試驗水槽 的英文怎麼說

中文拼音 [shìyànshuǐcáo]
試驗水槽 英文
experimental tank
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞1 (盛牲口飼料或飲料等液體的器具) trough; manger (for water animal feed wine vat) 2 (兩邊...
  • 試驗 : trial; experiment; test
  • 水槽 : water channel; trough; pentrough; mantle; water slide (運木材用); cistern; scoop channel; gulle...
  1. The results of soil trough experiment indicated that, the flow velocity and froude number would add when the rainfall splash intensity rose ; the flow depth and resistance coefficient would decrease when the rainfall splash intensity increased

    結果表明:土壤坡面薄層流流速和弗汝德數隨雨滴打擊強度的增加而增加,深、阻力系數隨雨滴打擊強度的增加而降低。
  2. Through the study above, a refined description and modeling to flow field and water surface near the groyne in river is conducted with 2 - d and 3 - d mathematical models. the results by simulation are consistent well with experiment data

    通過上述研究,作者採用二維和三維數學模型對和天然河道中丁壩附近流場和面形態進行了精細地描述和模擬,計算結果和實測結果吻合良好。
  3. Concrete kerb units - requirements and test methods - national addition to nf en 1340 : concrete industrial products - kerbstones and gutters - profiles

    混凝土路邊石.要求和方法. nf en 1340的國家補充件:混凝土工業產品.路邊石和.型材
  4. The water intake and outlet of power plant in tidal river bend is researched by model test with adopting w shaped rippled groove which meets the request of model roughness

    摘要進行了潮汐彎道段電廠取排模型,採用w形波紋凹方式加糙,使模型糙率達到了模型的要求。
  5. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河庫供工程取頭部由引、節制閘、進閘、泄閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內流流態是否滿足要求,需要經過模型進行論證,以確保工程的可靠性。旁通管具有上與泄要求,對其過流能力也要經確定,為碧流河庫增建旁通管設計提供依據。
  6. The incident wave height h1 / 3 is in the range from 0. 1m to 0. 25m, and the peak period tp in the range from 1. 0s to 2. 0s. the ratio of s / h1 / 3, which refers to the subface level of wharf deck ( s ) to the incident wave height ( h1 / 3 ), is between - 0. 1 and 0. 7. three different shore connecting types : open - piled, permeable slope with armored 1ayer of dolosse b locks and impermeable slope with armored layer of concrete plate, are set in the experiment for the research on the effects of boundary condition with different shore connecting types on the wave impact

    本文的物理模型在大連理工大學海岸和近海工程國家重點實室的大波流中進行,中選用的隨機波靶譜為改進的jonswap譜,入射波波高h _ ( 1 / 3 )范圍為0 . 1m 0 . 25m ,譜峰周期t _ p范圍為1 . 0s 2 . 0s ,碼頭面板的相對凈空(碼頭面板底面距離靜面的距離s與入射波波高h _ ( 1 / 3 )的比值)范圍為- 0 . 1 0 . 7 ,其中s / h _ ( 1 / 3 )為負值時表示碼頭面板底面位於靜面以下。
  7. The dissertation is mainly including four section : the first is the experiments done in the tank, which will supply the reliable information of imaging data ; the second is image edge detection by the use of the art of the zernkie moments, which is used to detect the liner and threaded edge of the object, the third is the underwater camera calibration technique, the forth is automatic positioning the location of the camera by used of the art of cross - ratio, the result of which is satisfied

    本文工作分為四個部分:第一部分是部分,它為后續的工作提供了可靠的圖像數據信息;第二部分是基於zom距的直線、曲線邊緣提取技術及相關的與處理技術;第三部分,下攝像機標定技術研究,基於改進的tsai演算法,採用逐步分解的標定策略。並探討了一種相對簡單的、靈活的標定技術;第四部分是攝像機定位技術研究,採用具有平移不變性的交比進行攝像機定位,模擬的最大誤差不超過2 ,效果還是令人滿意的。
  8. Soak specimen in warm after a specified time then observe whether specimen surface had degenerative conditions as blister, fadeaway, swell. … etc. to judge its quality and calculate the change rate of weight before / after test

    恆溫:材料經本一定時間之溫浸漬后,觀察是否變質,表面有無起泡、褪色、膨脹等現象,以判暄品質,亦可計算前後之重量變化率。
  9. ( 3 ) hydraulic resistance coefficient formulas are derived according to a great number of flume experiments and relative theory analysis

    ( 3 )通過系列和相關理論分析,提出了十字片梅花加糙的有效深和力阻力系數計算公式。
  10. Based on the extended shallow water equations, numerical model is established. verifications and comparison are done to verify its validity by the flume experiment with submerged dike

    據此應用dsi法建立了相應的計算模式,利用進行證,並將該模式的計算結果與淺方程的結果進行比較。
  11. Only the method for using backwater expression can predict the variation of water surface near the spur dike very well. numerical simulations of the flume experiment cases are carried out with the standard k - e turbulence model

