襯砌拱 的英文怎麼說

中文拼音 [chèngǒng]
襯砌拱 英文
lining arch
  • : Ⅰ動詞1 (在裏面托上一層) line; place sth underneath 2 (陪襯; 襯托) set off Ⅱ名詞(襯在裏面的附...
  • : 砌Ⅰ動詞(用磚、石等壘) build by laying bricks or stones Ⅱ名詞(臺階) step
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  1. Numerical analysis of secondary lining in double - arch tunnel

    雙連隧道二次施工數值分析
  2. Evaluation of the effect of collapse in top area of a double - arched tunnel on its the secondary lining

    雙連隧道洞頂坍方對二次穩定影響評價
  3. Optimized techniques for fabricating the secondary lining of a two - storey shallow subway station with single arch and one row of columns excavated by mining method

    單柱雙層淺埋暗挖地鐵車站二次優化施工技術
  4. Pass through mechanical model calculate, discover the vault and arch foot part in the tunnel secondary lining thickness is weakness part, so at the design and construction must strengthen these part

    通過力學模型計算,結構在腳與仰交接處以及頂部位為隧道二次混凝土結構的薄弱部位,設計和施工時應著重加強。
  5. At the part vault and arch foot in the tunnel secondary lining thickness, the standard difference and variance parameter is large than others, so insure the part thickness achieve design require by adjust construction craftwork

    隧道二次厚度在頂和腳的部位的標準差和變異系數較大,在施工中應該考慮調整施工工藝,確保這兩個部位的厚度。
  6. With an analysis of soil liquefaction potential for free field of nanjing metro line 1 under 7 degree earthquake, as well as for excavated field, in line with railway engineering anti - earthquake design specification, dynamic triaxial tests and theoretical analysis using efficient stress method, the author comes to the conclusion that, when metro plate is located at layer s and the layer is thick, liquefied area is at metro bottom plate ; in some local section liquefied area is at metro top plate, or arch sides at the top of metro in most places

    摘要採用鐵路工程抗震設計規范、動三軸試驗及有效應力的理論分析相結合的方法,對南京地鐵南北線( 1號線)區間隧道開挖后其地基土在7度地震情況下的土層液化情況進行分析得出:當隧道底板坐落在5層且5層較厚時的液化區出現在隧道底板處;局部地段液化區出現在隧道頂部及腰;大部分地段的液化區出現在隧道頂板上方。
  7. Study on plunge pool concrete lining stability for flood dischare of a high arch dam

    壩泄水墊塘穩定性研究
  8. Combined with the real example of monitoring pressure on the supporting system in the long span underground space of dk7 + 692 section at jiao - xin line of chongqing light railway, it is set forth the methods about choosing the support system and its parameter, digging methods of underground space, measuring and testing methods for the stress of the support system ; the testing results and variation pattern were analyzed for the stress of the initial supporting i - steel axial stress of bolt, stress of shot - concrete, supporting pressure of temporary i - steel and stress of steel of the second lining, then, the reason for deformation of the support system induced by sharp increase of i - steel was determined

    摘要結合重慶市輕軌較新線大坪車站大跨度地下空間dk7 + 692斷面施工支護體應力監測的工程實例,闡述了該大跨度地下空間支護結構的參數選擇、地下空間的開挖方法、支護體結構的應力量測方法及測試手段;分析了支護體初期支護工字鋼應力、錨桿軸力、噴射混凝土內應力、臨時工字鋼支撐應力、二次鋼筋應力等測試結果和變化規律;確定了工字鋼應力急劇增大而可能引起支護體系失穩的原因。
  9. Through analyzing all kinds of construction methods of building metro station under shield driven method in many countries, this paper studies the construction technique ( method ) of building metro station under shield driven method, taking in guangzhou no. 3 metro line, and linhe xilu station as the actual object. according to station class, function and topography and geology, the station schemes of twin - bore tunnel ( island ), firstly, three parallel tunnels ( island ), tri - bore tunnel ( island or side ) and four parallel tunnels ( island or side ) are proposed. secondly, the shape and main parameters of station structure on two schemes are analyzed with load - structure mode, for different overburden depth of tunnel and lining thickness, etc. thirdly, the construction process is simulated in 2d fem.,

