設計物料清單 的英文怎麼說

中文拼音 [shèliàoqīngdān]
設計物料清單 英文
engineering bom
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 名詞1 (東西) thing; matter; object 2 (指自己以外的人或與己相對的環境) other people; the outsi...
  • : 名詞1 (材料; 原料) material; stuff 2 (喂牲口用的穀物) feed; fodder 3 (料器) glassware 4 (...
  • : Ⅰ形容詞1 (純凈) unmixed; clear 2 (寂靜) quiet 3 (清楚) distinct; clarified 4 (一點不留) w...
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  • 物料 : item,material,part
  • 清單 : inventory; repertoire; detailed list; detailed account
  1. The budget should include artist s fee, material costs, support, fabrication, production and installation, insurance, transportation, provision of documentation, operation and maintenance manual of the sculpture, clean up, light fittings, connection to signal cable outlet, a training session provided for the organiser on the maintenance procedures of the sculpture within 2 months after the installation, maintenance of sculpture for 12 months after the installation and any other expenses incidental to the implementation of the proposed sculpture

    此費用須包括創作及費支架製作安裝保險運輸提供有關的記錄文件和雕塑的操作及維修手冊潔照明系統裝置訊號線路連接雕塑安裝后十二個月內的維修在雕塑安裝后兩個月內為主辦位提供一次有關雕塑維修程序的講解等,及所有可能涉及置雕塑的費用。
  2. The budget for the commission must include all costs including artist s fee, material costs, support and fabrication, production and installation, stand finish, lighting system, insurance, transportation, provision of documentation, operation and maintenance manual of the sculpture, clean up, light fittings, connection to signal cable outlet, a training session provided for the organiser on the maintenance procedures of the sculpture within 2 months after the installation, maintenance of the sculpture for 12 months after the installation and any other expenses related with the sculpture

    委約費用預算包括費、成本、支架及裝置、製作及安裝、支架修飾、燈光系統、保險、運送、記錄文件、雕塑的操作及維修手冊、潔、照明系統裝置、訊號線路連接、在雕塑安裝后兩個月內為主辦位提供一次有關雕塑維修程序的講解、雕塑安裝后十二個月內的維修及所有其他與雕塑品有關的支出。
  3. At last, according to the characteristic of report generator in tribon, we established the product structure managing system, studied the algorithm for the generation of the product structure tree and generated the visual product structure tree, and have an eye on the management of bom, taking accout of the correctness of the information of bom, we adopted the method of from top to bottom or from bottom to top to provide information ; and designed 6 bom to accomplish the function

    最後,根據tribon系統中報表生成器的特點,建立了產品結構管理系統,研究了產品結構樹生成的演算法,生成了可視化產品結構樹。並對產品bom的管理進行了研究,考慮到bom信息的準確性,採用了bom以自頂向下分解的形式或是以自底向上跟蹤的形式提供信息;並bom的六種形式來實現其功能。
分享友人