超裂縫 的英文怎麼說

中文拼音 [chāolièféng]
超裂縫 英文
supercrevice
  • : Ⅰ動詞1 (越過; 高出) exceed; surpass; overtake 2 (在某個范圍以外; 不受限制) transcend; go beyo...
  • : 裂動詞[方言] (東西的兩部分向兩旁分開) open
  • : 縫名詞1. (接合處) seam 2. (縫隙) crack; crevice; fissure; slit
  • 裂縫 : 1. (裂開的縫兒) rent; rip; hiatus; tear; rift; crevice; crack; fissure 2. [地質學] fracture; rupture
  1. The expansion agents can only make up the shrinkage to some extent, and the compensation effects would be reduced when the retardener and fly - ash are used. the expansion agents are not panaceas to avoid the shrinkage cracking as expansion can also reduce the concrete soundness. under bad curing condition, the polypropylene fibrillated film fiber can improve concrete ' s anti - crarking property, while the nominal steels have very unobvious effects. to reduce the concrete shrinkage thus avoid the cracking, the former factors must all be taken into account in concrete proportion design to develop sound concrete

    研究結果表明,水泥的品種和用量是影響混凝土收縮值的主要因素之一,當混凝土中水泥用量過470kg / m ~ 3時,混凝土的收縮值過400 10 ~ ( - 6 ) ,在約束狀態下存在高開風險;採用細砂使混凝土單位用水量顯著提高,收縮值也大幅增加;優質粉煤灰總體上能抑制混凝土的收縮,以量方式摻入其抑制作用更加明顯,但粉煤灰混凝土早期的粘聚性較差,應注意養護,以免失水產生龜;早強減水劑和緩凝減水劑都會使混凝土收縮值增加;膨脹劑只能補償混凝土部分收縮,同時受緩凝劑和粉煤灰的抑制,而且膨脹使混凝土的體積安定性增加了不確定因素,膨脹劑不是解決混凝土收縮的良方。
  2. On the formation mechanism, the rills were mainly formed by the concentrated action of the runoff on dyke slope, while the formation of socket mainly depended on surface runoff, subsurface flow and the existing defects within the dykes such as crack, mouse hole, fox and brocks dens

    在成因上,前者主要是降雨形成滲地面徑流的集中對戧坡的侵蝕作用而形成;後者主要與坡面徑流、壤中流,以及土堤的薄弱點(如、鼠洞、狐1一灌洞等)有關。
  3. Under the upper pressures belt or minute super pressures of the upper triassic series and jurassic system interface formation, the fluid in the upper triassic series moved along stratum interface, fault and crack network thoroughfare, formed " secondary gas pool " in the jurassic system

    上三疊統和侏羅系界面形成的壓帶或微壓帶,使上三疊統氣藏流體在壓力差的作用下,沿斷層、地層界面和網路通道運移,在良好的侏羅系圈閉中形成「次生氣藏」 。
  4. According to the m1l - std - 883c standard of thermal cycle loading, the delamination propagation rates at the interface between chip and underfill were studied experimentally by using c - mode scanning acoustic microscope ( c - sam ) for two types of flip chip packages with different states of solder joint

    採用mil - std - 883c標準,通過溫度循環實驗,使用高頻聲顯微鏡( c - sam )無損檢測技術,測量了在不同焊點狀態下, b型和d型兩種實際倒裝焊封裝晶元與底充膠界面分層傳播速率。
  5. Overloaded trucks causes based layer to failure and promote in turn the nucleation, propagation and development of refraction cracks in surface layers

    同時載車輛可能引起基層底面開並由此引起面層的反射
  6. The mantid ear - - a single slit - - is sensitive to the ultrasonic " pings " emitted by hunting bats

    螳螂的耳朵只有一條,對于蝙蝠發出的聲波非常敏感。
  7. When the confined shrinkage value which resulted from the confined action of all above shrinkage exceed the ultimate tensile strain, cracks occur

    各種收縮變形疊加后,混凝土的限制收縮值過極限拉伸率導致的產生。
  8. Non linear static & dynamic finite element procedure is adopted for the true emulation of the four typical geologic profiles of the dam, and imitates to compute the each stage deformation and stress distribution from the dam fill to full water run and during the 7 degree seismic intensity, the article also imitates to compute the response to earthquake force, the excess vibration pore water pressure distribution and permanent deformation, predicting the occurrence possibility of the crac ^ plastic zone and earthquake liquefaction

