質量檢查文件 的英文怎麼說

中文拼音 [zhíliángjiǎnzhāwénjiàn]
質量檢查文件 英文
audit record
  • : Ⅰ名詞1 (性質; 本質) nature; character; essence 2 (質量) quality 3 (物質) matter; substance;...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : Ⅰ動詞1 (查) check up; inspect; examine 2 (約束; 檢點) restrain oneself; be careful in one s c...
  • : 查名詞1. [植物學] (山查) hawthorn; haw2. (姓氏) a surname
  • : Ⅰ名詞1 (字) character; script; writing 2 (文字) language 3 (文章) literary composition; wri...
  • : Ⅰ量詞(用於個體事物) piece; article; item Ⅱ名詞1. (指可以一一計算的事物) 2. (文件) letter; correspondence; paper; document
  • 質量 : 1 [物理學] mass 2 (產品或工作的優劣程度) quality 3 economy (離子源的); 質量標準 quality level...
  • 檢查 : 1 (用心查看) check up; inspect; examine; censor; survey rummage; review; jerque; docimasia 2 (...
  • 文件 : 1 (公文、信件等) document; file; papers; instrument 2 [自動化] file; 文件保護 file protection; ...
  1. At fixed time intervals, the gts data are decoded by the hko main computer and quality control checks are applied. objective analyses are then carried out for data at various standard pressure levels to produce grid point values. charts showing flight level winds, temperatures and other information are made available at the airport meteorological office ( amo ) for the provision of flight documentation and airway winds

    臺的主電腦定時對接收到的資料進行譯碼及控制,跟著對各個標準氣壓層面的資料進行客觀分析,計出各網格點的數值,從而製作各巡航高度的風、溫度及其他資料的天氣圖,讓機場氣象所用來編制飛行氣象和航道風。
  2. At fixed time intervals, the gts data are decoded by the hko main computer and quality control checks are applied. objective analyses are then carried out for data at various standard pressure levels to produce grid point values. charts showing flight level winds, temperatures and other information are made available at the airport meteorological office for the provision of flight documentation and airway winds

    臺的主電腦定時對接收到的資料進行譯碼及控制,跟著對各個標準氣壓層面的資料進行客觀分析,計出各網格點的數值,從而製作各巡航高度的風溫度及其他資料的天氣圖,讓機場氣象所用來編制飛行氣象和航道風。
  3. Fisrt, this paper dissertates the necessities and feasibilities for establishing and implementing ims theoretically. second, it resreachs the problems in the process of establishing and implementing ims, and list the planning and designing moughtway for 5th engineering corporation of china railway 20 bureau group. meanwhile, it provides some suggestions for key steps of establishing and implementing an ims. for example, orgnazational improment, training implementation, initial review, development of managerial principal and goals, and compilation of procedural documents. after that, this paper designs a set of evaluation indicators on the basis of pdca., and put forwards evaluation method and process for the effectiveness of an ims. last, it also makes some concrete proposals vs possible difficulties in the process of performimg an integrated management system, for the continual improvement of the corporation ' s ims

    首先從理論上分析了建立與實施一體化管理體系的必要性和可行性;其次,對中鐵二十局集團五公司、環境和職業健康安全一體化管理體系的建立與實施問題進行了研究,給出了該公司建立與實施一體化管理體系的策劃和設計思路,同時就建立與實施過程中的重點問題進行了研究,如組織機構的優化、貫標培訓的實施、初始評審的實施、管理方針的確定、管理目標的設定以及程序的編制等;然後,設計了基於pdca (策劃、實施、、處置)模式的一體化管理體系有效性評價指標體系,給出對五公司一體化管理體系有效性進行評價的方法和過程;最後,分析了一體化管理體系運行過程中可能遇到的問題,並給出中鐵二十局集團五公司一體化管理體系持續運行的具體建議。
  4. In view of existing situation, author of the paper investigates the problems lie in building quality and choose concrete cantilever with a damage as typical example which is detected by damage indices through digital simulation

    針對建築結構測的現狀,認真調了建築中存在的問題,選取混凝土懸臂梁作為典型構,利用現有的損傷信息特徵對結構損傷診斷進行了計算機模擬。
  5. To ensure the completeness of the quality documents about process inspectionand to file it

    確保過程的完整性,負責的歸檔工作。
  6. Based on the technical parameters, quality matter and character of polymeric materials and its products, the statistical method such as orthogonal array design, pareto diagram, histogram, significance testing, fuzzy mathematics have been used to carry out a series of study. by doing so, the inherence relationship and variance property, degree and reason of polymeric materials and its products have been obtained ; it could get better improved by adopting correcting measure

    本論以高分子材料及其製的工藝參數、問題和特徵值為研究對象,利用正交實驗設計、調表、因果圖、排列圖、直方圖、控制圖、故障樹( fta ) 、顯著性驗、相關分析以及模糊數學評定法等多種統計技術方法,從不同角度進行了一系列探索性研究,得到了高分子材料及其製內在關系及變異的性、程度和原因,採取了糾正措施並取得了較好的效果。
  7. Abstract : in the process of establishing information systam of urban planning and survey, the control measure of data quality, which combines the picture with data file, are applied, and therefore data basis of survey information is ensured to be correct, true and high - efficient

