規準拱 的英文怎麼說

中文拼音 [guīzhǔngǒng]
規準拱 英文
gauged arch
  • : Ⅰ名詞1 (畫圓形的工具) instrument for drawing circles 2 (規則; 成例) rule; regulation 3 [機械...
  • : Ⅰ名詞1 (標準) standard; guideline; criterion; norm 2 (目標) aim; target Ⅱ動詞1 (依據; 依照)...
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  1. Standard practice for structural design of corrugated aluminum pipe, pipe - arches, and arches for culverts, storm sewers, and other buried conduits

    涵洞排水和其它地下管道用波紋鋁管管結構設計的標實施
  2. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河口水電站工程實際資料,對m方案和n方案溫度場進行了施工期和運行期全過程模擬計算分析,給出了冠梁剖面和壩體中心縱剖面穩定溫度場等值線圖以及施工期、運行期冠梁剖面和壩體中心縱剖面非穩定溫度場等值線圖,提供了施工期逐月和運行期每年最高、最低溫度等成果,分析了壩體溫度分佈律以及高溫區形成的原因,並探討了預埋冷卻水管的效果和可行性以及預埋冷卻水管的區域。
  3. Standard specification for corrugated aluminum alloy structural plate for field - bolted pipe, pipe - arches, and arches

    現場栓接管管用波紋鋁合金結構板的標
  4. Standard specification for corrugated steel structural plate, zinc - coated, for field - bolted pipe, pipe - arches, and arches

    現場栓接管管用鍍鋅波紋鋼結構板材的標
  5. Standard practice for structural design of corrugated steel pipe, pipe - arches, and arches for storm and sanitary sewers and other buried applications

    雨水衛生污水和其它地下設施用波紋鋼管管的結構設計標實施
  6. Standard specification for intrusion resistant generic vault structures

    一般形結構的抗侵入性的標
  7. This thesis details the detention for dukou bridge in pan - zhi - hua city. du kou bridge is an steel arch bridge with history of 35 years, and plays an important role in the city. because the bridge detention is taken under no current specification and standard to be and the disease is very complicated, the detection work is very difficult

    本論文以攀枝花市渡口大橋為對象進行舊橋的檢測評定研究。渡口大橋為180米的鋼箱肋橋,是攀枝花的一座重要橋梁,投入使用已超過35年。本次評定檢測工作,是在沒有現行范、標和橋梁病害狀況又相當復雜的情況下進行的。
  8. Standard specification for reinforced concrete arch culvert, storm drain, and sewer pipe

    鋼筋混凝土製形排水管雨水管和污水管的標
  9. Standard specification for reinforced concrete arch culvert, storm drain, and sewer pipe metric

    鋼筋混凝土製形排水管雨水管和污水管的標
分享友人