調整井 的英文怎麼說

中文拼音 [diàozhěngjǐng]
調整井 英文
adjustment well
  • 調 : Ⅰ動詞1 (配合得均勻合適) harmonize; suit well; fit in perfectly 2 (使配合得均勻合適) mix; adju...
  • : Ⅰ形容詞1 (全部在內; 完整) whole; all; complete 2 (整齊) neat; tidy; orderly Ⅱ動詞1 (整理; 整...
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  • 調整 : adjust; tune up; trim; trimming; variation; modulation; arrangement; debug; rectification; redres...
  1. Based on the development feature analysis, this paper studies thoroughly the reservoir flood feature and remaining oil distribution through the microstructure, sendimentary phase, reservoir heterogeneity and well control, and proposes the comprehensive adjustment based on the injection and development well net structure and improvement the result of the research is obvious with the production degression rate from 9. 14 % of 1997 to present - 1. 46 %, and water rate from original 0. 33 % to present 0. 16 %. in summary, the research idea, method and new achievement of the thesis provide a scientific geological basis for the oilfield development improvement

    在對本區開發歷程和開采特徵分析的基礎上,從微構造、沉積微相、儲層非均質性、網控制等方面深入地分析了油藏水淹特徵及剩餘油分佈規律,提出了以完善注采網、調注采結構為目的的綜合調措施,已見到了明顯的效果:油田遞減由1997年的9 . 14降至目前的- 1 . 46 ,綜合含水上升率由原來的0 . 33降至目前的0 . 16 。
  2. In order to keep the desired line speed and carry out the normal logging without troubles, the rotational speed should be rectified manually which is a heavy work, and also the output consistency is not satisfactory

    中絞車滾筒半徑不斷變化,電纜的線速度也不斷變化,為保證線速度恆定和順利測,需要不斷進行人工調,工作強度大,速度輸出一致性差。
  3. The study gets the following conclusions : 1 ) inverted nine - spot pattern water flooding is used in the early stage of the development, while linear water flooding is used in the later stage ; 2 ) well array is parallel to the fracture trend ; 3 ) the well arrangement of barycentric position method is a suitable pattern adjustment method in the later period of the development in low permeable oil fields

    研究認為,一是油田開發初期注采方式採用反九點法面積注水,開發後期調為線狀注水方式;二是排方向與裂縫走向平行;三是「重心位置」布方式對低滲透油田開發後期是較為適合的調方式。
  4. To solve some questions about oil production declining quickly, production and injection patterns are imperfect, the low degree of reserves control, and the injection water not enough in injection well, we have taken measures such as strengthen the geologic integrated research, drill extension well and adjustment well, strengthen water injection system, and optimize fracturing techniques, which has improved reservoir development effect

    為了解決產量遞減快、注采網不完善、儲量控製程度低、注水欠注等問題,採取加強地質綜合研究、鉆擴邊調整井、強化注水系統和優化壓裂工藝等措施,有效地改善了油藏開發效果。
  5. The main work is done with the help of model experiment. in the flood - relief experiment, the flood carrying capacity of spillway tunnel is checked. in the hydraulic experiment of the diversion power conduit system, the followings are studied : the flow condition and fluctuation in the surge chamber, the distribution of flow velocity before the rack in the surge shaft, the amplitude of stage in the quick gate bay etc. the test step, content and results of different proposals are introduced in details

    本項優化試驗研究的目的主要在於,通過泄洪系統體水力學試驗,校核泄洪洞的泄流能力;通過發電引水系統體水力學試驗,研究調內水流流態和水位波動情況、調內攔污柵前流速分佈情況;確定快速閘門內水位波動幅度;試驗確定壓力管道水擊壓力穿系數以及泄洪洞弧形門處的水壓力。
  6. During field application, the adjustment while drilling technique of horizontal wells for ultra - thin oil layers has been improved to accurately control geosteering, optimize well course and decrease the ineffective section to the limit

    在實施過程中,完善了適應超薄油層特點的水平隨鉆調技術,實現了準確把握地質導向、優化眼軌跡,最大限度地降低了無效段。
  7. In order to geosteering, log - geology model of target formation should be built according to logging data and the interpreting result of wells nearby. geosteering parameters model is created to build simulative curves. compared these curves with logging curves, the position and drilling direction of the bit can be found combined with the concrete geological situation

