試驗段 的英文怎麼說

中文拼音 [shìyànduàn]
試驗段 英文
experiment chamber
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  • 試驗 : trial; experiment; test
  1. As the air proceeds along the test section the boundary layer thickens.

    當空氣沿著試驗段流動時附面層逐漸變厚。
  2. In allusion to test roadway in the zhang - luo second class highway and lin - chang freeway, through hydrologic analysis, hydraulic calculation and with the analysis of highway structure, the blue print of setting drainage system, construction technique and back - check experiment are presented

    針對張羅二級公路試驗段和臨常一級公路試驗段,進行了水文分析和水力計算,並結合路面結構分析,提出了排水系統的布設方案、施工技術方案和檢測方案。
  3. Analyzing the failure characteristics of steel deck plate paving and the actual use of the testing section which uses epoxy asphalt at jiangyin yangtze river bridge, this paper decides to use epoxy asphalt concrete as the repairing material to prevent pavement from deteriorating

    摘要在分析江陰大橋鋼橋面鋪裝破壞特徵的基礎上,結合環氧瀝青混凝土試驗段的實際使用狀況,故決定採用環氧瀝青混凝土對鋪裝層進行預防性維修以避免其繼續惡化。
  4. Two sample parallelepipeds are located in the test section.

    試驗段中裝有兩個平行六面體件。
  5. Reinforcement effect of soil bank foundation of testing xige bank of huangmei hubei

    湖北省黃梅縣西隔堤試驗段土堤基加固效果檢
  6. Unlike in subsonic and transonic speed regimes, the interference resulting from the finite size of the test region is seldom present.

    不像在亞、跨音速區域,這里因試驗段尺寸有限造成的干擾是難得存在的。
  7. Trial test of steel panel of noise barrier nb8 in progress

    已完成的高架橋隔音屏試驗段的鋼架
  8. The soil - rock foundation was applied in highway of changde - zhangjiajie, and in order to assure soil - rock foundation quality by shocking and compaction test, different virtual height of soil - rock foundation was constructed and it ' s quality was controlled for in - situ test, it was considered as parameter for virtual height, shocking and compaction quantities, shocking and compaction sediment rate and maximum diameter of packing materials

    摘要針對常張高速公路採用沖擊壓實技術壓實土石混填路基的問題,選取試驗段進行了不同虛鋪厚度路基的施工工藝及質量控制等研究,提出了虛鋪厚度、沖壓遍數、沖壓沉降率(單級沉降量) 、填料最大粒徑等施工控制參數。
  9. Based on the investigation and study of impact compaction technology in civil and abroad, this paper discusses the impact compaction working sections that include xining ~ huangyuan, machangyuan ~ pingan, xining ~ taersi and pingan ~ adai expressways. through contrast analysis and generalization of the working sections " test data and aggregate analysis of expressways " test result, this paper studies construction process, construction effect test method and efficiency of loess subgrade construction applied by impact compaction technology in qinghai province

    本課題在對國內外有關沖擊壓實技術調研的基礎上,依託西湟公路、馬平公路、西塔公路及平阿公路試驗段開展沖擊壓實研究,對各個試驗段結果進行分析、綜合和總結,研究了沖擊壓實技術在青海黃土路基施工中的施工工藝、施工效果、檢測方法及效益等問題。
  10. Based on the construction of the testing section for the lining of jiping main canal in shandong province of south - to - north water transfer project, the main causes of the cracking from the mechanized lining concrete slabs are analyzed from the aspects of foundation treatment, bedding layer placement, quality of the raw materials for the concrete, placement of the concrete, cutting of the hardened concrete and the curing of the concrete, and then the relevant prevention and control measures are pertinently put forward

    摘要結合山東省南水北調濟平乾渠工程襯砌試驗段施工情況,著重從地基處理、墊層料鋪設、混凝土原材料質量、混凝土澆築、成型混凝土割縫及養護幾個方面分析了機械化襯砌混凝土板裂縫產生的主要原因,並針對性地提出了預防及控制措施。
  11. For the foundation treatment of the experimental segment of the south shore expressway of the hangzhou bay cross sea bridge, the in situ monitoring has been conducted for more than two years by use of vacuum - surcharge preloading

