試驗聯接 的英文怎麼說
中文拼音 [shìyànliánjiē]
試驗聯接
英文
test splice- 試 : 名詞(古代占卜用的器具) astrolabe
- 驗 : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
- 聯 : Ⅰ動詞(聯結; 聯合) unite; join Ⅱ名詞(對聯) antithetical couplet
- 接 : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
- 試驗 : trial; experiment; test
- 聯接 : [電工] strapping; coherence; lashing; link up; coupling; [宇航] mate聯接板 gusset piece; gusset p...
-
First, the theory of fretting wear and studies on fretting fatigue were introduced and the parametric method was used in the process of creating the model of dovetail joints in ug software. the elastic contact problem is analyzed in finite element method ( fem ) and is used to the parameters " distribution and contact stress of the joint are obtained on the base of ansys code. with the effect factor of load frequency, the prediction method of fretting fatigue life of dovetail joint under low and high / low cycle complex load is proposed
本文介紹了微動損傷的機理和微動疲勞壽命的研究方法;利用ug軟體對燕尾榫聯接結構創建了參數化實體模型;基於ansys軟體平臺求解彈性接觸問題,獲得了榫聯接結構接觸應力及接觸狀態量的分佈;在已有微動疲勞壽命預測模型的基礎上,引入載荷頻率影響因子,對低周、高低周復合載荷作用下的燕尾榫聯接結構進行了微動疲勞壽命的預測,與試驗結果對比表明採用本文提出的方法預測榫聯接結構的微動疲勞壽命是有效的。Shapes and dimensions of fifth wheel coupling pins for semi - trailers
半掛車用試驗專用輪聯接銷的形狀和尺寸Based on the terszige and biot theory, initially analyze the economical of this experiment, directly save investment 22 % after compute. after that, computing the settlement of highway foundation, comparing the computing and survey value, the predict formula of vacuum - heaped load combining precompression for designing, this formula show that the distortion law of consolidation progress. at the same time, based on the position and room experiment, analyzes the intension transformation in soft soil and criteria of stabilization control
在太沙基和比奧固結理論的基礎上,先分析了此次試驗的經濟性,經核算直接節約投資22 ,經濟效益十分明顯;隨后對真空堆載聯合預壓法加固軟土路基的沉降量進行了估算,並與實測值作對比分析,得出了真空堆載聯合預壓下的沉降量估算公式,能反映「真空」加固過程的變化規律;同時根據現場和室內試驗,分析了軟土強度的變化,以及給出並驗證了工后沉降控制標準。The paper describes the modeling techniques and main points of the whole vehicle in the virtual proving ground by modeling the finite element models of the body in white, suspension system, tire and nonstructural masses of a business car, and simply verifying the whole vehicle model
摘要通過對某型商務車白車身、懸架系統、輪胎、非結構質量進行有限元模型的建立、聯接裝配,直至完成整車的有限元模型的過程,並對該模型進行簡單的驗證,來說明在汽車虛擬試驗場中整車的建模技術與要點。For the foundation treatment of the experimental segment of the south shore expressway of the hangzhou bay cross sea bridge, the in situ monitoring has been conducted for more than two years by use of vacuum - surcharge preloading
摘要結合杭州灣跨海大橋南岸接線高速公路試驗段工程,對真空堆載聯合預壓技術處理的試驗斷面進行了長達兩年多的現場測試。A good many case of approaching excavation are studied in this article, such as the study of infection of be coal mining to the huayingshan tunnel, technology study of strucked tunnels of metro in shenzhen, countermeasure study of tunnel approaching pile foundation of metro in guangzhou, excavation methods optimized of large cross section subaqueous tunnel approaching pile foundation of lrt in chongqing, etc. on the basic of analysing and concluding relative study production all over the the world by the numbers, classification of approaching excavation, partition of approach zone, formula of partition of approaching zone, approach degree and countermeasure grade of generalized approaching excavation of underground works are put forward. general methods studying and trea
本文結合作者多年來對華鎣山隧道減少壓煤量研究、深圳地鐵重疊隧道第11頁西南交通大學博士研究主學位論文技術研究、廣州地鐵公紀區間廣紡聯段鄰樁施工對策研究和重慶輕軌大坪大斷面車站鄰近基礎淺埋暗挖工法優化分析等諸多近接施工問題案例的研究,在系統分析和歸納總結國內外相關研究成果的基礎上,系統地提出了廣義的地下工程近接施工的分類、分區、分區指標表達式、近接度與對策等級概念以及分區、分度準則,給出了研究和解決近接施工問題的普遍方法,如數值分析先行,模型試驗、現場測試驗證等。The pilot project, with almost hk 1 million sponsored by hsbc, is a joint partnership of wwf with fujian provincial forestry department and zhangjiang estuary national nature reserve to protect the wetlands in south china
