置為頂層 的英文怎麼說

中文拼音 [zhìwéidǐngcéng]
置為頂層 英文
bring to front
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • 頂層 : attika
  1. Based on the observation and statistics on the calcareous sandstone in the ore host layer in shihongtan uranium deposit, this paper finds that the calcareous sandstone occurs on and off near the top or wash surface of the sandbody as beads - strings lens along the layer and concentres in the area where the orebodies are rich

    摘要通過對十紅灘鈾礦床容礦鈣質砂巖的觀察和統計,發現鈣質砂巖呈順、斷續的串珠狀透鏡體分佈,產出空間位砂體的底部或沖刷面,而且較集中的分佈在礦體發育區。
  2. According to their space position, the seismic features of shallow gas in this region can be divided into three groups : ( 1 ) features in the stratum : acoustic blanket, acoustic curtains, acoustic turbidity, irregular strong top reflection boundary, and phase pull - down in both flanks ; ( 2 ) features of the seabed : seabed pockmark and giant sunken pit ; ( 3 ) features in the seawater column : acoustic plumes, cloudy turbidity and point - line - type reflection

    該區的淺氣地震特徵按空間位3大類: ( 1 )地中的特徵:聲學空白、聲學幕、聲學擾動、不規則強反射界面、兩側相位下拉; ( 2 )海底面的特徵:海底麻坑、大型塌陷坑; ( 3 )海水中的特徵:聲學羽流、雲狀擾動、點劃線反射。
  3. The shear mechanism, failure mode, deformation capacity, bearing capacity and the reliability of the anchored angle steels of the wrapped steel concrete cast - in - site frame typical story exterior joints under the middle and high axial compression ratio ( n = 0. 3, 0. 5, 0. 6 ), the working performance, failure mode, and the shear capacity of top story joints under the crack moment, the hysteresis characteristic and the dissipation energy capacity of the test joints are all analysed based on the 1 / 4 model pseudo - static tests of five specimens of wrapped steel concrete cast - in - site frame exterior joints, which varied in axial compression ratio, distribution of the beam angle steels and the stirrup ratio

    基於上述分析,本次試驗通過五個外包鋼混凝土邊節點1 4比例模型的偽靜力試驗,以柱的軸壓比、梁角鋼布形式、配箍率等主要參數,分析外包鋼混凝土現澆框架一般邊節點在中高軸壓比( n = 0 . 3 、 0 . 5 、 0 . 6 )條件下,節點的抗剪機理、破壞模式、變形能力、承載能力和角鋼錨固的可靠性;分析了邊節點在張開彎矩作用下的工作性能、破壞模式和抗剪承載力;分析了試驗節點的滯回性能和耗能能力。
  4. The breath taking " blue heaven revolving restaurant " on top of the jin jiang tower, commands an incredible view of shanghai day and night

    酒店的雙旋轉餐廳遠東最大的「空中樓閣」 ,設424個餐位,經營東西方風味佳肴和各類雞尾酒。
  5. All the results can be utilized by engineers, during the designing and construction. the main conclusions are listed as follows : ( 1 ) based on the shortest line between weak interbed and limit of excavation and the location of point of intersection between limit of excavation, classification of weak interbed distribution is set up, and the distance of distribution is defined ; ( 2 ) according to the strength and deformation equivalent principle, influence zone of weak interbed is introduced, and a new method to simulating the weak interbed with thickness is built ; ( 3 ) some quantificational results on influence of weak interbed respectively at crown, right shoulder and right wall are summarized ; ( 4 ) some quantificational results on influence of weak interbed with the distance between weak interbed and limit of excavation 0. 2d, 0. 5d, l. od are gained ; ( 5 ) some quantificational results on influence of weak interbed in the rock mass with confining coefficient 0. 38, 1. 0, 1. 5, 2. 0, 3. 0 are summed up ; ( 6 ) some quantificational results are summarized on influence of the underground surrounding rock mass stability with weak interbed, in the representational surrounding rock mass graded ii, iii, iv ; ( 7 ) according to the studying results some advices are suggested on designing of underground engineering

