試驗現場 的英文怎麼說

中文拼音 [shìyànxiànchǎng]
試驗現場 英文
experimental field
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ名詞1 (現在; 此刻) present; now; current; existing 2 (現款) cash; ready money Ⅱ副詞(臨時; ...
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • 試驗 : trial; experiment; test
  • 現場 : 1. (出事地點) scene 2. (工作地點) site; spot; on-site; work field
  1. Standard practice for field procedure for constant drawdown tests in flowing wells for determining hydraulic properties of aquifer systems

    用於測定含水層系統水硬性的流動井中恆定水位下降試驗現場程序的標準實施規程
  2. Secondly, we recommend the practical experiment of cast - in - place piles, including field solid and liquid qualification, experiment purpose, experiment project, experiment equipment, experiment process and the notice of experiment. thirdly, we processed and analyzed experimental daters, studied the rule of strength transferring, and studied the rule of strength transferring of check resistance and side of peg rub resistance, contrasting with common re - draw peg. at last, we advance some unfathomed problem and prospect foreground of cast - in - place piles

    本文首先對支盤樁的基本原理進行了闡述,對其施工過程以及成型過程進行了描述;然後對本次抗拔支盤樁進行了介紹,包括試驗現場地質水文條件,目的、方案、設備以及過程,並對注意事項進行了歸納總結;分析了支盤裝原位抗拔,研究了樁身軸力傳遞規律以及支盤阻力和樁側摩阻力的荷載傳遞規律,並與普通抗拔樁進行了相關對比;最後,本文提出了本次尚未解決的一些問題,並對支盤樁的前景進行了展望。
  3. Soils : investigation and testing. determination of density of materials on site. part 2 : membrane densitometer method

    土壤:調查和.材料密度的測定.第2部分:薄膜密度計法
  4. A good many case of approaching excavation are studied in this article, such as the study of infection of be coal mining to the huayingshan tunnel, technology study of strucked tunnels of metro in shenzhen, countermeasure study of tunnel approaching pile foundation of metro in guangzhou, excavation methods optimized of large cross section subaqueous tunnel approaching pile foundation of lrt in chongqing, etc. on the basic of analysing and concluding relative study production all over the the world by the numbers, classification of approaching excavation, partition of approach zone, formula of partition of approaching zone, approach degree and countermeasure grade of generalized approaching excavation of underground works are put forward. general methods studying and trea

    本文結合作者多年來對華鎣山隧道減少壓煤量研究、深圳地鐵重疊隧道第11頁西南交通大學博士研究主學位論文技術研究、廣州地鐵公紀區間廣紡聯段鄰樁施工對策研究和重慶輕軌大坪大斷面車站鄰近基礎淺埋暗挖工法優化分析等諸多近接施工問題案例的研究,在系統分析和歸納總結國內外相關研究成果的基礎上,系統地提出了廣義的地下工程近接施工的分類、分區、分區指標表達式、近接度與對策等級概念以及分區、分度準則,給出了研究和解決近接施工問題的普遍方法,如數值分析先行,模型證等。
  5. Standard practice for characterization of atmospheric test sites

    大氣試驗現場表徵的標準實施規程
  6. Guide for construction of open area test sites for performing radiated emission measurements

    進行輻射發射測量作業的露天試驗現場建設指南
  7. Metals and its coatings - atmospheric corrosion testing - general requirements for field tests

    金屬及其覆蓋層大氣腐蝕試驗現場的一般要求
  8. Standard test method for determining transmissivity and storage coefficient of low - permeability rocks by in situ measurements using the constant head injection test

    用恆定水頭噴射試驗現場測定低滲透性巖石的透過比和釋水系數的標準方法
  9. Telecommuniciations - digital transport of video teleconferencing video telephony signals - video test scenes for subjective and objective performance assessment

    電信.可視電話會議可視電話信號的數字傳輸.主觀和客觀性能評定的視頻試驗現場
  10. 2. because the data acquisition equipment researched in laboratory must be taken out to the field to acquire the experiment data, we must make it to work independently

    該系統將來需要走出實室到實際的試驗現場去採集數據,如果不能脫離主機,那麼使用起來就很不方便,因此,要求我們必須使其能夠脫機工作。
  11. This paper analyses the character and difficulty of batch control, researches realization technique of batch control based on pcs, presents logic interlock model between testing steps and circuitry switcher, and motor testing field control scheme. shcan2000 system, the hardware and software design and realization are also deeply discussed

