試驗鉆探 的英文怎麼說

中文拼音 [shìyànzhēntàn]
試驗鉆探 英文
experiment drilling
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ動詞1 (試圖發現) try to find out; explore; sound 2 (看望) call on; visit; see 3 (向前伸出)...
  • 試驗 : trial; experiment; test
  1. 176 drillholes, 9 coreholes, 178 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works along tuen mun road

    176個孔, 9個土芯孔, 178個井,重整48個豎管測壓計及一系列的土壤和巖石樣本的實
  2. 224 drillholes, 250 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works and the structural condition survey on existing highway structures along tuen mun road

    224個孔, 250個井,重整48個豎管測壓計,將所取得的土壤和巖石樣本進行實,以及對屯門公路上現有的公路建築物進行結構狀況勘測。
  3. The stabilities of the accumulations are analyzed by means of geological survey, drilling, exploratory adit, geophysical exploration and scientific research test etc. and then the relevant engineering treatments for various of the accumulations on the project are put forward as well

    在勘察過程中我們採用了地質測繪、、硐、物、科研等多種勘察方法與手段,在勘察成果基礎上對堆積體穩定性進行了分析,並結合對工程的不同影響提出了相應的工程處理措施。
  4. With regard to its field drilling applications in the geologically loose sandy pebble layers, kl vegetable - gum drilling fluid showed itself with excellent rheological behaviours in its abilities of lubrication, lost circulation, suspension and removal of debris, anti - shear shinning, and high coring rates, which satisfactorily meet the demands of geological boring in the dam foundation of huangjin ping hydroelectrical power plant

    通過在黃金坪水電站壩基深厚砂卵石覆蓋層取芯的現場,證明了kl植物膠沖洗液具有優良的流變特性,潤滑、堵漏、懸浮排除巖屑和抗剪切稀釋能力顯著,可實現高取芯率,能很好的滿足地質對取芯質量的要求。
  5. In order to ensure the safety of engineering, it should be careful to use the test result of normal drilling sampling, the pitting sampling, shaft sampling, or double - tubles and thin - wall soil collecting methods should be used

    為保證工程安全,對常規孔取樣成果的使用應當慎重,對重要工程宜採用坑、豎井取樣,或採用雙筒薄壁取土技術。
  6. Numerous laboratory investigations were carried out to enable operating strategy to be formulated, including rig experiments to examine the effect of formed coke on stack permeability with various burdens, model work to determine optimum charging sequences for coke and briquetts with the selected burden, pilot - coke - oven trials to determine the most suitable coal blend for the base period coke

    為了使操作可以程式化,我們已經進行過許多實性研究,包括用來檢測型焦在不同負荷下對疊加浸透性的影響,用模型製作來確定在特定負荷下焦炭和煤磚的最佳加料順序,和用先導煉焦爐來確定基期焦炭所需的最適合的煤混合量。
  7. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科研項目「西攀高速公路昔格達組泥巖層中孔樁提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根樁身內埋設量測元件樁的單樁豎向靜載荷資料,分析了各樁特別是常規沖孔灌注嵌巖樁在昔格達泥巖中的軸向力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載力的計算公式的基礎上,討了在昔格達泥巖層中的沖孔灌注嵌巖樁的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對灌注樁后注漿技術研究成果的基礎上,結合現場研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為壓力灌漿技術的工程應用和進一步研究提供經,並為今後在該地層中合理選用樁型以及指導施工提供了依據。
  8. Based on the results of vertical static loading test and stress test for longhole bored pile in loess foundation, by analysing the transferring law of axial force and the action of lateral friction resistance and bottom resistance, the paper discusses the influences of two types of holing technology on bearing capacity behavior

    本文通過黃土地基中旋挖孔灌注長樁和泥漿護壁孔灌注長樁靜載荷和樁身應力的測,分析了黃土地基中兩種成孔工藝孔灌注長樁樁身軸力的傳遞規律、樁側阻力及樁端阻力的發揮性狀,討了兩種成孔工藝對孔灌注長樁承載力的影響。
  9. This article introduced the method of geological investigation of nanling tunnel karst disease, elaborated the tunnel engineering geology conditions, especially the karst water, the karst water power channel and the harm of karst water, and analyzed the cause that produced the karst disease