    要實現地質導向,首先要根據鄰的測資料及其解釋結果建立目標層測地質模式,然後通過建立地質導向參數的預測模型構造相應的模擬曲線,將模擬曲線與實測曲線進行對比,結合具體地質情況,確定鉆頭在目標層中的位置及其鉆進方向,及時調整井眼軌跡,使其始終保持在目標層中物性最好的部位。
  8. This study made a conclusion ? amely in order to realize following the geological target while drilling, on the basis of making a better geological and drilling design for horizontal well, we must make full use of mwd, lwd and integrate logging to carry out lithfacy identifying in real time, the lwd interpretation and formation evaluation, to set up geological model of target formation, to select geosteering marked formation and compare simulative curves with lwd curves f to fix on the drilling direction of bit upper and declination, the position in target oil - gas layer, to revise borehole track in real time, to make it extend in reservoir better interval as possible

    研究認為,在做好水平地質設計和鉆設計的基礎上,要實現隨鉆跟蹤地質目標鉆,必須充分利用隨鉆測量、隨鉆測和錄等資料,從實時巖性識別、隨鉆測解釋和地層評價、目標層地質模型建立、導向標志層的選取及模擬曲線對比等方面入手,確定鉆頭上下傾鉆進方向及在目標層中的位置,以實時調整井眼軌跡,使其盡可能在儲層物性較好的部位延伸。
  9. Abstract : defining method of moving speed of vertical shaft hoist is discussed. the ralation of economy speed coefficient and hoisting height are expounded for calculating economy hoist speed. the hoist speed is adjusted according to change of hoisting assignment

    文摘:論述立提升機運行速度的確定方法,闡明經濟速度系數與提升高度的關系,為計算經濟提升速度提供依據,得出根據提升任務的變化相應地調提升速度的結論。
  10. If pre - drilling mode was taken in an offshore oil development, pgb - free well drilling technology might be adopted for supplementary wells when the pgb slots were totally occupied

    摘要採用預鉆方式開發的海上油氣田,對水下鉆基盤鉆槽孔用完后增鉆的調整井,可採用無基盤鉆方式作業。
  11. The re - recognition on the faults in xingnan development area can direct the work of plotting development plan, adjustment of injection - production relation, perfect injection - production patterns and dynamic analysis in the process of production

    通過對杏南開發區斷層的再認識,對油田開發方案的編制、注采關系的調、注采網的完善及生產過程中進行動態分析起到了積極的指導作用。
  12. One of the crucial issues in reservoir engineering study is how to choose pattern well spacing in order to reach the highest recovery and optimal economic efficiency by waterfooding process for field development project designing and well pattern infill or adjustment

    摘要在油田注水開發方案設計和網加密調工作中,選用何種布方式或網密度,使油田水驅採收率獲得最高、油田開發經濟效益達到最優,這一直是油藏工程研究的主要問題之一。
  13. Aiming at some techniques about to the cementing quality can solve some difficult problems of poor cementing quality

    有針對性地提高固質量的工藝技術,可以解決調整井質量差的難題。
  14. Research and application of cementing technology of adjustment well in daqing oil field

    大慶油田調整井技術及應用
  15. Influence factors and countermeasure of cementing quality of adjustment wells in henan oil region

    影響河南油區調整井質量的因素及對策
  16. Optimization and control for completion pressure system and cementing technology of adjustment wells

    調整井壓力系統及固工藝的優化與控制
  17. The poor cementing quality of adjustment wells has serious influences on the mini - layer separation oil production of oil field

    摘要調整井質量差對油田細分層開采有嚴重影響。
  18. Some main factors which have influenced the cementing quality of adjustment wells in henan oil region include high pressure water injection wells, large pressure differences inter - zones, and mud property, etc

    在河南油區影響調整井質量的主要因素有注水高壓,層間壓差大以及泥漿的性能等。
  19. The actual field practice has shown that it can improve the cementing quality of adjustment wells apparently to control dynamic interferes of formation factors, to use the temporary plugged screen, to adjust the mud property, and to optimize cementing project

    現場實際施工表明:控制地層因素動態干擾、使用屏蔽暫堵技術、調泥漿性能、優化固設計等可以明顯提高調整井質量。
  20. Fourthly, summarized the methods and the principals for pre - stack and post - stack 4 - d seismic data processing ; proposed the criteria for seismic data process ; built a set of processing flow. through the real data processing ( 029 fault block ), obtained reasonable results. the processed result was approved by the further production well

    第四,總結了迭前、迭后四維地震資料處理的方法與原理,針對高29斷塊的實際資料,提出了處理準則,建立了處理流程,獲得了良好的處理效果,並得到開發開發調整井的證實。
分享友人