    本文分析了間歇控制的特點和難點,研究基於總線控制系統實間歇控制的方法,提出了步驟與線路開關邏輯互鎖模型和電機試驗現場控制方案。
  12. Firstly, the expansive soils fissures at test field in zaoyang, hubei province, are observed and counted by sketch and photograph, and expansive samples are by continuous photographic measurement using long - distance - microscope - system in laboratory. generalized model of fissures distribution for unsaturated expansive soils is put forward

    首先,在湖北棗陽試驗現場,通過手工素描與拍照的方法對膨脹土裂隙進行了觀察統計;在室內,利用遠距光學顯微鏡系統對膨脹土裂隙進行了連續拍照觀測,建立了非飽和膨脹土的裂隙概化模型。
  13. Engineering properties of this new type of fill material are discussed on the basis of laboratory modeling, field measurement and results of testing, thus laying a solid foundation for application of cement solidified soil in the core structure of cofferdams

    根據室內成型監測與檢測結果探討了水泥固化土新材料的工程特性等,為水泥固化土新材料在圍埝堤心結構中應用打下了堅實的基礎。
  14. Soils : investigation and testing. in situ pore pressure measurement. part 1 : piezometric tube

    土壤:調查和.孔隙壓力測量.第1部分:測壓管
  15. The study solves engineering problem as follows : ( 1 ) the systematic study on the historical course of xigeda strata deposit and geologic environment includes strata, lithologic characters and constitution et in the liangshan and panzhihua region. the results show that the xichang - panzhihua express way is controlled by the anninghe fault and the xigeda fault, the earthquake frequently happen in the region of pass, the different sedimentation number is more great, they effect the road building, safety in operation and structure belong road ( 2 ) because in some place the xigeda strata is foundation and roadbed, the study on the basic properties of the xigeda strata include density, moisture content plastic and liquid limit graduation. the results show that the xigeda strata is deposition in lake, the main component is mudstone and sandstone, the fine particle is main, it has some viscosity, the moisture content of mudstone is different the it of sandstone, the other property are likeness. the xigeda strata has no dilatation on total, some claystone have low and medium dilatation ; ( 3 ) the study on the basic properties of xigeda filler include the composition of matter the biggest standard dry density, the optimum moisture content the results show that xigeda filler can use as road material, it is well grade filler and admixture filler on essence, its compaction index should change in different place because the property is controlled by mudstone and sandstone that change is great in different place ; ( 4 ) the study on the xigeda filler craft used as express way roadbed, includes suitable thickness, compaction numbers and methods and equipment choice et

    公路沿線廣泛分佈有昔格達地層,昔格達地層能否用作高速公路路基填料,國內沒有先例,本論文就是結合導師的科研項目,在非典期間,長達5個月的工作,完成了從施工工藝到路堤分層沉降監測等工作,是面對生產實際,認識昔格達地層的性質和其作為地基、路基和填料應用中面臨的問題進行的研究。主要的研究內容有:對攀西地區地層巖性、構造等地質環境和昔格達地層的沉積歷史過程作了系統的分析,研究表明西攀高速公路主要受安寧河斷裂和昔格達斷裂影響,通過地區地震活動頻繁,差異沉降較大,對公路建設、安全運行和沿線構築物設計有較大影響;由於昔格達地層在有些路段作為地基、有些作為路基,對其基本性質進行了研究:包括天然密度、含水量、塑液限、顆粒級配等指標的研究。研究成果表明:昔格達地層為湖相沉積,主要為砂巖和泥巖,它以細粒組為主,同時粘粒的存在,使其具有一定粘性。
  16. Test relating to pavements. determination of the apparent specific gravity of the materials in situ. part 1 : measurement of the mean value using a gammadensimeter in one point with direct transmission

    路面.材料明顯特殊重量的測定.第1部分:在一直接發射點用密度儀測量平均值
  17. Metals and alloys - atmospheric corrosion testing - general requirements for field tests

    金屬及合金.大氣腐蝕.的總要求
  18. En iso 8565 metals and alloys. atmospheric corrosion testing. general requirements for field tests

    金屬和合金.大氣腐蝕.的一般要求
  19. By using the testing data of laboratory test, field test, and tests of swelling rock of the nanjing meishan ferrous mine, the swelling constitutive relationship proposed in this thesis has been proved

    用室內以及南京梅山鐵礦膨脹巖側限膨脹的數據對文中提出的側限膨脹應變關系進行了證。
  20. Soils : investigation and testing. measurement of density on site. gamma - gamma ray log

    土壤:調查和.密度的測定. -射線測井記錄
分享友人