裝載重量 的英文怎麼說

中文拼音 [zhuāngzǎizhòngliáng]
裝載重量 英文
laden weight
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 裝載 : freight; loading; shipping; capacity; storage; embarkation; laden
  • 重量 : weight; scale; heft
  1. The weight and / or volume necessary to qualify for a rail carload rate, or a rail car loaded to its capacity

    合乎鐵路滿費率限定所需的和/或體積,或是滿車的鐵路貨車。
  2. The carload quantity referred to on a carload rate has nothing to do with the actual quantity required to fill the rail car, but is the minimum weight specified to qualify for a lower class rate

    指的是車費率,與需要滿整車的實際數無關,而是指合乎較低的費率限定所規定之最低
  3. In the study of the lumber carrier, one of the very important problem is the in spot and ultimate station due to flooding which will bring tremendous threat to the ship because of the few holds in order to study the lumber carrier buoyancy, stability and longitudinal strength under the condition of flooding, the paper adopt fundamental ship principle and iterative and accumulative concept on the basis of insumersibility theory to detailedly calculate the flooding speed flooding amount front draft after draft stability and longitudinal strength considering the ship " s sinking and inclination which will change the center of gravity and the loading station both in hold and on deck and the effect of flooding and lumber amount in holdo in the last, the paper introduces an example of the actual ship named " fei yun ling " and makes a contrast between not taking measure and taking measure which draws a reasonable conclusion and comes up to some advice the method avoids the cockamamie calculating while insures enough precision the paper draws a conclusion that not all the lumber carrier will submerge when suffering the damaged flooding if the loading or measure is suitable

    為了研究運木船舶在破艙狀態下的浮性、穩性和強度,本文在抗沉性理論的基礎上,運用船舶基本原理,採用了迭代和累計的思想,將船舶的進水過程劃分為很多次進水的積累,詳細計算了運木船在破艙進水的過程中,考慮到各種破艙參數、船舶本身的下沉、艙室內木材、甲板貨的情況和在進水過程中船舶本身的傾斜對進水心的影響,以及艙室內的進水和木材對破口處進水速度的影響,船舶總的進水速度、進水、首尾吃水、穩性的實時狀態和最終船舶的總縱強度,給出了計算實例,並進行了在採取用泵抽水前後浮態參數的對比,得出了該船舶在艙室內的貨物積達到某個數值時可以保證船舶在破艙進水時不會沉沒,或者在當開口小於某數值時,採取適當的措施后,可以使船舶避免沉沒。
  4. Article 93 a voyage charter party shall mainly contain, interalia, name of the shipowner, name of the charterer, name and nationality of the ship, its bale or grain capacity, description of the goods to be loaded, port of loading, port of destination, laydays, time for loading and discharge, payment of freight, demurrage, dispatch and other relevant matters

    第九十三條航次租船合同的內容,主要包括出租人和承租人的名稱、船名、船籍、、容積、貨名、貨港和目的港、受期限、卸期限、運、滯期費、速遣費以及其他有關事項。
  5. The weight gain of powders could be slightly increased with the increasing ph value, formaldehyde dosage and powder loadage, but the most utilization ratio of silver was only 35. 2 percent. the composite powders with the silver content between 13 % ~ 70 % were produced

    盡管提高ph值、甲醛及粉體的能在一定程度上增加化學鍍后粉體增即銀的析出,但遠低於理論析出值,銀的最大利用率僅為35 . 2 。
  6. Article 75 if the bill of lading contains particulars concerning the description, mark, number of packages or pieces, weight or quantity of the goods with respect to which the carrier or the other person issuing the bill of lading on his behalf has the knowledge or reasonable grounds to suspect that such particulars do not accurately represent the goods actually received, or, where a shipped bill of lading is issued, loaded, or if he has had no reasonable means of checking, the carrier or such other person may make a note in the bill of lading specifying those inaccuracies, the grounds for suspicion or the lack of reasonable means of checking

    第七十五條承運人或者代其簽發提單的人,知道或者有合理的根據懷疑提單記的貨物的品名、標志、包數或者件數、或者體積與實際接收的貨物符,在簽發己船提單的情況下懷疑與已船的貨物不符,或者沒有適當的方法核對提單記的,可以在提單上批註,說明不符之處、懷疑的根據或者說明無法核對。
  7. The experiment procedure and analysis result about exteriorly extended end - plate connection with high strength bolt are introduced primarily ; each sample ' s dimension is given. the adding load equipment, measuring apparatus placed, measuring point established is detailed. adding load measure load and m - curve is produced ; the single span gabled frames horizontal displacement formula is deduced when the horizontal concentrated force is applied to it

