裝配式施工 的英文怎麼說
中文拼音 [zhuāngpèishìshīgōng]
裝配式施工
英文
fabricated construction- 裝 : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
- 配 : Ⅰ動詞1 (兩性結合) join in marriage 2 (使動物交配) mate (animals) 3 (按適當的標準或比例加以...
- 式 : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
- 施 : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 裝配 : assemble; fit together; fit out; assembling; fitting; rigging; erecting; fabrication
- 施工 : be in the process of construction; be under construction; build; construction
-
Design department of the group competed independently external appearance and internal decoration design of yuanda center, among which, the design and construction of overhanging steel canopy toped buildings in beijing city. the external wall is composed of high - class granite and glass curtain from brazil, showing splendor of modern building. consisting of steel, glass and stone, the internal decoration incarnates the moving rhyme of 5a grade office building, make it a classic masterpiece in the industry in beijing city
遠大中心的整體外觀和全部內裝修均由我集團設計部獨立完成,其中「懸挑式鋼結構雨棚」的設計和施工堪稱北京之最,由巴西的皇室高檔花崗巖石材和玻璃幕組成外墻,體現了建築的雄偉氣勢,而主要由鋼、玻、石等現代材料精心搭配構造的內裝則體現了5a寫字樓的現代動感,使之成為北京建築行業中的經典之作。Used to component joint water - proof, building distortion seam, construction seam and metal, concrete etc seam water - proof, for example, tunnel, substructure etc underground seam water - proof construction
適用於裝配式結構構件砌接縫防水,建築物變形縫、施工縫用和金屬、混凝土等各類預製件的接縫防水,例如:隧道、人防、基礎工程等地下工程的接縫防水。Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating
箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。In a situation that this imported product demand will also be improved further in the following several years, must optimize system this purchase, transport, load and unload, store, dredge competence of link of transporting etc., introduce the advanced idea and method on the materials supplies of expressway construction abroad, adopting more advanced modern material flow thought on the software, the pitch is provided and deliver to constructing ; develop performance excellent keeping the tank wagon warm with low costs on the hardware ; supply the barge special - purpose and in bulkly ; the special - purpose pitch shipping dock stores pot, etc. to equip, thus propose that the transport way in which our country imports the pitch is chosen, and use the economic technological demonstration method to carry on the demonstration of economic technology to these ways, therefore get our country out of and impor t the imagination of transporting way reform of pitch, propose and purchase and concentrate on and melt, transport in bulk to take the whole province or the whole country this supply platform and accord with international advanced transport suggestion of technology in unison
在未來幾年這一進口產品需求量還將進一步提高的情況下,必須優化這一體系在采購、運輸、裝卸、貯存、疏運等環節的水平,引進國外在高速公路建設的原材料供應上的先進思想和做法,軟體上採用較先進的現代物流思想,對施工瀝青進行配送;硬體上研製成本低、性能優的保溫槽車;專用散裝供應駁船;專用瀝青裝卸碼頭貯罐等裝備,從而提出我國進口瀝青的運輸方式選擇,並運用經濟技術論證方法來對這些方式進行經濟技術方面的論證,由此提出我國進口瀝青運輸方式改革的設想,提出采購集中化、運輸散裝化這一全省或全國統一供應平臺且符合國際先進運輸技術的建議。The results of the research indicate that the assembled highway bridge steel truss is an effective means to resolve the common problems of falsework over river for construction of cast - in - situ prestressed concrete continuous girders
研究表明,採用裝配式公路鋼橋桁架解決跨河預應力混凝土連續梁現澆混凝土施工支架問題是有效的。This paper mainly makes the research of construction method for cast - in - situ concrete box girder of continuous girder bridge, using assembled highway bridge steel truss ( often known as bailey truss ) as the falsework, technical schemes for the falsework erected over river, particularly the rigid slant supports of the falsework on piers, and analysis, calculation methods and deformation of the falsework in accordance with the related tests in field
摘要主要研究了採用裝配式公路鋼橋桁架(通常稱為貝雷架)做為支架進行連續梁橋現澆箱梁混凝土的施工方法;研究了跨河施工支架的技術方案,特別是施工支架在橋墩上的剛性斜撐,同時結合現場試驗研究了施工支架的分析計算方法及變形。Concrete structure of prestressed composite slab surmounts shortcoming of the traditional slab, has the merits of cast - in - site structure and assemble structure, such as larger integer rigidity, preferable anti - seismic property, lower material consumption and cost, shorter construction period, and simple construction technology. the structure can be applied to high - rise and popularized in engineering construction
