裂頭屬 的英文怎麼說

中文拼音 [liètóuzhǔ]
裂頭屬 英文
dibothriocephalus
  • : 裂動詞[方言] (東西的兩部分向兩旁分開) open
  • : 屬名詞1 (類別) category 2 [生物學] (生物分類系統上所用的等級之一) genus 3 (家屬; 親屬) fami...
  1. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提高了壩體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金模板網作為一期混凝土模板;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接機械連接技術,有效提高了接強度和鋼筋連接速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及縫處理技術的應用,提高了建築物的整體性和耐久性。
  2. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能混凝土技術、上海寶鋼礦石碼鋼筋混凝土防腐蝕技術、江陰長江大橋大體積粉煤灰混凝土技術、南京長江二橋泵送混凝土技術等提供咨詢建議。
  3. But it was the thousands of metal fragments that did the real damage, ripping and screaming through the air, to bounce off stone or metal, or all too often to cut through flesh

    但是數千金破片足以造成實實在在的破壞,帶著尖厲的嘯叫撕了空氣,在石和金上迸射彈跳,或是有太多的機會刺穿身軀。
  4. Chelsea ' s keeper has had two metal plates inserted in his head to stabilise his fractured skull

    切爾西門神切赫的部在手術中被植入了2塊金片來固定碎的顱骨。
  5. 16mnr and 45 # steel are taken as examples. the obtained results have been applied to analyze the safety of operation pressure and rationality of design of a kind of engineering structure - a flange joint of hemispherical head to cylindrical shell. try to seek a sort of new method to assessment the capability of structure to load beyond the traditional method which regards stress and strain as main parameters

    本文以45 ~ #調質鋼和壓力容器常用鋼材16mnr為研究對象,對金材料韌性斷的斷模式進行細觀機理上的研究,進而分析一種工程結構? ?採用與筒體厚度不同的半球形封的壓力容器的筒體連接結構? ?的靜載變形特點和破壞形式,嘗試在以應力應變為主要參數的傳統方法之外,尋求一種新的結構承載能力分析的方法。
分享友人