    點介紹了外伸端板高強螺栓連接的實驗過程及實驗分析結果,介紹了各組試件的形狀尺寸、加置、測儀器安放、測點的布置等;給出加方式及測出的m -曲線;計算出試驗節點的初始剛度;推導水平集中力作用下單跨門式剛架考慮節點半剛性的側移計算公式。
  8. With globalization the performance of ocean ships served for international business is becoming larger. today the maximal volume of a container vessel has been even 8000teu and the loading capacity of a bulk cargo ship could be up to 400, 000 ton

    隨著全球經濟一體化的不斷發展,服務于國際貿易的遠洋船舶單體能力也日益增大,目前最大的集箱船的已達8000teu ,最大的散貨船舶已達40萬噸。
  9. Rated installation speed m min

    額定kg
  10. Charged weight of load

    計費的裝載重量
  11. Specification for standard automatic roller - type coupling for semi - trailers of 7 tons to 143 4 tons laden weight

    裝載重量為7至14 . 25噸的半掛車用的標準自動滾柱式連接器規范
  12. Method of increasing loading mass of super heavy low platform trailer

    提高超型低平臺掛車的方法
  13. Shipping advice : the sellers shall immediately upon the com - pletion of the loading of the goods advise the buyers of the con - tract no names of commodity loaded quantity invoice values grossweight names of vessel shipment date by tlx / fax

    運通知:一俟運完畢,賣方應即電告買方合同號、品名,已、發票總金額,毛,運輸工具名稱及啟運日期等。
  14. Unless there are other means to prevent lifting a motor vehicle exceeding the capacity of the platformequipment, an overload device should be installed to prevent any movement of the platform and to give an alarm when the load on the elevating platform is in excess of the rated capacity

    如沒有採取其他措施防止平臺設備提升超逾其負的車輛,便須設過安全置,在平臺負荷超逾其額定時停止操作,以及發出警報。
  15. The sellers shall immediately, upon the completion of the loading of the goods, advise the buyers of the contract no, names of commodity, loaded quantity, invoice values, gross weight, names of vessel and shipment date by tlx / fax

    一旦運完畢,賣方應即電告買方合同號、商品號、已、發票總金額、毛、運輸工具名稱及啟運日期等。
  16. Shipping advice : the sellers shall immediately, upon the completion of the loading of the goods, advise the buyers of the contract no., names of commodity, loading quantity, invoice values, gross weight, names of vessels and shipment date by tlx / fax

    運通知:一俟運完畢,賣方應即電告買方合同號、品名,已、發票總金額,毛,運輸工具名稱及啟運日期等。
  17. Shipping adice : the sellers shall immediately, upon the completion of the loading of the goods, adise the buyers of the contract no, named of commodity, loaded quantity, inoice alues, gross weight, names of essel and shipment date by tlx / fax

    運通知:一俟運完畢,賣方應即電告買方合同號、品名,以、發票總金額、毛,運輸工具名稱及啟運日期等。
  18. Shipping advice : the sellers shall immediately, upon the completion of the loading of the goods, advise the buyers of the contract no, names of commodity, loaded quantity, invoice values, gross weight, names of vessel and shipment date by tlx / fax

    運通知:一俟運完畢,賣方應即電告買方合同號,品名,已,發票總金額,毛,運輸工具名稱及啟運日期等
  19. Shipping advice : the sellers shall immediately, upon the completion of the loading of the goods, advise the buyers of the contract no, named of commodity, loaded quantity, invoice values, gross weight, names of vessel and shipment date by tlx / fax

    運通知:一俟運完畢,賣方應即電告買方合同號、品名,以、發票總金額、毛,運輸工具名稱及啟運日期等。
  20. Road vehicles. seft sustained heating systems installed on commercial vehicles over 3, 5 t gvw. part 4 : specific safety requirements for vehicles transporting dangerous goods

    道路車輛.安在毛大於3 . 5噸的商用車輛配套式加熱系統.第4部分:危險物品運輸車輛的特殊安全要求
分享友人