規劃許可證 的英文怎麼說

中文拼音 [guīhuàzhèng]
規劃許可證 英文
planning permission
  • : Ⅰ名詞1 (畫圓形的工具) instrument for drawing circles 2 (規則; 成例) rule; regulation 3 [機械...
  • : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
  • : Ⅰ動詞1 (稱贊; 承認優點) praise 2 (答應) promise 3 (允許; 許可) allow; permit 4 (許配)enga...
  • : Ⅰ動詞(證明) prove; verify; demonstrate Ⅱ名詞1 (證據) evidence; proof; testimony; witness 2 (...
  • 規劃 : 1 (比較全面的長遠的發展計劃) planning; programming; project; schematization; programme; plan 2 ...
  • 許可證 : licence; permit
  • 許可 : permit; allow; permission; allowance; consent; licence
  1. The building builds careful material : commodity house beforehand ( annul ) carry out licence or room change written reply to a subordinate body ; build project program licence ; build engineering construction permit ; build licence of the program that use the land ; state - owned land uses card ; propose careful ichnography and floor plan

    房屋建審資料:商品房預(銷)售或房改批復;建設工程規劃許可證;建設工程施工;建設用地規劃許可證;國有土地使用;建審平面圖及樓層平面圖。
  2. Certificate must all ready, land uses card, committee of planning to approve license of article, start working, build licence of the program that use the land, complete card, sell license beforehand

    件必須齊全,土地使用、計委批文、開工,建設用地規劃許可證,竣工,預銷售
  3. Commodity house opens to booking need to have the following requirement : ( one ) open to booking a person to already obtained estate to develop intelligence letter, business charter ; ( 2 ) concern gold of sell one ' s own things of access of formulary consign land according to land management department, already obtained land access letter ; ( 3 ) licence of program of hold construction project and permit of construction project construction, already dealt with construction project quality and safety to control procedures ; ( 4 ) schedule of affirmatory already construction and complete consign use time ; ( 5 ) 7 achieve main body project below to seal a top ; 7 with what go up, the 2 / 3 above number of plies that main body project must build engineering budget to invest amount ; ( 6 ) already opened commodity house to open to booking a special account in project seat commercial bank ; ( 7 ) the other condition that law, code sets

    商品房預售需具備以下條件: (一)預售人已取得房地產開發資質書、營業執照; (二)按照土地治理部門有關定交付土地使用權出讓金,已取得土地使用權書; (三)持有建設工程規劃許可證和建設工程施工,並已辦理建設工程質量和安全監督手續; (四)已確定施工進度和竣工交付使用時間; (五)七層以下的達到主體工程封頂;七層以上的,主體工程須建到工程預算投資總額的三分之二以上層數; (六)已在項目所在地商業銀行開設商品房預售款專用賬戶; (七)法律、法定的其他條件。
  4. Basis " urban commodity house opens to booking administrative measure " ( 2004 edit ) regulation, commodity house opens to booking ought to accord with the following condition : 1, already pay is full gold of land access sell one ' s own things, obtain land access letter ; 2, licence of program of hold construction project and construction permit ; 3, by offer the commodity house calculation that open to booking, the capital that devoted development builds achieves the 25 % above that project always invests, had fixed construction schedule and complete due date

    根據《城市商品房預售治理辦法》 ( 2004修訂)的定,商品房預售應當符合以下條件: 1 、已交付全部土地使用權出讓金,並取得土地使用權書; 2 、持有建設工程規劃許可證和施工; 3 、按提供預售的商品房計算,投入開發建設的資金達到工程建設總投資的25 %以上,並已經確定了施工進度和竣工交付日期。
  5. On the basis of other researchers experience, author put forward some new views : give the ecological industry park an overall planning, strengthen the government important functions ( including change mechanism, improve the legal system, establish the special developing foundation for the ecological industry park ; implement the pollution charge license exchanging system ), strengthen the construction of environmental protection department, self - management of the ecological industry park and consolidate environmental protection propaganda and training

    在借鑒其他學者研究成果的同時,主要提出了幾個新的觀點:一、統籌生態工業園區;二、強化政府部門的重要作用(包括轉換機制、完善法制、設立生態工業園區的發展專項基金、實行排污交易制度)三、加強環保部門建設;四、生態工業園區自治自律;五、強化宣傳教育。
  6. Releasing authority referred to in the present rules are the qlab, a resident office in any locality of the ministry of commerce, or the department ( bureau ) of commerce or foreign trade and economic cooperation commission ( department or bureau ) of a province, autonomous region, municipality directly under the state council, cities specially designated in the state plan or capital city

    范所稱發機構是指局及商務部駐各地特派員辦事處和各省、自治區、直轄市、計單列市以及其他省會城市商務廳(局) 、外經貿委(廳、局) 。
  7. For all clp members in the united states and canada, for education members in europe, and for commercial members worldwide, the clp now offers the high - volume discount, which provides even higher discount levels if you order specified minimum units of a qualifying product license or upgrade plan

    針對美國和加拿大的所有clp會員歐洲的教育類會員以及全球的商業類會員, clp現在提供大批量折扣,如果您訂購的符合條件的產品或升級計數量達到定的最低數量,還會獲得更高的折扣級別。
  8. Chapter one begin with a problem that city planners would encounter when compiling the master planning of city, analysis the phenomenon of lack relations between the development and planning, adopt the data of " permit of development ", then present the concept of " unit block analysis ", and bring out the " real - time tracking " to the city development, and then, demonstrate the feasibility of this approach. the second chapter reviewed a summary of related researches and practices in this field domestic and abroad and then, there follow the history of evolution of the city structural layout in hangzhou.