混凝土疊合樓蓋結構克服了傳統樓蓋的不足,兼有現澆和裝配式結構之特點,具有整體剛度大、抗震性能好、節省材料、降低造價、縮短工期、施工方便等優點,能在多、高層建築中使用,可在工程建設中廣泛投入應用。This thesis mainly researches second - prestressing precast slabs, it is important to study its one - way slab floor ' s ability in use. specific content include : imitate construction load lab, through this method to analyze the precast slabs " properties in the first stage in burden load. one - way precast slabs " lab, analyes one - way precast slabs sandwich s ability in second burden load stage
具體的研究內容有:模擬施工荷載試驗,即對裝配整式夾層板第一受力階段進行研究;單向裝配整體式結構的第二受力階段的性能進行研究,並分析了二次張拉預應力筋所引起的結構的變形和應變與計算結果進行對比。Its drive linkage is assembled, and need not be welded or cut on the construction site, so the construction period is reduced on the site and maintenance and dismantling is also easy
傳動連桿採用裝配式,在施工現場不必進行切割或配焊,縮短了產品在運行現場的施工期,檢修與解體也比較方便。Our aim is to display high - rate product, exchange authentic information, promote development of trade, accelerate marketing for the new products, offer a series of service, use tangible assets to power incorporeal assets for increment. as a platform of exhibition and trade, which takes the group purchase and stream of information as principle, we hope to combine international trend, lead domestic stream and interpret ideal life. century building fully represents the developing trend of advanced residence, and reflects characteristics on safety, energy saving, environmental protection, automation, personality etc. let s start here for the sustained development of china s housing industry
具體有實景參觀剖面展示透明展示集成配套的動態展示觸摸式計算機,使觀眾全方位了解認識感受體會集成住宅在建築體系科技含量材料工藝精美裝飾等方面具有的特點優勢綜合效能及可操作性並便利查詢安排結構設計施工部品等各環節專業人員對觀眾的具體需求進行詳盡解說,提供訂單設計配送安裝結算保險等一站式服務,完全實現消費者的房屋設計權功能要求權性價比的知情權,避免了傳統購房的種種煩惱,足不出戶即了解世界住宅發展趨勢及文化。Subassemblage and prestressed concrete frames are assembled by precast prestressed beams and columns with tendons in the joints of the frames. these beams and columns are hoisted in site and the tendons are passed through the moire pipes. so prestressing force are brought to the joints of the frame. these tendons also can assume the moments at the end of the beams in ordinary condition
預壓裝配式預應力混凝土框架是採用工廠化生產的預制柱和預制預應力梁,運至現場直接吊裝,樑柱就位后,將后張預應力筋穿過樑柱預留孔道,對節點實施預應力張拉預壓。Measures to the problems of refrigeration technique for assembly cold store
裝配式冷庫製冷工藝存在的問題及解決的措施In practical application, it is often applied and extensively to floorslab structure in particular, and has prominent advantages as economizing materials, convenienting for construction, being in favor of resisting earthquake action, better monolithic property than assembled concrete structure
在工程實際應用中,特別是在樓蓋結構上的應用較為廣泛,且優點比較突出。這種結構整體性好,抗震性能優越(相對裝配式結構而言) ,節省三材,施工方便且縮短工期(相對整澆結構而言) 。By way of these tendons, precest beams and columns can be assembled conveniently, and the joints and frame are monolithic and continuous. consequently, compared with common reinforced concrete frams, this kind of frame systems possess higher reliability and solved the problems in the process of assembling prestressed concrete frames. also it forms the framework of subassemblage and prestressed concrete frames, and explores a new way for industrial production of prestressed structures. by analyzing this system, a series of conclusion are provided, incluing modulation of bending moment produced by vertical loads within beam end, secondary internal forces produced by pretress force, shear resistance of the end of beams, the influence of lateral restrains. theresearch results of this paper are proved to be practical. some advices are also brought forward on the design process
后張預應力筋既可作為施工階段拼裝手段,又可在使用階段承受梁端彎矩,構成整體受力節點和連續受力框架,克服了裝配式節點受力可靠性差的缺陷,解決了預應力混凝土框架難以裝配的問題,形成預制預應力混凝土裝配整體式框架,開辟了預應力結構工業化生產的新途徑。本文針對預壓裝配式預應力混凝土框架,從豎向荷載作用下的梁端彎矩調幅、施加預應力在框架中產生的次內力、梁端抗剪承載力、考慮側限的無側移框架的承載力分析四個方面對該種裝配式結構體系的性能做了詳細的研究。Subassemblage and prestressed concrete frames are assembled by precast prestressed beams and columns, which are made in the factories, with tendons in the joints of the frames. so the joints and frame are monolithic and continuous, consequently, this kind of frame systems possess higher reliability and solve the problems in the process of assembling, exploring a new way for industrial production of prestressed structures
預壓裝配式預應力混凝土框架是採用工廠化生產的預制柱和預制預應力梁運至現場安裝,並對節點實施二次預應力張拉,構成整體受力節點和連續受力框架,克服了裝配式節點受力可靠性差的缺陷,開辟了預應力結構工業化生產的新途徑。分享友人