    採用非線性靜、動力有限元分析程序對圍壩的4個典型剖面進行了靜、動力模擬模擬,模擬計算了壩體自填築至蓄水運行和發生7地震各階段壩體及壩基的變形以及應力分佈,地震應力響應和地震引起的靜振動孔隙水壓力分佈以及永久變形。判斷了壩體和壩基中出現、塑性區以及地震液化的可能性。
  9. This dissertation mainly has a research on the control of temperature stress and temperature strain in super thick mass concrete planceer of high - rise building. because the cracks of super thick mass concrete planceer of high - rise building is mainly caused by temperature stress and temperature strain, we have an emphasis research at the change of the temperature stress of super thick mass concrete planceer, study the construction technique how to prevent mass concrete planceer from appearing the crack ' s, and provide a viable fulfillment experience

    本文以高層建築厚底板大體積和混凝土結構施工中的溫度應力和溫度變形控制為研究對象,針對高層建築厚底板產生的主要原因是溫度應力和溫度變形這一特點,重點研究底板大體積混凝土溫度應力產生和變化的機理,探討防止底板大體積混凝土出現的施工技術,提供切實可行的實踐經驗。
  10. On the basic of former research men ' s experience, 18 experimental members ( including 9 simple beams and 9 restrained beams ) are designed and tested. in the experiment, phenomena are observed and record by taking photos in the whole process from the first crack appears to test members crash completely, experimental data is attained including load values of crack - appear load, critical load and terminal load, stress values of reinforcing steel bar stress, compressed concrete stress and beam flank stress and values of deflection etc. by analyzing the crack ' s appearing and developing form and stress values of concrete and steel bars, the crash modes of test beams are defined ; shearing force - deflection curves are contrasted and analyzed ; the effects on shear strength of the three factors as shear span ratio, concrete strength and restraining moment are also analyzed

    借鑒已有試驗的經驗,本文設計和完成了對18根高強混凝土無腹筋梁(包括9根簡支梁和9根約束梁)在集中荷載下抗剪強度的試驗,觀察了試件從出現到完全破壞失去承載能力全過程的試驗現象並通過拍照進行記錄,獲得了試件的斜出現荷載、臨界斜荷載和極限荷載等荷載值和縱筋應變、混凝土受壓應變和梁側混凝土應變等應變值以及撓度值等。
  11. Ground subsidence, rebound deformation and horizontal deflection were measured, displacements inside the excavated slope were monitored and ground cracks and failure modes caused by extra excavation were investigated

    測試內容包括土體位移、地表沉降、基底隆起、地面挖引起的破壞形態。
  12. The next this text is based on the appearance theories, according to the characteristics that the temperature dispersion of super thick mass concrete planceer of high - rise building primarily is an even difference in temperature and an even constringency, suppose the level shears are line with the displacement, adopting a big physical volume concrete of planceer in flexibility foundation for plank computing model, from theoretically deducing the difference in temperature of mass concrete contracting should basic formula of dint, and analysis the crack rule and the influence factor of mass concrete temperature contract, and bringing up the theory calculation method about temperature stress of mass concrete and the biggest whole method that sprinkle the length, at the same time according to basic formula of the temperature stress of mass concrete and the concrete construction experience, bringing five technique measures to prevent the temperature crack of mass concrete

    其次本文以唯象理論為基礎,根據高層建築厚底板大體積混凝土承受的溫差主要是均勻溫差和均勻收縮的特點,闡述了大體積混凝土溫度應力理論計算的簡化方法和最大整澆長度的計算方法,同時根據大體積混凝土溫度收縮應力基本公式和大體積混凝土結構施工經驗,提出了防止大體積混凝土溫度的五項技術措施。最後本文以廈門郵電大廈3 . 5m厚底板施工為實例,從大體積混凝土溫度應力計算、混凝土保溫材料厚度計算、混凝土配合比的確定,鋼筋工程、模板工程、混凝土的泵送和澆築以及大體積混凝土內部溫度的監測和後期養護等方面進行了理論應用。
  13. The space agency said sunday a gouge in the heat shield protecting the shuttle is deeper than expected, raising the possibility that astronauts may try to repair the damage while still in orbit

    航空航天局星期天說,奮進號航天飛機防護隔熱瓦上的深度過早先的估計,因此可能需要宇航員在航天飛機仍然在太空軌道上飛行時修補損傷。
  14. For the high pressure phase equilibrium system composed of co2, h2o, cacl2, etc., co2 is treated as super critical fluid truly, the volume of which is estimated by bwr state equation suitable for super critical fluid

    考慮了酸液溶蝕的碳酸鹽以及酸巖反應生成的二氧化碳對人工體積的影響,針對內由二氧化碳、水、氯化鈣等物質組成的高壓相平衡體系,將二氧化碳真實地處理為臨界狀態,其體積由適用於臨界流體的bwr狀態方程求解。
  15. The study shows that the mud fracture in overpressure zone and lithologic reservoir should be the target domains for petroleum exploration

