速率控制時間 的英文怎麼說

中文拼音 [kòngzhìshíjiān]
速率控制時間 英文
rate time
  • : Ⅰ形容詞(迅速; 快) fast; rapid; quick; speedy Ⅱ名詞1 (速度) speed; velocity 2 (姓氏) a surna...
  • : 率名詞(比值) rate; ratio; proportion
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • 速率 : speed; rate; tempo
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  • 時間 : time; hour; 北京時間十九點整19 hours beijing time; 上課時間school hours; 時間與空間 time and spac...
  1. The experiment results indicated that by application of new control strategy, the charging efficiency was raised to about 90 %, the charging period was reduced to within 2 hours, and there was no apparent electrolyte temperature - rise, which means high efficiency, fast and damage - free charge is realized

    實驗表明,採用新型策略的充電過程可使充電效提高到90左右,充電縮短到2小以內,蓄電池電解液的溫升較之常規充電亦沒有明顯升高,實現了高效、快、無損的充電思想。
  2. Some main results of testing research were as fellows : i. in the course of testing of leaching zinc dross, leaching zinc dross by sulfuric acid was researched and the effects on the leaching rate of the zinc dross were analyzed by author, the optimum conditions of leaching testing of zinc dross were determined as fellows : liquid - solid ratio 6 : 1, stirring ratio 250r / min, granularity 120 mesh, the soaking time 5h, the concentration of sulfuric acid of 30 %, and under these conditions, the rate of leaching zinc is above 92. 0 %. ii. in the course of testing of purification, on the basis of comprehending and comparing all present methods of the manganese - removal and iron - removal, the oxidizing method of manganese - removal in zinc sulfate solution using ammonium persulfate was put forward and the oxidizing method of iron - removal in zinc sulfate solution using the goethite process and oxidation - hydrolysis process was adopted

    研究的主要結果具體如下: 1 、研究了硫酸浸出鋅浮渣並分析了影響浸出的各種因素,確定了浸出鋅浮渣的最佳條件為:液固比為6 : 1 ,攪拌度為250r min ,粒度為- 120目,酸浸為5 . 0h ,硫酸濃度30 ,鋅浮渣的浸出大於92 . 0 ; 2 、在綜合和比較了目前除錳和除鐵的各種方法基礎上,提出了過硫酸銨氧化除錳方法和選擇了針鐵礦-氧化水解聯合法除鐵方法,並分析和討論了影響除錳和除鐵等各種因素,確定了除錳的條件為:溫度90 , ph值5 . 4 ,反應3h ,過硫酸銨達到理論值的1 . 2倍,除錳超過99 . 86 ;聯合法除鐵的條件為:氧化反應1 . 5小、溫度在90 92 、 ph值5 . 2 5
  3. Finally, the paper gives an example of the system used in the automatically spinning control system in the machine. many essential parameters were tested, which includes communication speed, the percentage of errorness or lost packet, and the response time etc. all prove that the system has very good performance and great value in application

    測試表明系統具有極好的性能,能夠在100米左右的范圍內掛接100個以上的節點並以500kbps的通信,系統響應小於lins ,出錯和丟包均低於萬分之一,囚此該系統在工業自動化中具有很大的應用價值。
  4. The first facet is to put forward four - step block matching algorithm which can deduce the time of motion estimation and improve the coding efficiency, based on the traditional motion estimation algorithms. the second facet is to propose a new rate control algorithm, that is average - reaction rate control algorithm, based on the rate control of mpeg2. the new rate control algorithm can achieve rapid and efficient adaptive coding

    首先在對傳統的運動估計演算法進行研究和改進的基礎上,提出了四步搜索塊匹配的運動估計演算法,減少了運動估計的,提高了編碼效;其次在分析mpeg2比特的基礎上,提出了一種新的比特演算法? ?平均響應比特演算法,該演算法能夠快有效的實現自適應編碼。
  5. The approximate computation method is used in float point computation of system ' s control algorithms on fixed - point dsp after comparing several methods in respect of running time and program space involved, which attains quick computation besides high precision and implements output voltaic with low harmonic and high control precision of frequency

    通過從運行和佔用空等方面比較在定點dsp上實現浮點數運算的幾種方法,並選擇了近似計演算法作為系統演算法浮點數運算的方法,在保證足夠計算精度的前提下達到計算的快性,實現低諧波和頻精度高的輸出電壓。
  6. Fully considering the system ' s reliabilty, being real - time, speed and extensibility, it finally chooses the sdh as the system network of cors through deep compration and alalysis of four special data lines supplied by china telecom, so that an effective interconnection among the stations and the workstations in the control - center comes true