    摘:在建立「廣州市城市勘測信息系統」的過程中,採取了圖面對照和數據相結合的數據控制措施,從而保證了該系統具有一個正確、可靠、高效的勘測信息數據基礎。
  8. Thirdly, by the method of questionnaire and quality control tools, the buying and selling process quality control proposal is given in this article, thereby, the analytical methods of quality control including the acceptance criterion of wheat, the process capacity of supply and customer satisfaction indexes evaluation are discussed in this article. fourthly, based on the methods of statistical process control, this article evaluate the factor that have a impact on the process of the stored grain with qualitative analysis and quantitative analysis, and bring forward the design proposal of controlling temperature for stored grain in warehouse. at last, in order to bring the optimization design for quality management system into effect and advance the enterprise in overall management, the article table a proposal including strengthening the training of quality management, introducing iso9000 standard into quality management, bringing about the grain industrialization, standardizing quality inspection criterion, developing the computer auxiliary control system

    首先依照iso9001標準,藉助于設計的專家調表通過專家調,對該糧庫的管理體系現狀進行詳細分析,確定出管理體系、資源管理、產品實現過程、控制和改進五個方面存在的主要問題;其次運用系統方法建立了糧庫管理體系完善程序及管理體系的三維空間結構模型,並在此基礎上優化設計出了管理體系內部審核、不合格控制、糾正和預防措施等改進實施方案;再次,運用調表法和管理控制工具對該糧庫的糧食輪換過程的控制進行了優化設計,確定出糧食采購標準、供應過程能力分析以及顧客滿意度評價等分析方案;然後,運用統計過程分析方法對糧食倉儲過程的影響因素及其原因進行定性和定分析評價,確定出倉儲過程控制的優化方案;最後,為確保設計方案的有效實施,從糧庫加強管理培訓、導入iso9000族標準、糧食產業化開發、規范糧食驗標準、開發計算機輔助控制系統五個方面提出具體實施建議,以便提高其整體管理水平。
  9. The research paper is based on the the latest softwares of the managing inventory, its research subject is about simulating the most appropriate inventory quantity and ordering quantity by statisticing the probability of the random require quantity. its purpose is to provide the relied basement for determining the most appropriate inventory quantity and ordering quantity, the deterring policy quality will be raised, so the damage caused by unfit inventory quantity and the benefit of the entrerpreneur will be raised. the research method is by building the inventory management information system, the system includes automated management of parts entering and going out the datasbase. requesting the records of parts entering and going out the datasbase and displaying the sygonal when the inventory quantity is short out. computer calculating the fix period remaining, requesting remaining at any time and displaying if goods need ordering, all the partsof certain a product going out of basement and at the same time checking if the storaging quantity is enough. then simulating the most appropriate inventory quantity and ordering quantity simulating method is as follows : statisticing the random required quantity. calculating the probability, standing for the values with data range producing random data by function accordingly calculating the random required quantity. thenext step is simulating all the projects after pressing in the simulating conditions. finally selecting the best

    通過分析國內外關于庫存管理軟體的發展情況,提出在線統計貨物出庫情況的基礎上利用模擬方法確定最優存儲方案,其目的是為制定合理的貨物安全庫存和訂貨提供可靠的依據,提高企業管理人員的決策,從而減小資金的佔用和缺貨損失,提高企業的經濟效益。通過研製庫存管理信息系統使庫存信息管理自動化,也就是實現貨物入出庫管理計算機管理、自動詢貨物入出庫情況並在缺貨時給予提示、使用計算機貨物余額定期結算、貨物余額實時詢並顯示是否需要訂貨、裝配出庫管理使得只要輸入需要裝配產品代號和數,組成它的所有零就會自動庫和出庫。然後對安全庫存和訂貨進行模擬,模擬方法是首先自動統計貨物在過去某一段時間內的需求,計算出概率,用隨機數的范圍表示其概率數值的大小,利用隨機函數產生隨機數、從而間接的產生隨機需求,給定模擬天數和其他模擬條模擬各種方案,從眾多的存儲方案中找出最優存儲方案。
  10. Conduct quality & dimensional check of all finished parts. furnish report and up - keep in designated computer drive

    對已經完成的工進行和尺寸。完成驗收報告並存入電腦指定的夾。
  11. Therefore, this thesis first introduces the relevant regulations and requirements of the quality system, describes the self - audit system and the requirements for the overall repair process of aircraft parts, which includes preliminary inspection, acceptance, repair and release procedure

    因此,本論首先介紹了航空電子維修站體系對這些方面的規定及要求,並描述了航空電子維修站的自我審核系統的情況,以及飛機部從進廠、接收、修理直到放行的全部修理過程的要求。
  12. Audit subcontractor quality system / program, including installation / inspection / testing procedures and records, engineering document control, and non - conformance tracking and resolution

    分包商的控製程序,包括安裝/驗/測試步驟和記錄,規劃管理及不合格追蹤和解決問題
  13. Audit subcontractor quality control program, including installation / inspection / testing procedures and records, engineering document control, and non - conformance tracking and resolution

    分包商的控製程序,包括安裝/驗/測試步驟和記錄,規劃管理及不合格追蹤和解決問題
  14. Audit subcontractor quality system / program , including installation / inspection / testing procedures and records , engineering document control , and non - conformance tracking and resolution

    分包商的控製程序,包括安裝/驗/測試步驟和記錄,規劃管理及不合格追蹤和解決問題
分享友人