    摘要結合杭州灣跨海大橋南岸接線高速公路試驗段工程,對真空堆載聯合預壓技術處理的斷面進行了長達兩年多的現場測
  12. The curves of the consolidation settlement in soft clay base of flood land are gained, which compare the effect of sand drain. the settlement - time curves in different period are also gained, which increase the height of embankment to 8m, based on the test data of hang - yong highway. furthermore, the consolidation settlement characters of these entity engineering are analyzed, and, the variation rules of the rate of grade and degree of the curves in different period in the whole section, the maximal settlement and the liner regression relations between the rate of grade and degree are calculated

    本文利用大變形固結有限元分析程序( lscfea )中的小變形平面固結分析單元( sse2 ) ,結合實體工程項目進行了地基固結沉降的有限元計算,分別得出河灘相軟土地基在考慮砂井和未考慮砂井作用下的固結沉降曲線及杭甬高速公路試驗段在高堆載情況下的固結沉降曲線;並對以上曲線特徵進行了分析,得出各時間曲線斜率、角度在整個斷面的變化規律,以及沉降最大值與斜率、角度變化之間的線性回歸關系。
  13. First, the field test of soft ground at the jialichen bridge - head on the highway from luqiao to zeguo was performed and the observation results of test site were analyzed

    首先,對路橋至澤國一級公路浹里陳大橋橋頭軟基進行現場研究,對試驗段的各項監測與成果進行了分析。
  14. The calibration of a closed throat will not suffice if the walls are removed to make an open throat.

    如拆走洞壁形成一個開口試驗段,則閉口試驗段用的校測結果就不夠充分了。
  15. Gusts can cause variations in the test section dynamic pressure, and in the distribution of dynamic pressure across the test section.

    陣風會使試驗段動壓和試驗段截面動壓分佈發生變化。
  16. For the velocity survey the pitot-static tube is moved around the jet, and the dynamic pressure is measured at numerous stations.

    為了測量速度,可把皮托靜壓管放在試驗段內各個地方並測量多點上的動壓。
  17. The experiment follows out leading thought on cutting and siutting freeze of fundation and enforcing inflexibility of concrete slate, choose han canal as typical experiment segment, collect freeze index of various canal lining framework, refer the advaced method at home and abroad, adapt new material to make experiment design

    本次以「削減、適應基土凍脹和增強混凝土板剛度」為主導思想,通過大量灌區現狀調查,選取具有代表性的漢渠做為試驗段
  18. Content of asphalt, aggregate gradation, marshall stability, ratio of bitumen to aggregate and spalling adhesiveness are expatiated in terms of the stability of modified asphalt mixture at high temperature for ji - mu highway measured on the spot, and the rutting damage and control measures are also analysed

    摘要根據雞牡公路工程實踐,通過現場試驗段割條測改性瀝青混合料高溫穩定性,闡述了瀝青含量、礦料級配、馬歇爾穩定度、油石比、礦料粘附性等,對車轍產生的危害,以及控制措施。
  19. In connection with impact compaction technology of soil & stone cushion of third airstrip of pudong airport, it selects such experiment research as constructive technology & quality control, puts forward such constructive control parameters as pressing subsidence ratio ( single subsidence ratio ), pressing times, pseudo thickness and so on

    摘要基於浦東機場三期跑道山皮石墊層採用沖擊壓實技術進行壓實的問題,選取試驗段進行了施工工藝及質量控制等研究,提出了沖壓沉降率(分計沉降量) 、沖壓遍數、虛鋪厚度等施工控制參數。
  20. There are several important issues to that attention should be paid in the design of test bed, such as the measurement of the temperature difference between the inlet and outlet of test section and the temperature of cooling water in the inlet and outlet of condensing tubes, filled volume of the steam boiler and its level control, the determination of the natural acting head of high temperature tank and design of the cooling water flow of measuring tank

    臺由高溫工質自然循環子系統、冷卻水機械循環子系統和計算機監測控制子系統構成,試驗段進出口溫差及冷凝管進出口溫度的測、蒸汽鍋爐充注量及液位控制、高溫水箱自然作用水頭的設計、冷卻水流量計量水箱的設計等是臺設計中值得重視的問題。
分享友人