本項接近港幣100萬元的試驗專案由匯豐資助,並由世界自然基金會福建林業廳與漳江口國家級自然保護區聯合進行,目的在於保護華南地區的濕地。In order to solve it radically, making power assembly of bj1036e2f1 light truck the research object and through dynamic simulation analysis of power assembly, this thesis obtains the distribution rules of forces of the bolts linking three shells mentioned above and the relation between forces of the bolts and rotate speed of engine. after finite element mode analysis of these three shells, inherent frequency and vibration model of shell of power assembly are gained, and thus its dynamic character is realized. based on computer simulation analysis, experimental model of power assembly is acquired by vibration test and strength test of shell of power assembly, and the relation of forces of the shell and rotate speed of engine and imbalanced mass of rotate components is studied
為了從根本上解決該問題,本論文以bj1036e2f1輕卡動力總成為研究對象,通過動力總成的動力學模擬分析,找出了三殼之間聯接螺栓受力的分佈規律和螺栓受力與發動機轉速的關系;通過三殼的有限元模態分析,得到了動力總成殼體的固有頻率與振型,從而了解了動力總成殼體的動態特性;在計算機模擬分析的基礎上,通過動力總成殼體的振動測試和強度測試,得出了動力總成的試驗模態,並研究了殼體受力與發動機轉速和旋轉部件不平衡質量的關系。The result was the discovery of 24 places in the genome so strongly associated with a disease that there was only one chance in 2m of the link being accidental
試驗結果發現,基因組的24個地方與一種疾病強烈相關聯,因此偶發性的聯接機率僅只存在兩百萬分之一。With added the tmd, bod reduce flap epuipment. added the second form beam, the preparative box and the connect both line etc on the big bridge of yellow river at beijing to guangzhou line, and contrast between before and after reinforced, we analysed the result and dicided to adopt the reinforce project to connect both line
在京廣黃河大橋上通過實施加tmd 、 bod減振器,增設第二平聯、準箱形梁及雙線剛性連接等試驗,利用通過列車進行加固前後的對比測試,通過結果分析決定在京廣黃河大橋上採用雙線剛性聯接方案進行加固。In order to make the studying about the seismic exploration method possess systematic nature and the ability of tackling key problem in front - zone of mountain, we have done the research work of tackling key problem aiming at the field gathering technology of seismic exploration of the complicated structure belt ( the construction of underground and the earth ' s surface condition are complicated ) of front - zone of mountain in this text, and a large number of relativity trials by the close combination of production and scientific research, summarized a set of field method of the complicated structure belt of front - zone of mountain, adjusted both of trial factor and construction factor of the field gathering in time, achieved finally the goal of making its structure character clear
近幾年來,隨著地震勘探裝備和技術的改進,野外資料採集技術有了新的進展,主要表現為多種震源聯合激發方法(井炮和大噸位可控震源) ,基於地表條件及表層調查基礎上的激發選點方法,小道距、長排列、高覆蓋接收方法,基於模型的「分段、分線、分區」觀測系統目標設計方法等,取得了顯著的勘探效果。為了使山前地震勘探方法研究具有系統性和攻關性,通過本文對復雜山前復雜構造帶地震勘探的野外採集技術進行攻關研究,進行了大量具有針對性的試驗,總結出了一套山前復雜構造帶野外施工方法,最終達到了搞清復雜山前復雜構造帶山前復雜構造帶構造特徵的目的。The research focus on soil c compaction principle under the action of combination impaction and vibration by the test and theory method based on elasticity, plasticity and rheology performance. put a lot of stress boxes in the soil. measure and record the soil stress directly, then process the record datas by mathematic method
在方法上採用了理論與試驗相結合的研究方法,在土體彈、塑特性及土體流變特性的理論基礎之上,在土體中埋放了大量的壓力盒,通過測量和觀測儀器直接記錄土體內部各點在沖擊與振動聯合作用下的內應力值。Fibre optic interconnecting devices and passive components - basic test and measurement procedures - tests - screen testing of attenuation of single - mode tuned non - angled optical fibre connectors
光纖互聯裝置和無源部件.基本試驗和測量程序.試驗.單模式調諧無角度光纖連接器衰減篩析試驗Fibre optic interconnecting devices and passive components - basic test and measurement procedures - part 2 - 43 : tests - screen testing of return loss of single mode pc optical fibre connectors
