轉換時間 的英文怎麼說

中文拼音 [zhuǎnhuànshíjiān]
轉換時間 英文
change over time
  • : 轉構詞成分。
  • : 動詞1. (給人東西同時從他那裡取得別的東西) exchange; barter; trade 2. (變換; 更換) change 3. (兌換) exchange; cash
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • 轉換 : change; transform; convert; switch
  • 時間 : time; hour; 北京時間十九點整19 hours beijing time; 上課時間school hours; 時間與空間 time and spac...
  1. In xenopus embryonic extracts camp concentration and pka activity also oscillations accompany with the cell cycle, low in mitosis and increased during m / g1 transition, keep high until next mitosis, and the mechanism concern with the cdc25 phosphorylation state and cyclin b concentration. mouse fertilized egg is the most simple and natural model for cell cycle that near to human, but little is know about pka on mpf also pka on mitosis

    通過對非洲爪贍胚胎細胞周期的研究發現jka活性也隨細胞周期變化而波動,在m期出現pka活性下降,而mpka活性達最大值,一直維持高值直到下一個m期出現,其對mpf活性調節與cdc25磷酸化狀態及周期素b表達有關。
  2. Non - preemptive priority queueing models with changeover times and switching threshold

    帶有轉換時間和閾值的非搶占優先權排隊模型
  3. Therefore, in order to narrow regional gap, boost minority regions development, china, whose market growth is in a premature stage, market mechanism is not perfect, and is in a transitional period of new and old system, must refer to developed countries " successful experiences according to the principle of scientific and reasonable, standard, fair and open, combination of unified system and inclined pol

    因此,對於市場發育程度比較低、市場機制不健全,尤其是處于新舊體制期的中國來說,為縮小地區的差距,加快民族地區的發展,必須借鑒發達國家的成功經驗,按照科學合理、規范公正透明、統一體制與傾斜照顧相結合以及扶持與激勵相兼容的原則,進行詳細的制度設計,建立規范的對民族地區財政移支付制度的基本框架和保障措施,以保證宏觀經濟政策的有效性。
  4. Field of view min switch time

    不同視場角轉換時間
  5. Command - line switch to generate the order property automatically

    元素的內容之進行的順序。
  6. Exception is thrown when a failure occurs during an explicit reference conversion

    當在顯式引用發生失敗,會引發
  7. The intrinsic carrier concentration reduces when decreasing the v / iii ratio. the high quality of in0. 53gao. 47as can be obtained at the range of 10 - 30 seconds of exchange time between ashs and phs. when the thickness of the buffer layer between the inp substrate and ingaas epilayer is 0. 2 um the mobility becomes the maximum and the carrier concentration is the lowest

    /比對外延層的表面形貌有較大影響,增大/比有利於提高材料的結晶質量;隨著/比增加,遷移率升高;本徵載流子濃度隨著/比減少而降低; ash _ 3和ph _ 3轉換時間在10秒到30秒之可以獲得質量較好的ingaas外延層;在inp緩沖層厚度為0 . 2 m遷移率達到最大,載流子濃度達到最低。
  8. A system power status notification can occur when a weak or charging power source is detected, or when a transition from ac or battery power source occurs

    事件。會在以下情形下出現系統電源狀態通知:當系統檢測到電源不足或正在充電,或者當交流電源和直流電源之相互
  9. Interlace to progressive conversion is accomplished by means of " space for time ". double frequency designed may upgrade the sytem and meet the need of slltv research in future

    利用「空」的新方法,將視頻信號進行隔行到逐行的。同為了可以升級系統,滿足后續研究的需要,設計了倍頻功能。
  10. This type of converter is usually quit linear and converters up to 20 bits can be obtained, but the conversion time is relatively long

    這種器通常線性度很好,精度達到20位,但是轉換時間相對比較長。
  11. You can use mdas to isolate hard - to - find application bugs that occur when transitioning between managed and unmanaged code

    可以使用mda隔離在託管代碼和非託管代碼之發生的難以發現的應用程序bug 。
  12. I o switching transitioni o

    介面轉換時間
  13. It also introduces the producer ' s system of sbeg. analyses the production process and makes a proposal to improve it. according to the reality of sbeg, on principle of lean thinking, it designs some projects in order to put lp in practice, especially how to ameliorate the equipments of abrade to realize continuous process ; it also analyses operation change approaches in detail in order to offer some suggestions to shorten the operation change time and it brings forward maintenance methods fitting the continuous process, especially the use of statistics in forecasting maintenance

    根據sbeg的實際情況,基於精益思想的原則,設計了精益生產方式實施的具體方案:為了實現屏生產線生產連續流程,根據sbeg的具體情況,設計了屏后加工設備改造的方案,並對不同品種產品所需后加工各工序設備數,以及對應的節拍進行了計算;針對目前錐成型作業轉換時間長的狀況,分析了作業的詳細步驟,提出了縮短作業轉換時間的具體方法;設計了全面設備維修方案,以保證連續流程的正常進行,並將數理統計方法應用到制定預測性維修方案中。
  14. Total conversion time

    全部轉換時間
  15. The essential requirements for the frequency synthesizer are : 1 ). low side band power 2 ). high hopping speed 3 ). short convergence time direct digital synthesis technology has the advantages of low cost, low power consumption, high frequency discrimination and short switching time

    直接數字合成技術dds具有低成本、低功耗、高解析度和快速轉換時間等優點,是實現快速跳頻的一個關鍵技術。本文討論了如何實現高速的跳頻系統。
  16. Reasonable selection of a / d and cpu is very important for sharply shortening the period of sampling and holding, a / d conversion, data transmissions, and final calculation

    通過合理選配a / d 、 cpu等參數減少採樣保持、 a / d轉換時間、數據傳輸與cpu計算等組成的數據過程的總延,保證了系統的精確度。
  17. Pneumatic fluid power - directional control valves - measurement of shifting time

    氣壓液動.方向控制閥門.轉換時間的測量
  18. Smith ( 1976 ) suggested that the division of labor can improve the productivity in three ways : first, improve the workers " skill ( human capital accumulation ) ; second, saving the workers shifting time from one job to another ; finally, promoting the machines invention ( material capital accumulation )

    Smith ( 1976 )指出了勞動分工提高生產率的三條途徑: ( 1 )提高勞動者的熟練程度(人力資本積累) ; ( 2 )節約勞動者在不同工作之轉換時間; ( 3 )利於「簡化和節約勞動的機械」的發明(物質資本積累) 。
  19. Therefore, if throughput and minimizing memory utilization are important non - functional requirements for the application, then consider using a message format that minimizes the amount of parsing time, datatype transformation time, and dynamic memory allocation time

    因此,如果對于應用程序來說吞吐量和最小內存佔用是重要的非功能性需求,就要考慮使用能夠減少解析、數據類型轉換時間和動態內存分配的消息格式。
  20. With the application of phase detector in industrial experiment on the spot, when the phase of working frequency power supply is consistent with the output phase of variable frequency power supply, plc sends out the instruction to switch off the output of transducer. the electromotor is connected with the industrial frequency voltage after it was disconnected from the out

    在現場工業試驗引入鑒頻鑒相控制器,在工頻電源和變頻輸出電源相位一致, plc發出指令切斷變頻器輸出,電機從變頻器輸出端斷開后,馬上接入工頻電源,轉換時間控制在幾十毫秒之內。
分享友人