    隨后採用標準k一e紊流數學模型,依據資料,數值模擬了繞壩和漫壩兩種情況下流的流動過程。
  12. The results of flume experiment indicated that, the flow velocity and froude number of the overland flow would fall with the rainfall splash intensity rose ; the flow depth and resistance coefficient would enhance with the rainfall splash intensity increased

    結果表明:面薄層流流速及弗汝德數隨雨滴打擊強度的增加而降低,深、阻力系數隨雨滴打擊強度的增加而增加。
  13. By means of the study the main results are listed as follows : ( 1 ) the results of flume experiment and simulated rainfall experiment with a fixed intensity indicated that, the influencing degree of rainfall on overland flow velocity had something to do with the runoff discharge above and rainfall intensity

    通過研究取得了如下結論: ( 1 )和定雨強模擬降雨結果表明,降雨對坡面薄層流流速的作用與放流量和雨強大小有關。
  14. However, according to ann ' s theory, making use of visual basic development tool, friendly - interface single output three layers " artificial neural network generator base on improved bp algorithm has been developed by the author, and after constructing the model, the value of d _ ( cmax ), finally the gross bed - load transport rate of non - uniform sediment with a wide distribution in flume experiment of stead sediment transportation have been forecasted

    筆者採用的途徑則是根據人工神經網路理論,利用vb開發出界面友好、基於改進bp演算法的多輸入單輸出三層神經網路生成器軟體,並採用該生成器建模,對平衡輸沙狀態下的輸沙的d _ ( cmax )和總輸沙率進行預測計算。
  15. In this paper, they different type of individual stake shrimp spread net model ' s experiment results in water trough are checked and analysed by the authors

    摘要本文報道了不同型的毛蝦單樁張網網模結果,並作了分析比較。
  16. The outline tests on the alignment of spur dikes in the flume with repeated tidal flow were carried out based on the alignment of the regulation structures in the north trough of the deep waterway in the yangtze estuary

    摘要結合長江口深航道治理二期工程北中整治建築物的布置形式,在潮汐往復流中進行了丁壩群不同布置形式的概化
  17. Finished the following important consulting projects in recent years : ( 1 ) to take charge of and participate in the design of the project of 25 thousand - ton petrol and gas quays of the jiangyin petrol company. ( 2 ) to take charge of and parricipate in the design of the project of 25 thousand - ton petrol and gas quays of zhang jia gang hada company. ( 3 ) to organize the feasibility study on the coastal engineering test hall construction project of nhri. to take charge of and participate in the design of the hall ( a large - size wave basin, 70m long and 50m wide. was constructed in it ). ( 4 ) to organize the project feasibility study of the laboratory of nhri for the basic law research on sediment transport, to take charge of the design of the project, and to participate in the design of the wind and wave flume ( 180m long ), in which the scientific research projects of waterway training works and coastal engineering structures can be carried out under the combined action of wind, wave and current

    近幾年來主要完成以下幾項重大工程: 1 .主持並參與江陰石油公司2 . 5萬噸級油氣碼頭的設計; 2 .主持並參與張家港哈德公司2 . 5萬噸級油氣碼頭的設計; 3 .編寫了南京科院海岸工程廳可行性研究報告,主持並參與該廳的工程設計,在該廳內建有70米長50米寬的大型波浪池; 4 .編寫了南京科院「泥沙運動基本規律研究實室」工程可行性研究報告,並主持該項工程設計,參與完成180米長風浪設計,該建成后,可在風、浪、流綜合作用下進行航道整治和海岸工程的科學研究。
  18. First the author memorized the yellow river excavation history and concluded development of modern dredging science, and found that most researches of dredging are related to navigation regulation, little used to flood control especially in the yellow river with silty. based on the experiment of generalized physical model of the lower reach of the yellow river, and the study of the loaden flow mechanism and the dredging efficiency, the author get some new ideas as follows : 1

    通過對黃河疏浚的歷史以及現代疏浚工程學的發展進行了回顧和總結,認為已有的疏浚研究大多基於航道疏浚工程,對于防洪疏浚特別是在黃河這種多沙型河流上進行防洪疏浚的研究極為欠缺,本文基於黃河下遊河道概化模型,對疏浚挖沙運動機理及效果等進行了研究,得到以下認識。
  19. An experimental research on notching wet beach of the yellow river with the short - delay blasting is made for eliminating the risk that the main river channel is often threatened by some horizontal and slanting streams occurred on the downstream of the river and solving the problems from the bend cut - off for river channel harnessing, water way dredging and the siltation of the water diversion outlets along the channel

    摘要為了利用爆破解決黃河下遊河道經常出現的橫河和料河威脅河道安全的險情以及河道整治中的裁彎取直、疏浚航道和河道引口淤積的問題,在黃河濕灘上進行了微差爆破開研究。
  20. Tests of ship models ascending rapids with different hydraulic conditions were carried out in a flume with a generalized topography of rapids

    摘要在急流灘地形概化了的試驗水槽中,進行了多種力條件下的船模上灘
分享友人