襯砌工藝 的英文怎麼說

中文拼音 [chèngōng]
襯砌工藝 英文
lining process
  • : Ⅰ動詞1 (在裏面托上一層) line; place sth underneath 2 (陪襯; 襯托) set off Ⅱ名詞(襯在裏面的附...
  • : 砌Ⅰ動詞(用磚、石等壘) build by laying bricks or stones Ⅱ名詞(臺階) step
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (技能; 技術) skill 2 (藝術) art 3 [書面語] (準則) norm; standard; criterion4 [書面語...
  1. At the part vault and arch foot in the tunnel secondary lining thickness, the standard difference and variance parameter is large than others, so insure the part thickness achieve design require by adjust construction craftwork

    隧道二次厚度在拱頂和拱腳的部位的標準差和變異系數較大,在施中應該考慮調整施,確保這兩個部位的厚度。
  2. Abstract : this paper introduces the choice and ramming of the refractories for the 12 t induction channel furnace , which is one of the import production facilities for producing “ oxygen free ” copper wire by upward - leading continuous casting. the cost of home - made refractories is only 1 / 5 1 / 8 of that of import one. it is of benefit to all similar import furnaces that the domestic refractiones were successfully rammed and used

    文摘:介紹了引進無氧銅桿上引法生產線中12t有芯感應爐爐耐火材料的選用和;運行狀況良好,整個材料費僅為進口同類材料的1 / 5 1 / 8 ;該熔銅爐爐的成功築和使用,為其他同類爐子爐耐火材料的國產化提供了範例。
  3. In the south - to - north water diversion centre line, beijing west 4th ring road tunnel the waterproof design and operation, they use the construction experience of the urban subway of beijing for reference, adopt the compounding type and line with and build waterproof craft

    南水北調中線北京段西四環暗涵程在防水設計與施中,借鑒了北京城市地鐵的施經驗,採用復合式防水
  4. Finally, construction technology and the mechanical equipment matching, such as formwork of full - circular monolithic lining for single - line railway tunnel, are studied and some suggestions are given

    最後對相配套的施設備- -單線鐵路隧道全環整體模築臺車和施進行了研究,並提出建議。
  5. 4. the platform and the construction technology for full - circular monolithic lining are studied

    對單線鐵路隧道全環整體模築臺車和施進行了研究。
  6. Abstract : the problems existing in 12. 5mva old fesi furnace lining are analysed, the improving measures are expounded in structure, laying process and refractories, and good results are achieved

    文摘:對12 . 5mva硅鐵電爐舊爐存在的問題進行了分析,闡述了新爐的結構、及耐火材料方面的改進措施,取得了較好的使用效果。
  7. In this paper, basing on the data analysis and stimulating analysis of the concrete liner of the water diversion tunnel of the underground hydropower station in the right bank of the tgp, the distribution and influential factors of the thermal - creep stress of thick concrete liners with big diameters in the tgp are studied. the following several problems have been solved : 1

    本文基於三峽程右岸地下電站引水洞混凝土施期監測資料和模擬計算分析,探討了三峽程中大洞徑、厚混凝土在當前施下施期溫度應力的分佈規律及影響因素,全文主要進行了以下幾個方面的作: 1
  8. Application of ceramic tiling by the thin bed method using epoxy resin adhesives

    第3部分:採用環氧樹脂粘合劑的稀灰漿陶瓷
分享友人