    根據建站的規模、使用功能及站位地形地質條件,提出了兩連結構島式站臺車站、三條平行隧道島式站臺車站、三連結構島式和側式站臺車站以及四條平行隧道島式和側式站臺車站方案;採用荷載?結構模式,對四種方案的主體結構的形式和重要參數進行分析研究,分不同的埋深、結構厚度和形結構的跨比進行了多組數值計算;採用平面有限元方法對四種車站結構的開挖施作過程進行了模擬分析。
  10. Technique of backfilling grouting into back of double - arched tunnel lining

    雙連隧道後背回填注漿技術
  11. In this article, according to the execution example on arch ring lining crack defect at some certain single - track railway mountain tunnel, a brief introduction is given to the cause of formation, disposal technique and construction points for attention on this kind of defect

    摘要根據某鐵路山嶺單線隧道裂縫病害整治施工實例,簡單介紹了病害成因、整治技術及施工注意事項。
  12. During the construction of the concrete lining for the diversion tunnel of xiaowan hydropower station, the concrete linings for the sides and the crown of the tunnel are simultaneously placed by the integral steel shuttering trolley with the greatly shortened construction progress

    摘要小灣水電站工程在導流洞混凝土施工中,邊頂混凝土採用整體式鋼模臺車一次成形,大幅提高了施工進度。
  13. Analysis of failure mechanism at crown of tunnel and reinforcement measures

    隧道機理分析及整治
  14. The construction of the multiple - arch tunnel is deeply related to the form of center partition, the tunnel ' s section and excavation method etc. the change regularities of stress field caused by excavation are studied by 4 multiple - arch unlined tunnel model tests. the difference in lining for various multiple - arch sections is analyzed and the mechanics characteristics of center partition is discussed. then, a reasonable construction method for multiple - arch tunnel and a better section are put forward

    通過4個連模型試驗,研究了連毛洞開挖引起的應力場變化規律,對不同的連斷面的受力差異進行了深入的分析,同時對中隔墻的受力特點也作了探討,提出了合理的連隧道構築方法及優化斷面圖。
  15. When there is original stage support only, the load ratio of surrounding rock gets more and more bigger with the increasing of crust stress, correspondingly, the load ratio of initial stage support gets smaller. when the initial stage support and the second support act each other, the load ratio of surrounding rock is more than fifty percent, and it has little change with the increasing of crust stress. the whole analysis of the surrounding rock and support shows that the bottom arch of liner and the feet of liner have serious stress concentration, so do the sidewalls and the foot of a wall of the surrounding rock

    通過屈曲理論分析結果對比表明,彈性屈曲和突變失穩分析的結果比非線性屈曲分析的結果要大得多,非線性分析由於考慮了材料非線性和幾何非線性,因而結果與實際接近實際;當只有初期支護時,隨著地應力的增加,圍巖的荷載分擔率增大,相應地,初期支護的荷載分擔率就減小了;當有初期支護和二次共同作用時,圍巖的荷載分擔率在50以上,這一分擔率隨地應力的增加其變化不大;支護和巖體的整體分析表明,腳處應力集中嚴重,隧道巖體側墻及墻角圍巖的應力集中也較大。
  16. By adopting the calculating analysis method of elastic - plastic three - dimensional fem numeric simulation, this paper makes a simulation analysis on the structure stability of the shallow cover and unsymmetrically loaded parts in tongyoushan tunnel, mainly simulates the effects caused by different construction orders on surroundings and supporting structure stability, and it centers on the analysis on the weak part, the midwall in the lining of the connecting - arch tunnel

    摘要採用彈塑性三維有限元數值模擬計算分析的方法,對桐油山隧道淺埋、偏壓地段結構穩定性進行了模擬分析,主要模擬了不同施工順序對圍巖及支護結構穩定性的影響,重點對連隧道整體中的薄弱環節中墻進行了分析。
  17. Analysis of the interaction between primary support and the secend linning of large span and double arch tunnel

    大跨連隧道初期支護與二次相互作用分析
  18. Consequently, when there are cavities behind of lining, the stability of the invert must be considered especially

    結果得出在背後存在空洞的時候,仰的穩定性是需要特別考慮的。
分享友人