負峰值 的英文怎麼說

中文拼音 [fēngzhí]
負峰值 英文
negative peak
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : Ⅰ名詞1. (山的突出的尖頂) peak; summit 2. (形狀像山峰的事物) peak-like thing Ⅱ量詞(用於駱駝)
  1. On the basis of that, numerical simulations have been carried out on full - scale cube model with three types of parapets. the caparison of with and without parapets shows that three types of parapets can significantly reduce high negative suction peaks on zones susceptible to wind pressure. formulas have been proposed about the height of those parapets

    在此基礎上對方塊模型屋面分別設置3種女兒墻進行了數模擬,與未設置女兒墻的模擬結果進行了比較分析,結果表明上述女兒墻都能較明顯地降低屋面風壓敏感區的,並給出了相應的女兒墻高度限公式。
  2. Finally, with caparisons of that three parapets properties cantilevered parapets has been adopt to the steel structure of light - weight buildings with gabled frames, numerical simulations have been carried out with that buildings, results of simulations show that device can also significantly reduce the area - averaged coefficient of wind pressure and high negative suction peaks on zones susceptible to wind pressure. formula has been proposed about the height of that parapet

    最後通過三種女兒墻的性能比較確定對門式剛架設置懸挑女兒墻進行數模擬,結果同樣表明懸挑女兒墻能明顯地降低門式剛架屋面風荷載敏感區的及屋面風荷載體型系數,並給出了女兒墻高度限公式。
  3. The ratio of the average power loss to the power loss under peak loading

    平均能量衰減與荷時能量衰減的比
  4. This metric can help you calculate how many clients your server can handle under a peak load

    這個度量指標可以幫助你計算在載下,服務器能夠接受多少客戶。
  5. These pockets were characterized sometimes by low usage, but occasionally by a lack of sufficient resources to handle the peak load

    這些資源的特性是有時使用率很低,但偶爾會因為資源不足而被用來處理一些載。
  6. When the governing valve was series - connected on the return oil - line in the metering - out control system, under the same flow area and the same adjusted pressure of relief valve, with the incremental quantity of step load, the pressure highly - adjusted capacity of the hydraulic cylinder chamber with piston - rod increased, meanwhile, it ' s time of rise, time to peak and the governing time all increased. at the same time, the pressure highly - adjusted capacity of the hydraulic cylinder chamber without piston - rod increased

    當出口節流調速系統的回油路上串接調速閥時,隨階躍載的增加,在相同流量閥開度、相同溢流閥調節壓力的情況下,液壓缸有桿腔壓力p _ 2 ( t )的超調量是增加的,上升時間、時間以及調整時間也是增加的;液壓缸無桿腔壓力p _ 1 ( t )的超調量是增加的。
  7. On base of results above, composite model of ssta in pacific and circulation anomaly are constructed for analysis their evolution. during mature phase of el nino usually in winter, positive ssta dominates in tropical eastern ocean and negative ssta dominates in west wind drift district in mid - latitude ocean, correspondingly the pna index of 500 hpa geopotential height is positive which means the aleutian low gets strong, and the situation is somewhat inversely during la nina phase of ssta

    合成位相反映了太平洋ssta演變特徵,以及相對應的大氣環流異常特徵:當西風漂流區處于暖態而熱帶中東太平洋海溫偏低時,合成大氣模型當中阿留申低壓減弱, 500hpapna指數為異常;當西風漂流區處于冷態,熱帶中東太平洋處于暖態( elnino?成熟期ssta典型分佈) ,合成大氣模型中阿留申低壓加強, 500hpapna指數為正異常。
  8. Finally, the thesis introduces another model based on queue theory, which can reduce the peak load of repository effectively. multiple server policy is adopted in order to improve the performance

    最後,本文引入了一個基於排隊理論的證書撤銷模型,它能有效的降低存儲庫需要處理的荷,並且採用多服務員機制來優化系統的性能。
  9. Based on the detection principle of pyroelectric sensing elements, this paper presents a symmetrical peak detection method of continuous double plus - minus pulse signals to eliminate external interference in fixed position heat source

    根據熱釋電敏感元件的探測原理,本文提出一種對正脈沖信號和連續正脈沖信號進行對稱檢測的方法。
  10. A modified svm model, which can predict peak recognition theory, was proposed in this paper. this model can increase the weight of peak error in the loss function of structural risk minimization, thus improve prediction accuracy of hourly water demand peak

    本文提出一種能夠進行識別的改進svm演算法,該演算法在結構風險最小化準則的目標函數中加大誤差的權重,從而提高時用水的預測精度。
  11. Moreover, it showed that the linearity rising relations were existed between the laser power and the thickness of hardening layer, and the linearity negative rising relations between the scanning velocity and peak rigidity

