設計過程 的英文怎麼說

中文拼音 [shèguòchéng]
設計過程 英文
layout procedure
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  • 過程 : process; procedure; transversion; plication; course
  1. The best optimum mathematical model is constituted. scalar factor of structural parameter on loop rectangular negative pressure and adsorption slide is calculated. structural parameter, air gas source pressure carrying capacity and thickness of air cell are made sure by hydrodynamics and the theory of gas lubrication

    詳細論述了導軌副的設計過程,運用數學上的拉格朗日條件極值求解法,建立最優化數學模型,求出環矩形負壓吸附導軌的結構參數的比例情況,並運用流體力學和氣體潤滑理論確定了環矩形負壓吸附導軌的結構參數、氣源氣壓、承載能力和氣膜厚度的確定性結論。
  2. Meanwhile, the author analyses in - depth auditorial modes and problems nowadays through macroscopical, microcosmic, system, main body, object, auditorial target, evaluation standard and auditorial criterion of the financial responsibility. however, author also reconstructs the aim frame of auditorial system during the leader ' s tenure of office in china through considering its relationship, main body, process and goal

    從宏觀、微觀、制度定位、主客體、審目標、衡量標準、審判據等方面深入分析了現有經濟責任審模式及存在的問題,從關系、主體、目標分層等方面考慮,重構了我國經濟責任審制度目標框架。
  3. Besides used as a tool for assisting in locating geometric elements during sketching stage, constrains is also a useful tool for convey design intents and knowledge during conceptional design stage

    約束已經成為支持整個設計過程不可缺少的部分,它摘要浙江大學博士學位論文不僅在詳細階段用來表示幾何元素聯系和定位的信息,而且在概念階段是者表達意圖和知識的工具。
  4. The concurrent design based on data warehouse

    以產品數據倉庫為核心的并行設計過程
  5. In the design process of the project, firstly the principle scheme is figured out with the theory of " black box ". constringency is done after the sub - functional solutions are acquired

    在本機原理方案的設計過程中,首先採用「黑箱」理論對原理方案進行發散求解,在得出分功能解后再進行「收斂」 。
  6. Fourthly, according with the analyzing of flow measurement, we research the main problems needed to be solve in the process of measurement, such as analysis and measurement of the internal resistance, selection of excitation frequency, stable signal datum mark and restraining common mode interference, restraining for serial mode interference and working frequency interference ; transporting and shielding the flow signal, constant current excitation and magnetic field equalizing, flow measuring

    第四,根據對流量測量問題分析的,深入研究了設計過程中需要解決的主要問題。如內阻分析與測量;勵磁頻率的選擇;穩定信號基準點與抑制共模干擾;串模干擾與工頻干擾抑制;流量信號傳輸與屏蔽;恆流勵磁與磁場補償;流量測量點的選擇等。
  7. And bulk of non - diagrammatic data is necessity in designing process for producing this table

    本方法採用access來存儲設計過程中的非圖形數據,並根據該數據庫生成主要備和材料用量報表。
  8. In chapter two, omt ( object - oriented modeling technology ) and dpm ( data platform method ) that used design and development of erp are presented. because of its weightiness, the process of implementation of erp is given in detail. the design and development of erp system for paper mill is expounded, as well as the module and the specialty of the erp system

    第二章:首先重點介紹了系統開發和設計過程中所採用的面向對象法和數據平臺法,並重點闡述了erp實施的,隨后給出青山紙業erp項目的實例背景,結合上述系統開發實施方法,詳細介紹造紙行業erp系統設計過程、各功能模塊及系統特點。
  9. In the process of arithmetic design, newton " method is used to compute power flow of network. graph theory knowledge is used to determine all paths from generator to load. to improve efficiency, thesis use branch expunction method to optimize the node order

    在演算法設計過程中,採用牛頓拉夫遜法進行潮流算得到系統潮流分佈,利用圖論原理中的路徑搜索演算法確定了發電機對負荷的供電路徑,此外為了提高潮流跟蹤的算效率,利用了支路消去法進行節點順序的優化。
  10. This article introduces briefly the process of design and characteristic of structure of db930 tube and discusses the main problems of technology and technique which was met during the manufacture and the measures having been adopted are emphatically. it discusses the solve measures in following six aspects : the filament current is too large, carbon deposits during the carbonizing of cathode, the capacitance between the first grid and the second grid is too large, transpiring happens inside the tube, the insulation resistance between the electrodes is too lower when the filament is on and the ability of bearing high voltage is too lower