    摘要南嶺隧道巖溶地下水活動造成地表坍陷、洞內泥砂淤塞等病害,其原因在於隧道施工遺留的導洞長期疏排巖溶水,採用地質測繪、物、水文地質等綜合勘察方法,查明地下水通道位置、地下水流速、流向,針對病害原因,提出攔截、封團、疏排、填充等綜合整治方案。
  10. A large amount of data were acquired from the measurement in situ surfacial soil strength on the tidal flat by using portable cone penetration, shallow drilling, laboratory analysis of delta, and other means

    利用輕型靜力觸對灘面表層土體強度進行密集型的測,同時結合淺層,室內等手段,獲得了大量數據,進行了資料整理、分析。
  11. In this paper firstly introduces the development of scientific drilling project in the developed countries, secondly presents the opportunities and challenges faced by china in the process of proceeding ccsd ( chinese continental scientific drilling project ), and the main contents of the paper focus on researching and developing a novel drilling fluids, formate brine solid - free drilling fluids, that may be suitable for ccsd

    本文首先介紹了科學在發達國家的進行情況,相繼闡述了中國進行大陸科學工程將面臨的機會和挑戰,論文的主要內容是研究一種能適合大陸科學井液體系? ?甲酸鹽無固相井液體系。論文的重點分甲酸鹽無固相井液體系的若干理論問題研究和兩部分。
  12. Someone think it must use permeating theory to design, the others think it must use permeating theory to design. the building ministry made out the working standard of the later pressure grouting of pour pile, but it stand at the industry standard, is n ' t enough perfect and comprehensive. in this paper, the author put forward the design principle by analyzing the reasons that affect the bear load ability of the drilling hole pour pile and the principle that improve the bear load ability of single pile by later pressure grouting, put forward th e working technology and requirement of check before acceptance by analyzing and summarizing several models such as the chinese railway 11 office residential high building

    本文通過分析影響孔灌注樁承載力的因素以及孔灌注樁后壓漿提高單樁承載力的機理提出了設計計算的原則;通過中鐵十一局高層住宅樓孔灌注樁低壓力后壓漿工程對6根樁的壓漿對比揭露確定了低壓力后壓漿所適用設計理論和方法;確定了低壓力后壓漿的壓漿壓力、壓漿量等參數;經過實及經總結確定了壓漿材料的選取原則及方法,列出了低壓力后壓漿在不同土層適用的壓漿材料。
  13. This differ with computation modal that design the foundation pier very big, bearing power too than design increment ; usage mechanics numerical analysis device with limited a logarithm of timw fitting method logt, noted the rock strength in stake tip of the borehole cast - in - place concrete pile to proceed with the structure steadiness the simulation compute to study with the fixed amount, designing for the engineering to start construction to provide for science with the spot

    本研究結合現場、力學數值分析和有限單元分析,對巖溶地段孔灌注樁的施工工藝、荷載傳遞機理、持力層頂板厚度及嵌巖深度等方面作一些討性研究,為該工程的設計和施工積累經,並為該類課題的進一步研究奠定了基礎。
  14. This article aims at the characteristics of a baibie harbor great bridge, by the spot construction test and mechanicses, limited an analysis, dissolve to the construction technics and loading capacity, stake deliver mechanism, bearing stratum and glazing rock depth area curve etc. s of the borehole cast - in - place concrete pile in the karst terrain do the some study research

    國內外對于巖溶地區孔灌注樁的研究,主要是針對具體工程的施工方案描述和施工故障及處理措施,對巖溶地段基樁的承載機理及承載力的綜合研究則未見報道。本文針對白墅港大橋的特點,通過現場施工及力學、有限元分析,對巖溶地區孔灌注樁的施工工藝、荷載傳遞機理、持力層厚度及嵌巖深度等方面做一些討性研究。
  15. Based on the investingation and some study methods of the stability on the goaf, the paper has the goaf of the first and second tunnels of wu long channel on coal mine railway leased line in da ning of shanxi province as an example, according to the engineering geological invesitigation and maping in the earth ' s surface, also combining the visit on the relate people, firstly has a geological judge on the space extend of the mostly ledges which have been picked ; then adopts the instrument of engineering surveying and checking ( for short sws ) which is relatively advanced inside and outside to test by surface wave the rockmass and solid near the middle line of the tunnel ( total forty meter ), and has a relatively exact judgment on the place that the goaf impossible reveal ; lastly passing the validate by drilling, it make clear that the results which tested by sws is reasonable and believable, based on finding out clearly the space extend of the goaf, the author makes a relatively systemic study on the stability of wall rock around the goaf