    摘要充分考慮系統可靠性、實性、通信、可擴充性等因素,通過對中國電信提供的4種數據專線服務的綜合分析比較,選擇了同步數字體系作為系統通信網路,實現了中心各工作站和各基準站之的高互聯。
  7. Continually improve equipment performance, troubleshoot equipment failure and improve turnover time, reduce scrap, increase line - speed with improved processes, control paint and natural gas consumptions

    持續提高設備性能、設備故障解決、提高周轉,減少廢品,提高線原料的使用。
  8. When the accelerating time of frequency is equal to zero, this paper discusses the gain of inventer - induction motor under the vector controlled and non - vect or c ontrolled. at the same time, this paper discusses it while the time of slope is no t zero. the m othod of the slippery and difference is introduced in this papaer for designing the system contained inv - m

    討論了頻為零,矢量和非矢量兩種情況的通用變頻器異步電動機的傳遞函數,同也討論了斜坡給定不為零的通用變頻器異步電動機傳遞函數,介紹了滑差限定的方法,為設計含有inv - m的系統提高提供了理論依據
  9. Abstract : when the accelerating time of frequency is equal to zero, this paper discusses the gain of inventer - induction motor under the vector controlled and non - vect or c ontrolled. at the same time, this paper discusses it while the time of slope is no t zero. the m othod of the slippery and difference is introduced in this papaer for designing the system contained inv - m

    文摘:討論了頻為零,矢量和非矢量兩種情況的通用變頻器異步電動機的傳遞函數,同也討論了斜坡給定不為零的通用變頻器異步電動機傳遞函數,介紹了滑差限定的方法,為設計含有inv - m的系統提高提供了理論依據
  10. In this dissertation, two kinds of optimization, methods are proposed. firstly, only these linking weights corresponding to the control rules that affect the control performance significantly are updated in order to reduce the compute works and speed up the training progress. secondly, the updating step is adjusted adaptively in accordance with the error and the change of error of the system based on the t - s model to get better performance

    針對模糊神經網路器一般存在著在線權值調整計算量大、訓練長、過度修正權值可能導致系統劇烈振蕩等缺點,提出了兩種模糊神經網路器的優化方法:在線自學習過程中僅對性能影響大的規則相關的權值進行修正,以減小計算量,加快訓練度;基於t - s模糊模型,根據偏差及偏差變化大小動態自適應調節權值修正步長,抑器輸出的劇烈變化,避免系統發生劇烈振蕩。
  11. With the development of the converter drive technology, the requirement for the variable frequency drive are becoming more and more strict especially for the modern converter drive employing fast switching semiconductor igbt , though it has high pulse frequency and refreshing time of only nanoseconds, it generates emf that has adverse effect on the environment

    隨著頻傳動技術的發展,對頻傳動系統的要求越來越高,尤其是對採用快切換的igbt半導體現代變頻技術,盡管脈沖頻高或更斷僅毫微秒內,但它們會對周圍環境產生電磁場。
  12. The planeness and integrality of the flier - plate were ensured effectively by exerting restrictive pressure, controlling heating and cooling rate, lowering welding temperature or reducing welding time as much as possible, etc. theoretical model of creating quasi - isentropic compression via 93w - ofc - tc4 - a1 - mb2 system flier - plate with graded wave impedance was established, and numerical simulation of the impact process was then carried out

    採取施加外部機械力、升降溫以及盡量降低焊接溫度或減少焊接(防止脆性金屬化合物的過度增長)等措施,確保了焊接接頭的平整性和界面結構的完整性。建立起梯度飛片擊靶的理論模型,對93w - ofc - tc _ 4 - al - mb _ 2系波阻抗梯度飛片的擊靶過程進行了數值模擬計算。
  13. Being master control part, user controller stores, manages, display and query user information ; as slave control part, sub - user controller calculates and temporarily stores power sent from measuring module ; measuring module measures electric energy by using power meter ' s special circuit which simplifies circuit design and connects or breaks up power supply circuit by relay ; in order to transmitting data fast and exactly, rs - 485 communication standard is adopts between user controller and sub - user controller

    部分用戶模塊可存儲、管理、顯示和查詢用戶電能信息;從部分子用戶模塊計算並暫存電能測量模塊輸出功數據;電能計量模塊採用電度表專用厚膜電路hdb6進行電能計量,簡化了電路設計,同還利用繼電器連接或斷開用戶的供電迴路;在主從部分採用rs - 485通信標準實現數據快、準確的傳輸。
  14. A double time - scale rate control algorithm for multimedia real - time applications in packet switched networks