    主要結論如下: ( 1 )以軟弱夾到開挖輪廓線最短距離和最短距離線與開挖輪廓線的交點位指標對軟弱夾的分佈部進行了分類,並確定了軟弱夾分佈距離; ( 2 )根據強度等效和變形等效的原則,引入了軟弱夾影響帶的概念,建立了模擬軟弱夾厚度的一種新方法; ( 3 )總結出了軟弱夾分佈在拱、右拱肩、右邊墻時對地下洞室穩定性影響的量化指標; ( 4 )分析出了軟弱夾距開挖輪廓線0 . 2d 、 0 . 5d 、 1 . 0d三種情況對地下洞室穩定性影響的量化指標; ( 5 )總結出了在不同的側壓力系數( 0 . 38 、 1 . 0 、 1 . 5 、 2 . 0 、 3 . 0 )地應力場中軟弱夾對穩定性影響的量化指標; ( 6 )得出了在、 、代表性圍巖中軟弱夾對穩定性影響量化結果; ( 7 )根據數值試驗成果提出了在有軟弱夾圍巖中地下洞室設計原則的幾點新內容。
  6. Guided with the theories of plate tectonics and complex hydrocarbon system, based on the analysis of geological factors of hydrocarbon pools in the northern area of tarim basin, the author puts forward the geological background favorable for and the possible areas most suitable for the formation of complex traps. the identification and description of complex traps lead to the recognization of five large and four middle or small complex traps, by the means of the main techniques and methods include the detailed interpretation of seismic profiles, drilling, logging, map compiling based on the depth of sealing surface and on the superimposed relation of stratigraphic lithology over and beneath the unconformity surfaces, and the the use of the reversion of jason and 3d coherent data. at the same time, the major controlling factors of complex trap oil pool have been analyzed based on the case study of typical oil pools in the paper

    目前,復合圈閉勘探及研究工作在我國還比較薄弱,本文以板塊構造學、復式含油氣系統等理論指導,通過對塔北地區石油地質特徵的整體解剖,從動態的角度,綜合分析和探索了塔北地區復合圈閉形成的地質背景及發育的有利區帶和領域,根據鉆、測井及地震剖面精細解釋成果,採用封閉面編圖、不整合面底板地巖性疊關系編圖方法和jason及三維相干數據體等地球物理反演技術,發現大型復合圈閉顯示2個,中小型復合圈閉4個,復查落實大型復合圈閉3個,並通過典型油氣藏解剖,分析了塔北地區復合圈閉成藏主控因素分析。
  7. The plastic qian bing of clamp of a kind of tool, what narrate plastic qian bing to be able to cover the part holding a power of park tool clamp, among them, the integral structure of plastic qian bing wraps synthesis by sub of one horniness model and photograph of sub of one soft qualitative model model, form in its whole structure have one with grasp can cover firm between the handle those who close wear a ministry, its feature depends on : sub of this horniness model is one by on, lower mould shapes directly, in its two side surround motherboard form have wear the side that cover a ministry, the mouth office that equips a ministry in its is formed have wear the side that cover a mouth, and empty section structure is shown to appear empty coping completely in its coping ; narrates weak qualitative plastic data is filled set in aforementioned to wear the side that cover a ministry, wear the side that cover a mouth and top between fully empty section, form soft wrap cladding plasticly character, shape wear the structure that cover a ministry

    一種工具鉗的塑膠鉗柄,所述塑膠鉗柄可套於工具鉗的握柄處,其中,塑膠鉗柄的整體結構由一硬質塑膠以及一軟質塑膠相包合成型,並在其整體結構中形成有一與握柄間可穩固套合的穿套部,其特徵在於:該硬質塑膠一由上、下模直接成型、在其底板兩側邊圍形成有穿套部側邊,在其穿套部的開口處形成有穿套口側邊,以及在其一完全透空的部透空區段結構;所述的軟質塑膠材料填設在前述的穿套部側邊、穿套口側邊以及部透空區段間,構成軟質塑膠的包覆,並成型穿套部結構。
  8. Digital design platform using the " top - down " design methods, this product is the highest form of the component unit began as a component of the overall system to be considered according to their products in the mutual position, played the role and function of the realization of the establishment of such products constitute the graphic layout, through to design constraints, the key design parameters, such as design information capture products to concentrate on aircraft design intent, top to bottom to transmit design information products launched throughout the design process

