航道壩 的英文怎麼說

中文拼音 [hángdào]
航道壩 英文
navigation dam
  • : Ⅰ名詞(船) boat; shipⅡ動詞(航行) navigate (by water or air); sail
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 航道 : channel; lane; course; passage; fairway
  1. Groyne is a common measure used in channel improvement. it will give rise to serious consequence if the design of groyne is improper. to go deep into study of the variation of flow feature in river due to building groyne is extremely necessary

    整治中常見的工程措施之一,但若設計失當,可能帶來許多嚴重後果,對丁所形成的許多水流條件變化開展深入研究是十分必要的。
  2. The excavation on the left side of xiangjiaba hydropower plant would form the large - scale artificial slope, which refers to the main project near the source of the river and the project of intake sea - route near the mouth of the river, and its height would reach 150 meters

    向家水電站左岸開挖將形成規模較大的人工高邊坡,涉及上游段的主體工程和下游段的引工程,工程邊坡的高度達150m 。
  3. Semi - circular composite dikes are one of the main structures in yangtze estuary channel regulation project

    摘要半圓體混合堤是長江口深水治理工程中堤主要結構型式之一。
  4. Through flume experiment and numerical simulation, preliminary work on computation of water surface profile in regulation river reach, numerical simulation of flow with single spur dike in flume, and 3 - d numerical solution of flow around spur dikes group are carried out in this paper

    本文通過模型實驗和數值模擬相結合的研究方法,在整治河段一維水面曲線計算,單丁繞流數值模擬,紊流數學模型在整治工程中的應用以及丁群附近水流的三維流動特性等方面做了一些初步研究。
  5. The main measures are : damming improving flow condition riverbed excavation etc. riverbed excavation is always used in reducing velocity of a channel with bad flow condition. in singularity channel, velocity can be reduced with the increase of crossing area by excavating riverbeds

    整治採取的主要措施有:築壅水、改善流態、開挖河槽等等,對于流態惡劣的急流灘,常採用開挖河槽擴大過水斷面面積的方法來降低流速。
  6. The outline tests on the alignment of spur dikes in the flume with repeated tidal flow were carried out based on the alignment of the regulation structures in the north trough of the deep waterway in the yangtze estuary

    摘要結合長江口深水治理二期工程北槽中整治建築物的布置形式,在潮汐往復流水槽中進行了丁群不同布置形式的概化試驗。
  7. Article 19 : building of dam, sluice gate, bridge, wharf and other structures blocking, crossing or bordering a river channel ; laying pipelines or cables across a river, must comply with state - specified standards for flood control and navigation as well as other related technical requirements

    第十九條修建閘、橋梁、碼頭和其他攔河、跨河、臨河建築物,鋪設跨河管、電纜,必須符合國家規定的防洪標準、通標準和其他有關的技術要求。
  8. The research of bend channel of reach guide - lijia flume from longyang flume to lijia flume in upstream of the yellow river is proceeded to present rules of feasibility analysis for navigation between the flumes and the riverbed stability

    摘要對黃河上游龍羊峽至李家峽間的貴德李家峽河段的蜿蜒河進行了研究,為蓄水兩間的通和河床穩定性問題提供可行性分析依據。
  9. It is of great importance for the design of channel regulation structure to explore the effect of spur dikes on flow, and to study the flow structure near the spur dike

    研究丁對水流的影響規律以及丁附近水流的流動結構對于整治建築物的設計具有十分重要的意義。
  10. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管研究;蝸殼打壓、廠間伸縮節問題研究;永久船閘的引布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  11. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管研究;蝸殼打壓、廠間伸縮節問題研究;永久船閘的引布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  12. A model test on regulation of channel for batao shoal in hongshuihe river

    紅水河淘灘整治試驗研究
  13. In case a non - navigable stream or man - made waterway becomes navigable after a dam or sluice gate structure is built, the construction unit shall simultaneously build ship passage facilities or reserve sites for such facilities, and the expenses needed thereby incurred shall be borne by the communication departments concerned, unless there are other state - provisions applicable

    在不通的河流或者人工水上修建閘后可以通的,閘建設單位應當同時修建過船設施或者預留過船設施位置,所需費用除國家另有規定外,由交通部門負擔。
  14. Abstract : based on the results of hydraulic model test and remote - control ship model, the unsteady flow characteristics in the downstream approach channel and the reaches from three gorges project to gezhouba project and navigation conditions in these reaches during the tgp flood - discharge are analyzed. the measures of raising navigation discharge level and improving navigation conditions are given

    文摘:根據水工模型試驗成果,分析了三峽工程泄洪時下游引和兩間河段(三峽至葛洲)的非恆定波流運動特性,結合遙控自船模試驗對兩間的通水流條件進行了分析評價,並提出了提高通流量標準、改善通條件的相應措施。
  15. Ice dam, ice cover and ice jam, which are farmed by stack, jammed and collective ice, can increase river resistance and water stage, resulting in flood, construction damage and navigation problems

    冰塊堆積,堵塞和聚集形成的冰、冰蓋和冰塞會導致河阻力增加,致使上游水位上漲,並可能造成冰期洪水,建築物破壞,運不暢等危害。
  16. Impact of the three gorges project on the water level and navigation channel in the near - dam reach downstream the gezhouba project

    三峽工程對葛洲樞紐下游近段水位與影響研究
  17. Based on the river regime of tgp dam area and the arrangement of upper and lower access channels, the experimental research on the influence of such unsteady flow on the navigation, the evaluation of navigable conditions under the unsteady flow and the study of corresponding improvement measures are presented in this paper

    本文結合區河勢特點及上下游引布置,試驗研究了大泄洪及船閘充泄水非恆定流對上、下引影響,同時進行了非恆定流通條件評價及改善措施研究。
  18. Today, old threats continue while new threats have appeared. from the potentially damaging impacts associated with joining the european uion to the development of new dams, navigational routes and highways

    今天,舊的威脅依然存在,新的威脅也在出現,例如:加入歐盟后相關的潛在負面影響、新的堤運水和干線等。
  19. The work in this paper is concerned with the theoretical method, combined with the projects of regulation work of waterway and management information system in zhouqi - houguan of minjiang river

    本文各章不僅進行了理論研究,同時還結合交通部人材基金項目和閩江水口整治項目和閩江信息管理系統項目進行了應用研究。
分享友人