裝配應力 的英文怎麼說

中文拼音 [zhuāngpèiyīng]
裝配應力 英文
assembly stress
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : Ⅰ動詞1 (兩性結合) join in marriage 2 (使動物交配) mate (animals) 3 (按適當的標準或比例加以...
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 裝配 : assemble; fit together; fit out; assembling; fitting; rigging; erecting; fabrication
  1. The article adopts theories such as stress - focus to calculate the structures stress ; the assembly stress and the product conditions are the keystones of production ; whether expediently replace glass in the field and damnify framework are considered in servicing ; the new lifesaving way the request which proposed to the cabin design mainly considers the access cabin overall rigidity

    分析主要採用集中等理論對結構進行計算;生產過程主要考慮裝配應力和生產條件;維護主要考慮是否利於外場更換玻璃和更換玻璃對框架的損傷;新救生方式對艙蓋設計提出的要求主要考慮艙蓋整體剛度。
  2. Add in new deployments, productivity and downtime issues, a diluvium of new products, services and vendors, and the difficulty of finding and retaining the professional resources you need

    再加上,安置新軟硬體、生產降低和當機時間、各式各樣的產品服務或供商、以及找到及留住專業資源的困難性。
  3. The stress state in the stainless steel pipe - titanium alloy pipe - nitinb shape memory alloy connector system is analyzed by using the theory of solid mechanics and the recovery rules of nitinb shape memory alloy with constrains on the basis of analysis of the structure of the connector system and the all steps in the preparation and the service. a mathematical model for the strength was proposed. the temperature dependence of connecting force and the maximal stress intensity in the pipe connector in the process of preparation and service was studied by programming and computing. the computing results show that the difference of heat expansile coefficient between the coupling material and the pipe material leads to the strength of connector system at room temperature less than the strength at high temperature

    通過分析管接頭結構以及制備、使用的各個步驟,運用固體學的基本理論,結合nitinb形狀記憶合金在約束下的回復規律,對不銹鋼- -鈦合金管- -四川大學碩士論文nitinb形狀記憶合金管接頭系統內的狀態進行了理論分析,建立了強度的數學模型,通過編程計算,研究了不銹鋼一鈦合金管一nitinb形狀記憶合金管接頭系統及使用過程中的抱緊以及最大強度隨溫度變化的規律。
  4. Three main problems caused by normal force when linear motor was used in machine tool were presented

    發現了法向吸在直線電機的實際用中導致的推波動問題、問題和機床隔磁問題。
  5. A single fiber can be employed for multiple data streams simultaneously. all - optical networks employing the concept of wdm and wavelength routing are considered as the transport networks for the future

    鑒于目前具備全波長轉換能的波長路由節點仍然相當昂貴,因此實際用中為所有網路節點全波長轉換器的作法並不現實。
  6. Many single low - income women who try to enter the work force find themselves competing for jobs that require business clothes they can ' t afford. that ' s where suited for change comes in

    很多努尋找工作的低收入單身婦女發現,自己要通過競爭找到工作,需要合適的職業服,但是她們買不起。這就是「搭改變」這個機構運而生的原因。
  7. While a 3d assembly model of blade - disc structure was established, a finite element model for calculating the vibration characteristics during blade - disc coupling was set up by taking into consideration of the coupling action of contact stress between blade and disc

    摘要在建立了葉片與輪盤三維模型的基礎上,考慮了由於產生的接觸與葉片輪盤之間的耦合作用后,建立了葉片輪盤耦合的振動特性計算的有限元模型。
  8. You will need to have experience in sales in china ? preferably with shipyards or power plant supplies and with mechanical, electro mechanical or hydraulic components

    你需具有中國區銷售拓展的經驗,有船舶、動設備供商和機械、電機械或液壓等經驗者尤佳。
  9. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊鋼筋骨架入模;拆式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;變雙控制確保預施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  10. Building insulation therefore may be necessary as a last resort. insulation usually involves upgrading the electrical supply, improving windows and installing new air - conditioning units

    隔音置一般需對電及窗戶設計作出改善措施,同時並需全新空調系統。
  11. Based on the experimental results, in concrete limitation stress sandwich first stage ' s ability and one - way and two - way precast slabs sandwich, results content code require - second class crack control. resistant crack calculation is appropriate. because post - tensioned prestressed advances plane ' s resistant crack. deformation and section strain measure accord with calculation results, this indicates 3d - gridding beams modulus is reasonable to precast slabs sandwich

    本文通過對試驗數據的分析總結,認為:單塊夾層板第一受階段的性能試驗及單向和雙向整體式夾層板的性能試驗,滿足《混凝土結構規范》 ( gb50010 - 2002 )中關于預樓板的二級裂縫控制等級的要求,抗裂設計得當;由於板縫無粘結預筋的存在提高了板的抗裂性。
  12. This article describes a way of special ultrasonic system which monitors thermal stress in seamless welded rails. this monitoring system is a non destructive testing system, which adopts avr mcu and high - precise time chip processing as the core of it, and adopts the critically refracted longitudinal wave as the object of measuring. my studying focuses on the theory of the monitoring system, which will be listed in this arctile : according to the snell theory, the theory of motivating of critically refracted longitudinal wave is described in details, and the finite element software is used to emulate the propagating course. the formulas of calculating the pts of swr are taken from the acoustoelasticity theory, and the calculating the parameters is introduced. according to assemble materials, three kinds of ways of monitoring the pts of swr using critically refracted longitudinal wave are described, which are measuring the sound - time in changeless distance, ultrasonic critical - angle refractomery and frequency spectrum, the first way of ways is used in this experiment system. the factors, which effect the monitoring system, are assaid in some degree based