    研究認為,壓帶泥巖、巖性油氣藏將是令后的重要勘探領域。
  16. In the process of building and using the mass concrete structures, because of the effect of out - side condition and themselves, some faults will form in the structure, these faults will effect the bearing capability and endurance using nondestructive testing method to test the concrete ' s quality and diagnose its healthy, which has the significant sense in assessing the safety stability and research of the administering diseases this dissertation mostly researched the testing methods in the mass concrete structure, discussed the principles, methods, features, sphere of application of the ultrasonic testing in the mass concrete structure with faults, used dynamic fem to simulate the testing process, discussed when the concrete structure with cracks is under the effect of the pulse, how the elastic waves propagate and what are their changing feature, researched the principles of the first - arriving waves " phase when the cracks " depths are not same, obtained the relation between the inversion point and the cracks " depth, which has the direction sense in the application of projects, the second part of this dissertation is ct, which used the ultrasonic wave running through the tested - substance to get arriving - time of the ultrasonic wave, then inverse the image this dissertation drawed one ct program which can well present the different little cells " ultrasonic wave velocity profiles of the substance, thereby to diagnose the quality of the part of the tested - substance, ct has the better using foreground.

    在混凝土結構的施工及使用過程中,由於受其自身及外界各種因素的影響,常常會產生一些缺陷,對結構物的承載能力和耐久性造成嚴重影響,採用無損檢測技術進行質量檢測和健康診斷,這對混凝土結構開展安全、穩定性評估以及病害隱患治理研究具有重要意義。本論文主要針對大體積混凝土結構缺陷的檢測方法展開研究工作,重點討論了聲波法檢測混凝土結構的基本原理和方法及其特點、適用范圍,運用動力有限元數值模擬其檢測過程,探討了有缺陷的混凝土結構在脈沖荷載作用下彈性波的傳播及其變化特徵,研究了不同深度下首波相位變化規律,得出了反轉臨界點與深度之間的關系,這對實際工程應用具有指導意義。聲波ct是一種新的無損檢測技術,它是利用聲波穿透被檢測體獲取聲波接收時間,來進行計算機反演成像的技術。
  17. In the paper, through the example of the waiting hall of xt an international airport, several main questions meet in the design have been discussed, analyzed and solved, which include in negative friction force around pile in collapsible loess, the calculating method of bearing capacity of pile. the crack control methods of analysis and design in the super - length reinforced structure have been tested in the project, and reached the effect to be hoped

    本文通過西安咸陽國際機場新航站樓工程設計的具體實例,分析、論述了建築結構在設計中遇到並解決的幾個主要問題:如自重濕陷性黃土場地樁基負摩阻力問題;淺層土雖經強夯但下層土仍有可能產生負摩阻力時樁的承載力計算方法;對鋼筋混凝土結構的控制實現長設計的分析和設計對策,經過工程驗證,達到了預期的效果。
  18. ? rack occurs during the construction period of slrcp in lijiaxian hydropower station, which generate the study of slrcp construction period ; ? ccording to the survey of slrcp which runs for years, the crack width exceed the design width. so, the crack control is focused

    李家峽壩後背管在施工期就出現,由此引出鋼襯鋼筋混凝土壓力管道施工期性能研究問題;根據對運行多年的鋼襯鋼筋混凝土壓力管道實地勘察,發現管道的寬度均過當初設計寬度,由此引出控制問題。
  19. For example, the large friction loss of prestressed tendons, complex anchorage bearing joint, the problem of cracks in large area structure, axial compress of long span continuous beam under prestress. all those hinder its use in long span structure. until now days, the cognition about the behavior of such structure under loads is not enough for the realm of prestressed concrete of all the world

    但是,預應力技術應用於大跨連續框架結構,在設計和施工中還存在一些缺點和不足,例如預應力筋的摩擦損失過大,節點錨固區設計和構造復雜、大面積結構的控制問題、大跨框架梁在預應力作用下的軸向縮短等,這些都是困擾大跨預應力混凝土框架結構應用的突出問題,特別是目前對于預應力混凝土靜定結構的受力性能,國內外預應力界的認識尚不夠全面。
  20. This paper is taking model seismology theory as guidance, regards ultrasonic experimental method as major research means, and has made artificial crack and pore model according to physical model similar principle with various materials

    本文以模型地震學理論為指導,把聲波實驗方法作為主要的研究手段,根據物理模型相似性原理,用多種材料製作了人工模型和孔洞模型。
分享友人