光纖互聯裝置和無源部件.基本試驗和測量步驟.第2 - 43部分:試驗.單模pc光纖連接器回程損失的篩析試驗Test method for physical - chemical properties of electrical carbon product. connection electrical resistance of brush flexible connection
電炭製品物理化學性能試驗方法.刷體與軟接線聯接處的聯接電阻Answer : preparative job includes : understands workplace one, the moving circumstance of 2 equipment, this job has with moving equipment without direct connection, have the job that cooperates without need with other team and group ; makes working priority discipline and the blemish that prepare to solve and weak point ; the staff member makes clear to divide the work and be familiar with the concerned data such as blueprint and test gauge cheng ; should be had the blueprint that agrees with actual state, record that examines last, newest rectify spare parts of the instrument that decides requisition, test gauge cheng, qualification, machine parts or tools kept in reserve, tool and join lead to wait ; is a few righter important equipment, especially complex protector or couplet jumps loop protector, should weave test program, working controller should fill in ticket of protection safety precaution, examine and approve via technical chief, just can carry out
答:預備的工作包括:了解工作地點一、二次設備的運行情況,本工作與運行設備有無直接聯系,與其他班組有無需要配合的工作;制定工作重點項目及預備解決的缺陷和薄弱環節;工作人員明確分工並熟悉圖紙與檢驗規程等有關資料;應具備與實際狀況一致的圖紙、上次檢驗的記錄、最新整定通知單、檢驗規程、合格的儀器、備品備件、工具和連接導線等;對一些重要設備,非凡是復雜保護裝置或有聯跳迴路保護裝置,應編制試驗方案,工作負責人應填寫繼電保護安全措施票,並經技術負責人審批,方能實施。The function of controlling the interfacing apparatus has been realized and the status of the interfacing apparatus has been displayed in pc. at the same time, the hermetic character of the latex gasbag has been tested. the feasibility of the kind of the underwater hermetic form has been validated
在水箱中進行了對接裝置的實驗聯調,綜合顯控系統實現了對對接裝置的控制,並能實時顯示對接裝置的狀態,同時測試了橡膠氣囊密封性能,驗證了該種水下密封形式的可行性。Fibre optic interconnecting devices and passive components - basic test and measurement procedures - part 3 - 21 : examinations and measurements ; switching time and bounce time
光纖互聯裝置和無源部件.基本試驗和測量步驟.第3 - 21部分:試驗和測量.接通和返回時間Fibre optic interconnecting devices and passive components - basic test and measurement procedures - part 2 - 2 : tests - mating durability ; corrigendum 1
纖維光學互聯器件和無源元件.基本試驗和測量程序.第2 - 2部分:試驗.配接耐久性.勘誤1This paper simulate oxidation - deoxidize reaction, o enzyme catalysis and the origin of life. the stella mode of oxidation - deoxidize reaction can help student understand chemistry reaction in integer, train student understand correlation from the all and the one. stella simulation help us to research enzyme catalysis promoter stable state former dynamics, and to observe the basic measure of the whole response or some response directly, and offer effective datum that can be used to analysis complicated response mechanism, because of too many relevant disputes of origin of life, to introduce student various kinds of theories maximally, we use stella software to imitate, strive to give students the ultimate thinking space, make them to be able to verify their idea in the models. in this course, teachers and students can observe the result and test the theory through simulation, learn what to happen when the former hypothesis and scene changed, and turn the study way of infusing and absorbing into discussion study, make study especially thinking ability of student get improvements by a large margin
氧化還原體系的stella模型能使學生對復雜的化學反應有整體理解,培養學生從整體的角度理解各種物質間的相互作用聯系; stella幫助我們對酶催化反應穩態前動力學進行研究,可以直接地觀察整個反應的基本步驟或局部反應,提供可用於分析復雜反應機制的有效數據; stella創建的生命起源的模型,力爭給學生最大的思維空間,使他們可以在模型中驗證他們的想法,在此過程中,教師和學生可以通過模擬以試驗理論、觀察結果,並學習到原有假設或情景改變時會有什麼情況發生,將灌輸性、吸收性的學習方式變為討論式學習,使學生的學習特別是思維能力得到大幅度的提高。分享友人