    此外,結果還表明激光功率與淬硬層厚度成線性增長,而掃描速度與硬度成線性增長關系。
  12. Based on the analysis about the test requirements and the saturated magnetization of the armor plate, the excitation magnetic circuit satisfying the testing condition and a validation system are designed. because the geometric, of the magnetic leakage at the direction of the normal of the roundness fault has the feature of two peaks : a positive and a negative, using the linear regression and the software matlab, two regression equation are proposed : one is about the peak value of the magnetic leakage and the diameter and depth of the roundness fault ; the other is the distance between the two peaks and the diameter of the roundness fault. the result of the validation system proves that the two equations are valid, and an applied method using for quantificationally inspecting the roundness faults is proposed according to the two equations

    根據實驗要求,通過對鋼板達到飽和磁化的必要性進行的分析,設計了符合試驗條件的勵磁磁路,並設計了一套實驗驗證系統;根據圓形缺陷法線分量漏磁場幾何圖形正的特點,採用線性回歸擬合的原理和matlab軟體及其統計工具箱中的相關函數,給出了圓形缺陷漏磁場幾何圖形的與圓形缺陷的直徑和深度以及間距與圓形缺陷直徑的兩個回歸擬合方程,並通過實驗驗證系統驗證了擬合方程的正確性,利用這兩個簡單實用的擬合方程,提出了一種工程定量檢測圓形缺陷的應用方案。
  13. Green - mode which provides off - time modulation to linearly decrease the working frequency under light - load conditions and power limiting which will turn off the transistor when peak current of inductor reaches the threshold current

    同時該電路集成了能在輕載情況下自動降低頻率的綠色模式以及能在電感電流過高時關斷調整管的功率限制模塊,降低了系統的功耗。
  14. As the ratio of peak samples to total training samples is low, the prediction accuracy of peak load is poor when applying support vector machine ( svm ) model to predict a periodical load

    在應用svm模型于具有周期性荷的預測時,由於在訓練樣本中或谷樣本所佔比例很少,從而導致荷載預測精度不高。
  15. The result follows : ( 1 ) cg lightning in common thunderstorm with weak convective intensity is active at the developing and mature stages, the negative flash rate begins to decline gradually afterwards. the cg flashes in all lifetime are almost of negative polarity and very rarely positive polarity

    分析結果表明:對流強度弱的普通雷暴在發展階段和成熟階段地閃比較活躍,在成熟之前出現地閃頻數的,隨后地閃頻數逐漸減小,整個生命史中幾乎全為地閃,極少出現正地閃。
  16. At the conditions with the same fuel injection quantity per cycle and the same engine speed, with the increase of the additive mass fraction in the fuel, the ignition and heat release timings brought forward, the peak of heat release rate increased and the operating range at low engine load was enlarged obviously. however, excessive additives will make the engine be prone to knock, run rudely and shorten the operating range at high engine load

    在相同循環噴油量和相同轉速的條件下,隨著添加劑質量分數的增加, hcci著火和燃燒放熱提前,燃燒放熱提高,低荷工況范圍明顯拓寬,但過高的添加劑質量分數會使得發動機爆震,工作粗暴,導致高荷工況變窄。
  17. We propose a combined slf method to extrapolate feeder load growth by using feeder ' s history peak value and the merits of gray theory and genetic programming ( gp ). at first, we adopt load transfer coupling method to correct load history and its error for load transfer. secondly, we get the real power - supply area by using layer overlap analysis, based on practical feeder path and distribution gis map layer

    將gis的空間信息分析功能應用於配網空間荷預測的研究:綜合利用灰色理論及遺傳規劃( geneticprogramming , gp )的優點,提出了一種根據饋線的歷史荷進行外推的組合slf法:首先採用荷耦合回歸法來修正荷歷史,消除由於荷轉移引起的誤差;然後根據實際饋線路徑和配網gis圖形分層,運用圖層疊加分析得到饋線的實際供電范圍;接著採用灰色關聯度聚類方法對饋線荷增長曲線進行聚類分析;最後採用gp來對灰色聚類結果進行符號回歸,分別得到每一類曲線的最佳擬合曲線形式。
  18. According to heat load source of die cavity, temperature distribution gradient equations and heat flux equations and the peak value equations of temperature load at die cavity surface have been obtained with research of temperature distribution and transfer laws of die surface by unsteady heat transfer theory

    摘要根據鍛模型腔熱荷來源,通過非穩態傳熱理論,分析研究了模具工作表面層的溫度分佈與傳遞規律,給出了型腔表面溫度分佈梯度和熱流密度公式,並給出了鍛模型腔表面的溫度的計算公式。
  19. Only when the concrete strength comes to the peak value, the strain will reduce with the decrease of the temperature

    混凝土應力達到時的應變隨的增大而變小。
  20. A system administrator needs to consider the characteristics of applications, network, and peak workloads to determine whether an acceptable period of time exists beyond which the likelihood of an incorrectly diagnosed server failure is considered acceptably small

    系統管理器需要考慮應用程序的特徵、網路、工作來確定除了不正確的服務器故障診斷的可能性較小的情況下,是否存在合適的時段。
分享友人