    第一章為緒論部分,從當前做設計時碰到的一個問題切入,對現在杭州城市用地發展存在的和實施兩個范疇相互之間缺乏反饋機制這個現象進行分析,採用了2000 - 2003年建設用地規劃許可證的研究數據,提出對城市建設用地的發展進行區塊單元分析的模型和研究方法,從理論和實踐兩方面論這種方案的行性和將會給城市提供參考依據的意義。
  9. If you order a qualifying number of units of select new software licenses, software upgrades, or the upgrade plan, you qualify for even higher discounts from your adobe license center

    如果您訂購的新軟體軟體升級或升級計數量達到定的單位數量,您就有資格從adobe中心獲得更高折扣。
  10. The urban planning sector is the executive body to exercise judicial procedure of examining and approving land use prescribed in “ one proposal, two licenses ” ( proposal for site - choosing, license for construction planning, license for project construction planning ). the work of examination and approval is largely based on the maps provided by the city surveying & mapping team

    城市管理部門對城市建設單位具有用地審批權,行使城市管理中的「一書兩」 (建設項目選址意見書、建設用地規劃許可證,建設工程規劃許可證)的審批管理職能,管理部門的日常業務工作正是圍繞著這一審批管理職能展開的。
  11. There is no messing about with radio - spectrum licences or digging up roads, and fso can also bypass prohibitive planning restrictions

    另外,也用不著折騰申請無線電頻道或者把道路挖開埋光纜,同時,無線光通信也能夠繞過禁止性的限制。
  12. The successful proponent is required to comply with all the statutory requirements under the eiao during the planning, design, construction and operation stages by completing eia studies for the project, and obtaining environmental permit ( s ) for any schedule 2 designated project ( s ) prior to their construction and eventual operation. proponents should take this into account in their programme

    在施工及日後進行營運前,中選的建議者必須在、設計、建築和營運階段,完成該工程項目所需的各項環境影響評估研究,以及就附表2指定工程項目取得環境,以符合《環境影響評估條例》的所有法例定。
  13. " 5 card one book " namely : book of opinion of construction project optional location, construction uses house of licence of licence of program of project of card, construction, engineering go into operation, commodity to open to booking licence with ground program licence, land

    「五一書」即:建設項目選址意見書、建設用地規劃許可證、土地使用、建設工程規劃許可證、工程開工、商品房預售
  14. An investor shall submit the guarantee letters for performance of the contract on the transfer of state - owned land use right, the license for the planning of construction land and the license for the planning of construction projects and the use certificate of state - owned land, certification on the alteration of archival files in the administrative department of construction ( real estate ) as well as the relevant certification materials of tax return as produced by the taxation authority

    投資者應提交履行( 《國有土地使用權出讓合同》 、 《建設用地規劃許可證》 、 《建設工程規劃許可證》等的保函, 《國有土地使用》 ,建設(房地產)主管部門的變更備案明,以及稅務機關出具的相關納稅明材料。
  15. The word " work " means the engineering, design ( including, but not limited to, primary design, extended preliminary design and preparation of detailed design and construction drawings ), construction ( including, but not limited to, early work, site setting out, earth back filling works, sub - structure works, civil works, above - ground works, installation and testing ) and construction management services to be performed by the development manager and subcontractors pursuant to the provisions of this contract and a written authorization, and as modified from time to time in accordance with the provisions of this contract, and includes all designs, drawings, plans, means, methods, techniques, sequences and procedures and, unless expressed to the contrary in this contract, all materials, tools, utilities, labor, equipment services, licenses, permits, tests, warranties, guarantees, transportation and other items and facilities of every kind necessary for the complete performance of this contract

    「工程」一詞應指由開發管理人和分包商根據本合同的定和書面授權書執行的工程、設計(包括但不限於初步設計、擴初設計以及深化設計圖和施工圖的準備) 、施工(包括但不限於前期工作、現場布局、回填土工程、次結構工程、市政工程、地上工程、安裝和測試)及施工管理服務,該等服務根據本合同的定被不時修訂,並包括所有的設計、圖紙、計、手段、方法、技術、工序和程序以及,除非合同中有相反定,所有的材料工具、設施、工人、設備服務、執照、、測試、保、擔保、交通以及其他為圓滿執行本合同所需要的各種物品和設施。
  16. 3 the permit holder shall deposit with the director 3 sets of 1 to 1000 scale layout drawings showing the works boundaries, drainage channel, ancillary road alignments and any other facilities assessed in the eia report ; the locations of environmental mitigation measures recommended in the eia report ; and an explanatory statement

    持有人須向署長存放下列文件,計有: 3套1 : 1000比例的設計圖則,顯示工程界線、排水道、附屬道路的路線及環評報告所評估的任何其他設施;環評報告所建議的環境緩解措施的地點;以及一份解釋說明。
  17. Planning permit of construction engineering

    建設工程規劃許可證
  18. The unit or individual undertaking construction may not apply for the performance of the procedure for the beginning of construction until after acquiring the permit for a planned construction project

    建設單位或者個人在取得建設工程規劃許可證件和其他有關批準文件后,方申請辦理開工手續。
  19. This project welcome customer participates in the cooperation development, the project land funds has already been paid in full. the developer is now holding government approvals construction to use to plan permit,

    本項目歡迎客戶參與合作開發,項目土地款已付清,開發商手中已有兩建設用地規劃許可證土地
  20. 3 the planning permit for construction - land - use for no. 4 lot of xixi project has been successfully obtained, being numbered as ( 93 ) shiguidizhi no. 4 ( see appendix b - - copy of planning permit for construction - land - use for details )

    3工程項目4 #地現已取得《建設用地規劃許可證》 ,編號為: ( 93 )市地字4號(詳見附件二《建設用地規劃許可證》復印件) 。
分享友人