    分組網上多媒體實業務雙尺度演算法
  15. In this task, a test _ bed for engineering vehicles was developed based on virtual instrument. the whole system comprised 5 parts : the checking of running velocity, which was gotten on the test bed through the vehicles simulating real road running ; the temperature checking of the important points on the transmission system ; the temperature checking of the circling cooling water on the exit port of dynamometers ; the control of the loading power. which was given to vehicles by the power measuring machine ; the control of the total test - run time

    本課題開發的基於虛擬儀器的工程機械跑合試驗臺,其測量和參數有:行駛度檢測(車輛在跑合試驗臺上模擬路面的行駛度) ;傳動系溫度檢測(試驗車輛傳動系主要部位多點溫度) ;冷卻水溫度檢測(測功機循環冷卻水出口溫度) :加載功(測功機施加給車輛的載荷) ;跑合(試驗車輛在試驗臺上加載跑合的總) 。
  16. The approximate computation method is used in float point computation of system ' s control algorithms after comparing several methods in respect of running time and program space involved, which attains quick computation besides high precision and implements excitation voltage with low harmonic and high control precision of frequency

    通過從運行和佔用空等方面比較實現浮點數運算的幾種方法,並選擇了近似計演算法作為系統演算法浮點數運算的方法,在保證足夠計算精度的前提下達到計算的快性,實現低諧波和頻精度高的勵磁電壓。
  17. In the time - domain, based on the principle of random sampling of dso. two way ( " time amplifing in dual slope integral " and " time - voltage convert " ) are implemented to measure the time between the system triger and writing clock. thus random sampling interpolate can be done to measure repeated signal in high frequency with the a / d convert and controller which frequency are lower

    域,根據數字示波器隨機取樣原理,用兩種方法(雙斜積分放大測量方法和? ?電壓轉換測量方法)測量數字示波器系統觸發和采樣寫隔,用低a / d轉換器及器進行模?數轉換和,以此進行隨機取樣內插,從而實現了對高頻重復信號的測量。
  18. By means of wide investigation, instruments development, a series of model experiments and relative theory analysis, following results are obtained in river model time scale distortion ratio, model roughening, inflow and outflow controlling methods and equipment, new water level and velocity measuring technique, model automatic measuring and controlling system : ( 1 ) with the aid of configuration software, a large scale river model automatic measuring and controlling system is developed, realizing river model automatically controlling and basic hydraulic parameters automatically measuring

    本文通過廣泛調研、儀器研製、系列模型試驗和相關的理論分析,在河工模型變態、模型加糙、出入流檢測方法和設備、水位流測量新技術、模型自動測系統等方面取得了下列成果: ( 1 )應用工組態軟體技術,開發了一套大型河工模型自動測系統,實現了模型內外邊界的自動和基本水力參數的自動量測。
  19. Power bond graph is used to established the bond graph model of the lifting and dropping of hydraulic pile hammer and state space equation in the paper for hydraulic pile hammer is perplexing nonlinear system. in order to attain the graph that pressure, position, velocity, acceleration vary with time in the course of driving pile simulation procedure solving state space equation is designed on the basis of combining four - order runge - kutta method with predicator - corrector method, dynamic simulation of the hydraulic system is studied in matlab 6. 5. it is convenient to analyse dynamic characteristics of the hydraulic syste m, beneficial to the design and parameter optimization of the hydraulic system. in the final part of the paper, under detailed analysis of the control characteristics for double - acting hydraulic pile hammer with double cylinders, control system based on the programmable logic controllers founded on technology of modern compute is designed

    由於液壓打樁錘液壓系統是一個復雜的非線性系統,本文採用功鍵合圖法建立液壓打樁錘上行、下降的鍵合圖模型和狀態空方程,通過四階龍格?庫塔法和預估?校正法相結合編了模擬程序對狀態空方程求解,在matlab6 . 5中進行液壓系統的動態模擬,獲得液壓打樁錘運動過程中壓力、位移、度、加度等隨變化的曲線圖。此曲線圖方便了對液壓系統動態特性分析,為液壓系統的設計和參數優化提供了有益的借鑒。最後,在深入分析雙缸雙作用液壓打樁錘系統的功能要求后,採用了以現代計算機技術為基礎的新型工業裝置? plc可編程式器,設計出了雙缸雙作用液壓打樁錘的電器系統。
  20. The anti - lock braking processes based on logic threshold control are simulated in the environment of matlab / simulink software. the influences on logic threshold control abs by the factors such as road condition, initial velocity, the changing rate of braking torque, delay time, inertia and load are discussed at the same time

    運用matlab simulink軟體,對基於邏輯門限方法的防抱動過程進行了計算機模擬,並分析了路面、初動力矩變化、延遲、轉動慣量及載荷等因素對邏輯門限abs的影響。
分享友人