起導間隙 的英文怎麼說

中文拼音 [dǎojiān]
起導間隙 英文
starter gap
  • : 起Ⅰ動詞1 (站起; 坐起) rise; get up; stand up 2 (取出; 取走) draw out; remove; extract; pull 3...
  • : 動詞1. (引導) lead; guide 2. (傳導) transmit; conduct 3. (開導) instruct; teach; give guidance to
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • : 名詞1 (縫隙; 裂縫) crack; chink; crevice 2 (空閑) gap; interval 3 (漏洞; 機會) loophole; op...
  • 間隙 : (空隙) interval; gap; freedom; space; [機械工程] clearance; separation; stricture; clear; inter...
  1. The longer the air gap is, the higher the inception voltage ; the inception voltage is lower with 2kv at wet ice than dry ice. while, there is not a distinct effect of water conductivity on the initiative voltage

    越長,暈電壓越高;濕冰情況下暈電壓比乾冰約低2kv ;而覆冰水電率對暈電壓沒有明顯的影響。
  2. By applying related theory of gas discharge and mathematical statistics, this paper more in - depth and systemic study the influence of the length of air gap, ice state, water conductivity and air pressure on the inception corona and pulse discharge characteristics, included the discharge frequency, discharge amplitude and time interval

    根據試驗結果,用氣體放電和數理統計方法,分析了覆冰水電率、冰的狀態(乾冰和濕冰) 、空氣長度、氣壓和施加電壓等參數的變化對模型的始放電電壓、脈沖放電特性、放電頻率、放電幅值和時隔等的影響。
  3. Abstract : the excess pore water pressure of saturated soft clay foundation caused by pile pushing is obvious. the method for calculating squeezing stress and excess pore pressure by elastic - plastic theory is deduced in this paper, and furthermore, the reasonable pile spacing by regarding the influence of both squeezing stress and excess water pressure is given

    文摘:飽和軟粘土地基沉樁過程中樁土擠壓所引的樁周土體超孔水壓力效應是非常顯的.本文從彈塑性理論出發推出沉樁過程中樁周土體擠壓應力及超孔水壓力的計算公式,給出了考慮擠壓應力和超孔水壓力影響因素的合理打樁距的確定方法
  4. Because the physical distance between ouns and olts in apon is different from each other, and the transmission distance will undergo dynamic changes as a result of the variation in environmental temperature and the aging of optoelectrical appliances, the differences in the uplink transmission delay will cause an overlay of the uplink time slots of onus, thus leading to the collision of different atm cell flows

    由於apon中各onu與olt之的物理距離各不相同,並且其傳輸距離也會由於環境溫度的變化和光電器件的老化等因素而發生動態的改變,引上行傳輸時延差異造成各onu的上行時重疊,從而致不同的atm信元流發生碰撞。
  5. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;支撐系統連接的變形、彈性變形、不均勻沉降以及環境溫差可致橫梁裂縫;索塔施工偏位會引的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
分享友人