    本文的研究工作重點在無縫焊接鋼軌溫度測量系統的理論模塊,包括根據snell原理,研究極限折射縱波的激發機理,並使用有限元軟體ansys進行模擬;根據聲彈性理論以及公式推導出計算無縫焊接鋼軌中的溫度的公式,並對其中參數的求解方法進行介紹;根據收集的資料,介紹了三種使用極限折射縱波測量無縫焊接鋼軌溫度的方法,即固定距離測量聲時法、臨界角折射法和頻譜分析法,本實驗系統使用的是第一種;根據實驗經驗以及相關資料,分析了影響極限折射縱波測量溫度的幾個因素,並提出了相的解決方法;根據實驗系統的需要,獨立設計並加工出相關套的實驗設備,包括實驗鋼塊、有機玻璃楔塊、固定件、載荷外框置等。
  13. Time standards for nkr front axle assembly line, jap, is reset based on modapts, and time unit is reduced, and capability of the line is induced. the balance rate of the assembly line is developed from 62 % to 76 % by process elimination, combination, rearrangement, and simplification applied with rules for motion economy and eff iciency

    論文用模特排時法對江鈴車橋廠nkr前橋線重新制訂工時定額標準,降低線生產節拍,提高線生產能,按照動作經濟原則,通過工序剔除、合併、重排、簡化使前橋線作業平衡率由62提高到76 。
  14. The research indicates that the subassemblage and prestressed frame joint has good seismic performances and anti - crack behaviors, providing theoretical support and test data for the spreading and appling the subassemblage and prestressed concrete frames in our country

    本文研究表明,預壓式框架節點具有良好抗震性能和抗裂能,為預壓式預混凝土結構在我國的推廣用提供理論依據和試驗資料。
  15. The results of the research indicate that the assembled highway bridge steel truss is an effective means to resolve the common problems of falsework over river for construction of cast - in - situ prestressed concrete continuous girders

    研究表明,採用式公路鋼橋桁架解決跨河預混凝土連續梁現澆混凝土施工支架問題是有效的。
  16. Tow speciments of prestressed fabricated beam - column subassembly were tested under reversed cyclic loading. experimental studies were carried out to investigate the strain distribution, failure mechanism and load - bearing capacity on the beam - column connections, as well as ductility, hysteresis curves energy dissipation, displacement restoring capacity of full pc speciments

    本文通過兩榀預壓式樑柱組合體在低周反復荷載下的試驗,了解了預壓式框架梁端截面變分佈、破壞機理和極限承載能;探討了全預筋截面延性特徵、滯回性能、耗能能和變形恢復能
  17. A common recognized method for the shaft alignment, is to set up a physical model, and appropriately locate each bearing in compliance with the required bearing load, stress and shear force and slop etc, so as to fix the shaft with the curve line as required and obtain a right distribution of bearing load

    對于軸系校中計算,國內外比較通用的方法是對軸系相關的要素進行處理,建立物理模型,按照規定的軸承負荷、,轉角等限制條件,確定各軸承的合理位置,將軸系安成規定的曲線狀態,以達到使各個軸承上的負荷合理分
  18. Then the initial stress was calculated with proper load and the assembly process simulation

    模擬夾緊過程施加載荷約束,並計算該過程中鋼板彈簧內部產生的預
  19. Following the development trend of valve cad, according to the requirements of the chengdu chengfeng valve limited company and based on mdt, this article develops the 3d parametric valve design system. the main work and achievements are as follows : based on the 2d engineering drawing of the several different valves the company provided, the 3d parametric basic drawing - base is set up using mdt which is a 3d design platform, including all the parts drawings and the general assemblage drawings of the valve models ; in accordance with the common steps of the valve design, the parameter editors are designed to edit, import and export the valve parameters and are provided with the function of double synchronization on parameters displaying for convenience in use ; in order to meet demands of users and make the design more accurate, reliable and practical, the assistant formula calculators are developed, which can automatically do all types of structure calculation in the procedure of valve design, and export the calculation manual of valve design ; in order to make designers more rivalries, taking full advantage of internetmntranet technology, the virtual design center is developed, which integrate netmeeting, terminal service and super links, so that the designer can directl y use applications on remote server, communicate with other designers on intranet / internet, share software resources and realize long - distance cooperative design

    根據閥門cad發展趨勢,針對成都乘風閥門有限責任公司閥門設計現狀,本課題基於mdt三維設計平臺開發了閥門三維參數化設計系統,主要完成的工作和成果如下:根據公司提供的幾種不同結構閥門的二維工程圖紙,利用mdt三維設計平臺建立了三維參數化基本圖形庫,其中包括所有零部件和總模型圖及二維工程圖;依照閥門設計的一般步驟設計了參數編輯器,用來對閥門尺寸參數進行編輯、輸入、輸出等,具有參數雙向同步顯示功能,使用十分靈活方便;根據用戶的需求,為了使設計達到精確、可靠、實用的要求,設計開發了輔助計算器,能自動完成閥門設計過程中所需的各種結構計算,並可以輸出閥門設計計算說明書;為了使設計人員更具有競爭,本系統利用internet intranet技術設計開發了虛擬設計中心子模塊,虛擬設計中心集成了網路會議、終端服務、超級鏈接等功能,可以讓設計師直接使用服務器上的用程序,與intranet internet上的其他設計專家進行交流、共享軟體資源,實現遠程協同設計。
  20. Stress analysis of assembling automotive engine cooling pipe

    汽車發動機冷卻水管裝配應力分析
分享友人