軌道撐 的英文怎麼說

中文拼音 [guǐdàochēng]
軌道撐 英文
bunton
  • : Ⅰ名詞1. (路軌;軌道) rail; track 2. (比喻辦法、規矩、秩序等) rut; path; course Ⅱ動詞[書面語] (遵循; 依循) follow
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ動詞1 (抵住; 托住) prop up; support 2 (用篙使船行進) push or move with a pole 3 (支持) mai...
  • 軌道 : 1 (供火車、電車等行駛的由條形鋼材鋪成的路線) track; pathway; rail; runway; circle; railway 2 (...
  1. In this situation, our government and shipping companies have to develop new ideas, fully analyze what are our advantages and our disadvantages. knowing that out advantages is limited, we should make rules and laws and improve our ability in global economy competition. also we should let our shipping enterprises get into the benign developing way, join the global ocean shipping market and compete healthfully with other countries

    面對這種局面,我國政府和航運企業要有發展的新思路,充分分析利弊所在,了解自身優勢與不足,制定相應的法規與措施,興利除弊,使我國航運業盡快逐漸走上良性發展的上來,健康的參與到國際海運市場競爭中去,以承載和支我國蓬勃發展的國際貿易,從而提升我國在世界經濟中的競爭力。
  2. In the present, the models used widely are two kinds : the continuous model. the continuous model is supported by " smearing out " the discrete support along the track. giving a continuous viscoelastic foundation and a continuous layer represent sleepers

    目前所使用的計算模型主要分為兩種:一種為連續型模型:將沿方向的離散支連續化,將枕木模擬為剛體或為有均布質量和剛度的梁,使枕木成為粘彈性地基上的連續層。
  3. The crossbeam will support the rotating floor, the upright column and its moving while moving in the guide track

    橫梁既要支轉臺、立柱及其運動,又要沿橫向運動。
  4. 2. detailed introductions are given for the design scheme and engineering situations. 3. the construction design, construction scheme and construction technology of ballastless embedded sleeper track are researched in combining with the constructing of the ballastless track on shahe bridge inside b26 - 1 section on qin - shen railway. the design, application and construction measure for the adjustable up - supporting bracket for track panel are particularly described and expatiated

    結合秦沈客運專線b26 - 1標段內沙河無碴實際施工情況,對長枕埋入式無碴的總體施工安排、施工方案以及施工工藝進行了研究,同時重點對長枕埋入式無碴的上承式可調式排支托架的設計、使用和施工測量控制進行了細致地說明和闡述。
  5. We recognize our globe in open space, a spaceraft in orbit, no atlas and no turtles to support it

    我們發現我們的星球是在廣漠的宇宙之中,就像在上運動的飛行器一樣,沒有什麼擎天神和烏龜在支著它。
  6. The low cost track, which consists of the traditional wide - sleeper tack, ballast bed with rubber bits and the elastic packing material between sleepers, is a new type with three - dimensional elasitic support

    摘要介紹以傳統的寬枕框架、碎橡膠床、枕端無遮擋彈性定位和枕間彈性材料密封裝配成的,具有三維彈性支的碎橡膠
  7. When escape system is activated, the grille wings at the upper fairing will open, supporting frame will pick up the orbit and returning modules, the lock between the returning and propelling modules will release, the lock between the upper and lower fairings will release, escape rocket will be ignited and finally pull the escape flight vehicle away from the rocket

    該系統由逃逸塔和上部整流罩組成,逃逸系統加上飛船的艙和返回艙構成逃逸飛行器。當需要逃逸時,上部整流罩上的柵格翼打開,支機構夾住飛船艙和返回艙,然後返回艙與推進艙解鎖上下整流罩解鎖逃逸發動機點火,逃逸飛行器飛離運載火箭。
  8. Railway applications - track - concrete sleepers and bearers - part 2 : prestressed monoblock sleepers

    鐵路設施..混凝土枕和支架.第2部分:加預應力的單塊枕木
  9. Railway applications - track - concrete sleepers and bearers - part 5 : special elements

    鐵路設施..混凝土枕木和支架.第5部分:特殊構件
  10. Railway applications - track - concrete sleepers and bearers - part 1 : general requirements

    鐵路設施..混凝土枕木和支架.第1部分:一般要求
  11. Railway applications - track - concrete sleepers and bearers - part 3 : twinblock reinforced sleepers

    鐵路設施..混凝土枕木和支架.第3部分:加筋雙塊枕木
  12. Railway applications - track ; concrete sleepers and bearers - part 5 : special elements ; german version en 13230 - 5 : 2002

    鐵路設施..混凝土枕木和支架.第5部分:岔和交
  13. Railway applications - track ; concrete sleepers and bearers - part 1 : general requirements ; german version en 13230 - 1 : 2002

    鐵路設施..混凝土枕木和支架.第1部分:一般要求
  14. Railway applications - track ; concrete sleepers and bearers - part 3 : twinblock reinforced sleepers ; german version en 13230 - 3 : 2002

    鐵路設施..混凝土枕木和支架.第3部分:加筋雙塊
  15. Railway applications - track ; concrete sleepers and bearers - part 2 : prestressed monoblock sleepers ; german version en 13230 - 2 : 2002

    鐵路設施..混凝土枕木和支架.第2部分:預應力單
  16. Railway applications - track ; concrete sleepers and bearers - part 4 : prestressed bearers for switches and crossings ; german version en 13230 - 4 : 2002

    鐵路設施..混凝土枕木和支架.第4部分:岔和交
  17. In the dynamic system of track and interaction between the vehicle and track, it is convenient to consider six sub - systems : the vehicle, wheel / rail contact and representation of excitation, the rail, the fastening system, the sleeper, the sleeper support ( including ballast and substrate )

    及車輛與系統可以分為車輛、輪接觸面及其激振、、扣件系統、枕木及枕木支床)等六個子系統組成。
  18. The weight of the door is supported by the top track

    門的重量門頂上的著。
  19. Cranes - design calculation for rail wheels and associated trolley track supporting structure - general

    起重機.輪和相關觸輪滑結構的設計計算.總則
  20. Cranes - design calculation for rail wheels and associated trolley track supporting structure - part 1 : general

    起重機.輪和相關觸輪滑結構的設計計算.第1部分:總則
分享友人