    本文簡略地介紹了db930的設計過程及其結構特點,重點論述了在試制中遇到的主要工藝技術問題及解決問題的措施,圍繞解決燈絲電流大、陰極碳化時積碳、一柵和二柵之間的電容大、管內蒸散、熱態時極間絕緣低、耐高壓的能力差等六個方面的問題進行了論述。
  11. Through the introduction of the green house paradigmatic project designed by the cooperation of china and germany in flagstone town, hua xi district, gui yang, this article expatiates systemically the whale design process from the view of comprehensive assessment system tar building environmental efficiency and explores the application of the green building techniques in rural house construction

    該文通介紹中德合作的貴陽市花溪區石板鎮鎮山新村綠色住宅示範工,從建築物綜合環境性能評價的角度系統闡述整個設計過程,探索綠色建築技術在村鎮住宅建中的應用。
  12. City public the key problem that space face is design that growth method that development, wether is traditional or modern, all need to be existed in vigorous city replace, as if organism, since keep hypostatic spirit, need again the right alone metabolism ego renews, can keep on much more than only be used as a kind of concrete item reply the means, also is a kind of sport mode that have the timespace effect, passing to establish to study the - practice the investigative and circulating mode in - in -, realizing to design the process oneself of of keep on developping. in this process " practice " is a processor to changes spatial motive force, research is receive and dispatch the information

    城市公共空間面臨的主要問題是發展,無論是傳統的還是現代的,都需要在激烈的城市變革之中生存,如同有機體的生長方式,既要保持本質的精神,又需要不斷的新陳代謝自我更新,可持續的不只是作為一種具體項目的應對手段,同時也是一種具有時空效應的運動模式,通建立研究? ?實踐? ?研究的循環模式,實現設計過程自身的持續發展。在這一中「實踐」是改變空間的西安建築科技大學碩士學位論文原動力,研究是收發信息的處理器。
  13. In the progress of formulate the module, many advanced technologies and methods, such as nat and vpn, are adopted. the impletion of module covers three kinds firewall module. this paper has special value on the research above electronic business security framework

    設計過程中,運用了nat 、 vpn等先進的技術和方法,採用常用的三種防火墻模式(軟體防火墻、硬體防火墻和軟硬體相結合的方式) ,對模型中的主要模塊具體實現,最終建立一個結構合理、功能完善、經濟適用的防火墻系統。
  14. In the collaborate designing of the complex products, the designers always meet with the incertitude multi design projects, and require multi - fields specialists to evaluate integrally

    摘要在復雜產品的協同設計過程中,常常會遇到難于確定的多個方案,需要多領域專家集體評價。
  15. The theories and design principles of each circuit of the spwm three - phase frequency inverter experiment unit are in detail introduced in this thesis. at the same time some experiment results are shown that include the output voltage and current waves when the load is in resistivity, inductivity or asynchronous motor

    文中詳細介紹了spwm三相變頻實驗單元所包含的各電路環節的理論基礎及設計過程,並給出了調試結果,如負載為阻性、感性和異步電動機時,實驗單元輸出的電壓和電流波形。
  16. During a practical project folk - custom square of enshi, the author analyzes the difficulty of connection between traditional building and modern architecture and discusses the method that could introject the national symbol and modern city, proceeding with traditional building and village and combining the reality in order to embody national characteristic, accelerate the development of modern city and suffice the request of modernization

    摘要該文論述了恩施清江風情園實際項目的設計過程中,從地區傳統民居與聚落入手,結合當地的實際情況,深入分析在現階段中小城市發展中,傳統建築與現代城市結合的難點,探討在現階段地區傳統標志性建築與現代城市的整合方式,以期達到即能體現地區特色又能促進城市發展,滿足城市現代化進的要求。
  17. The oo design process : use cases applied, part 1

    Oo設計過程:應用的用例,第1部分
  18. Read last month s oo design process column,

    參閱上個月的「 oo設計過程」專欄,
  19. The oo design process : use cases applied, part 2

    Oo設計過程:應用的用例,第2部分
  20. Then, idef3 and object - oriented petri net ( opn ) model for product development process is constructed respectively. the whole process is realized on smarteam platform

    採用由idef3到opn網建立產品開發流模型,在smarteam平臺上實現了產品設計過程管理。
分享友人