公式,結合示例詳細介紹了主安全度分析方
  5. Abstract : cable - stayed is used to cable suspension, but cable force is calculated by manual, and only for less than 5 segments, and the prescion is poor. this paper puts forward “ zero moment method ”, which can not only calculate more segmental soupe force, but both temporary joint and fixed joint during construction. the mechanical concept is clear, and it is easy for calculating. it is fit for program, and the illustrations prove that the methods are right

    文摘:斜拉扣掛在中經常運用,但扣力多採用手工計算,且多用於5段以內的,計算復雜,精度低.本文提出「零彎矩」 ,可計算任意多段扣力,既可計算拱肋在施工過程中各節段臨時鉸接,又可計算各節段固結的情況,將兩種連接方式統一成一種計算方,力學概念清楚,計算簡便,適宜程,文中最後用示例證實本方的正確性
分享友人