    數字化機構設計平臺採用「自向下」的設計方法,這種方法是從產品構成的最開始把組成整機的部件作一個整體系統來考慮,並根據其在產品中的相互位關系、所起的作用和實現的功能等建立產品構成的布局圖形,通過給定設計約束條件、關鍵的設計參數等設計信息,集中地捕捉產品整機設計意圖,自上而下地傳遞所給設計信息,展開產品的整個設計過程。
  9. Its buildings run north to south, and a walk street in the middle and retail markets at both sides ; business and catering are mainly dealt on the 1st and 2nd floors, and small - sized guest rooms, business offices and apartments on the upper floors ; the walk street, 17 m wide and 13m in part, with 4 entries and exits, set in the four directions of walk street, and it neighbors the port in the north, with game playing halls and other amusement facilities for tourists break and amusement when they wait in the port ; business offices and small hotels in the west adopt the court - style, which small scattered pattern is not only convenient to isolate operation, but also to lighting and ventilation, vertical greening by bottom roof platform, office and accommodation environment and space level and commercial value improvement

    工程建築南北走向,中間步行街,兩側門市;一、二以商業、餐飲主,上部各小規模旅館客房、商務辦公和商務公寓;步行街寬17米,局部13米,出入口有四個,分別設在步行街南北東西處,北側靠近港口處布電腦游戲廳等娛樂設施,主要供港口等候遊客短時間休息、消遣使用;西側的商務辦公與小旅館採用了院落組合式,一方面,小型化的分散布局便於獨立經營,另一方面,也有利於房間的採光通風,並利用底平臺豎向綠化,改善辦公和住宿環境,提高空間次和商業價值。
  10. Just as the passage of a supersonic jet through the atmosphere produces a shock wave, the encounter of the solar wind with the magnetosphere forms a shock wave ? known as the bow shock ? some 13, 000 kilometers upstream ( that is, closer to the sun ) from the dayside magnetopause

    就像超音速噴射機在大氣飛行時會產生震波,當太陽風碰上地球磁,也一樣會產生震波,我們稱之弓形震波,產生位約在晝側的磁外13000公里處。
  11. This layout can stop the internal arc fault expansion ; can avoid harmful moisture, small animal and dusty interferences. it also has good perfomiance and high reliability. because the heat cannot transmit to the outside of the bus room, a good operation environment for the low space can be obtained

    主母線室於箱體部一個單獨的金屬封閉的間隔內,並與10kv開關室、儀表室等間隔相互獨立,同類產品首創;這種結構可以防止內部電弧故障的擴大化,避免「火燒聯營」事故;防護性能好,防潮、防小動物侵害、防積塵,運行可靠;由於母線室的隔熱作用,空間創造了一個較好的運行環境。
  12. To exert the strength of the piles and soil between the piles sufficiently, one pile cap is put on the top of the pile, and then gravel cushion is above, in the middle of the gravel cushion a layer of steel net is placed, and all these form the pile - net - cushion composite ground

    了充分發揮樁身強度大和樁間天然地基承載力的作用,應選擇在樁的部設樁帽和加鋪碎石加筋墊,形成樁網墊的控沉疏樁復合地基。
  13. Set this state to the zero - based index of the coordinate set for each vertex that this texture stage uses

    對於此紋理貼圖使用的每個點,將此狀態設坐標集的從零開始的索引。
  14. Which often produces some unexpected problems, such as prolonging time limit of project, increasing engineering quantities and cost, etc. through test on the site, dynamic value analysis, finite element unit method, the paper researchs construction technology of in - situ pile, transfer theory, thickness of supporting layer of head slab and depth of pile in karst area, provides some important conclusions, directs effectively the design and construction of this kind of projects

    但因溶洞的分佈規律性差,現有勘探手段難於事先查明它的準確位及大小,因而常常給施工帶來意想不到的問題:工期延長、工程量增加及工程費用增加等。本文通過現場試驗、理論計算和有限單元分析,對巖溶地區鉆孔灌注樁的施工工藝、荷載傳遞機理、持力板厚度及嵌巖深度等方面進行了較系統的研究,得出了一些重要結論,有效地指導了該類工程的設計和施工。
  15. Bring this layer to the top and set to overlay at 75 opacity

    置為頂層,設疊加,不透明度75 % 。
  16. Bring to front

    置為頂層
  17. Since the position indices and texture coordinates share the same frequency, they can be added to the input layout

    索引和紋理坐標使用相同的點個數,它們能夠被添加到輸入次中。
分享友人