    因此,查明采空區的具體位置,在此基礎上對場地進行工程適宜性評價,對整個工程建設具有重要的指導意義。本論文在總結前人對地下采空區勘察及有關穩定性研究方法的基礎上,以山西大寧煤礦鐵路專用線五龍溝1 ~ # 、 2 ~ #隧道采空區為研究實例,在詳細的地表工程地質調查和測繪的基礎上,結合通過對采空區有關人員的訪,首先對主要開采礦層的空間展布進行地質判斷;然後採用國內外較為先進的工程勘與檢測儀(簡稱「面波儀」 ) ,對1 ~ # 、 2 ~ #隧道中線兩側一定范圍內(共40米)進行了面波測,對采空區的可能出露部位進行了較為準確的判斷;最後通過加以證,表明面波儀的測結果是較為合理可信的。
  16. Abstract : the chromium leaching - out toxicity was determined with different extraction agents, different extracting time, different solid - liquid rate and different extracting method. in accordance with petroleum drilling engineering and protecting environment, a test method suited to evaluate the leaching - out toxicity of waste drilling mud was suggested

    文摘:以鉻為分析指標,討了井廢棄泥漿在不同的提取劑、不同的提取時間、不同的固液比以及不同的提取方式下鉻的浸出毒性大小,提出了適合評價井廢棄泥漿中鉻的浸出毒性的方法。
  17. The chromium leaching - out toxicity was determined with different extraction agents, different extracting time, different solid - liquid rate and different extracting method. in accordance with petroleum drilling engineering and protecting environment, a test method suited to evaluate the leaching - out toxicity of waste drilling mud was suggested

    以鉻為分析指標,討了井廢棄泥漿在不同的提取劑、不同的提取時間、不同的固液比以及不同的提取方式下鉻的浸出毒性大小,提出了適合評價井廢棄泥漿中鉻的浸出毒性的方法。
  18. The building guantou especially the big bridge engineering geology condition is more complicated, by drill to explore the data to announce to public the rock soil body of types, the engineering geology function and the geologic strata circumstance, this time soil kind and the rock samples that investigates to still pass to adopt in great quantities to carry on indoor experiment, get a great deal of data, in order to get the useful rock soil parameter, this thesis still introduces to beg the process of take the rock soil parameter in the way of the mathematics covariance

    館頭特大橋工程地質條件較為復雜,通過資料揭示了巖土體的成因類型、工程地質性能以及地層情況,此次勘察還通過大量採取的土樣和巖石樣本來進行室內,得到了大量的數據,為得到有用的巖土參數,本論文還介紹了通過數理統計的方法求取巖土參數的過程。
  19. Adopting the deformation harmony theory, the numeric calculation of the curve of load versus settlement is made. the fitting results between the calculated curve of load - settlement and the measured one of piles with different construction process are illustrated. hence, under the condition of few or no static load test data, the performance of bearing capacity of single bored pile in loess may be predicted utilizing indexes of shear wave velocity, static cone penetration test and modification coefficient of depth, so it is remarkable to reduce the blindness of preliminary design of pile

    通過室內及原位測指標進行理論計算與現場實測值的對比,筆者引入了施工工藝修正系數k _ ( c1 )和k _ ( c2 )及深度修正系數,使理論計算值與現場實測值具有良好的一致性,進而通過變形協調理論對荷載?沉降曲線進行數值計算,並用不同施工工藝的實例說明了理論計算荷載?沉降曲線與實測荷載?沉降曲線的擬合效果,從而達到可在不做靜載荷或少做靜載荷的情況下通過剪切波速和靜力觸指標以及施工工藝修正系數等預測黃土地基中孔灌注樁承載性狀,這對于工程初步設計中減少設計的盲目性具有十分重要的現實意義。
  20. In chapter six, based on the preceding chapters " research, the practicality of the full scale dr i 11 ing simulating test device has been tested by the debugging and the performance test. under simulating drilling conditions, the rock mechanical properties and the bits " dynamical tests are analyzed and set forth specifically. at the same time the effect of bottom pressure difference on the oil field exploration and development has been discussed

    第六章在前述分析研究的基礎上,通過對模擬裝置的系統調及性能測證了全尺寸井模擬裝置的實用性,在井模擬條件下對巖石的機械性質、牙輪頭動態測給予了具體的分析闡述,同時還分析討了井底壓差對油田勘開發的影illb ,並且為宋深101井的實際施工作業提供了非常有價值的指導參數。
分享友人