連接水路 的英文怎麼說

中文拼音 [liánjiēshuǐ]
連接水路 英文
water links
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • 連接 : connect; fit together; link; marry; mate; joint; association trail; linkage; concatenate; concate...
  • 水路 : waterway; water route; aquage; [現英方] gote
  1. Waterways : the grand canal runs through the city from north to south.

    :大運河貫穿南北,高郵湖蘇皖。
  2. Fieldbus is a kind of communication network which is a whole digitial communication multi _ embranchment data bus between intelligential field device and auto _ system. control system based on pcs ( fieldbus control system ) is a new kind of system which connect field control unit, field monitor unit, operation unit, communication interface uint with databus. lt integrates computer technology, communication technology and process cnotrol technology to adjust to demand of high standard productive control and enterprise management. lt developments and follows the advantage of traditional instrument control system and computer central control system and make up for their disadvantage so that it is applied in different industrial cnotrol area

    現場總線是智能現場設備和自動化系統的數字式、雙向傳輸、多分支的通信網。它是一種能支持雙向、多節點、總線式的全數字通信網。基於現場總線技術的控制系統是一種新型的控制系統,它採用總線方式將現場控制單元、現場監視單元、操作站、通信介面單元起來,綜合了計算機技術、通信技術和過程式控制制技術,以適應現代高平生產控制與企業管理的需要。
  3. The shengyuan logistics co., ltd., of taizhou, locate in the middle part of shanghai - guangzhou gold coast zone, the most developed economy area, where there is chinese valve door, and one natural deep water good harbour group undeveloped - damaiyu harbour of yuhuan, zhejiang. landway connects shanghai - fujian speedway

    臺州生源物流有限公司,地處滬穗黃金海岸帶中部,經濟最發達區域,中國閥門之都,國內尚未開發天然深良港群浙江玉環大麥嶼港,陸上滬閩交速公
  4. From the introduction of the structure and characteristic of dcs, the analyzing in process and control peculiarity of huaxin type cement kiln and the analyzing in the ordinary forms of computer control system in the cement plant, to determine the feasibility of application of the dcs in computer control system of huaxin type cement kiln ; introduced the structure of the system hardware, constitutes and characteristic of the industrial network, the characteristic and the performance in industrial control system of the software system ; illuminated the whole course of the design and the application of simatic s7 - 300 programmable controller in the industrial producing process profoundly : the protraction of a control flowchart ; the confirmation of the control scheme in every cell ; how to workout a table of the all controlling and measuring dots in the control system ; how to set up a plc control project ; the configuration of the hardware and the network in project ; illuminated the course of how to program the plc control program in detail ; how to establish a connection between the plc and the programmer ; how to download the configuration and the program of the plc project ; the configuration of control center software simatic wincc ; the whole course and the methods of the control system debugging ; illuminated the essential in the course of the design in project and program ; illuminated the problem and its respondence maybe encountered in the project ; illuminated the superiority of the new control system in inspecting, operating and its stability ; discuss the development of the computer control system in the application of the huaxin type cement kiln

    從介紹了dcs的結構、特點和分析華新型泥窯的工藝控制特點及當今在泥窯計算機控制系統上採用的幾種常見形式的比較出發,分析了在華新型泥窯應用dcs的可行性;詳細介紹了系統硬體結構、網組成及特點、所採用的軟體體系的特點及其在工業控制應用中的性能;深入詳細地說明了西門子s7 - 300可編程序控制器在華新型泥窯控制上應用及設計的全過程:控制流程圖的繪制;單元控制方案的確定;系統控制測點表的編制; plc控制項目的建立;項目硬體及網的組態; plc控製程序的編制過程並詳細說明了控製程序的編制思; plc與編程器的建立; plc項目組態及控製程序的下載; wincc監控軟體的組態;控制系統的調試過程及方法;對設計和使用的要點及系統調試時應注意的問題進行了說明;對項目的實施后的華新型泥窯控制系統在操作和控制上及其在系統易維護性、系統穩定性上的優勢進行了說明並討論了華新型泥窯計算機控制系統的發展方向。
  5. Construction of a single - lane road bridge of 70 m in length across the san tin eastern main drainage channel stemdc connecting an existing unnamed road along the eastern side of stemdc near the vha and tyr

    興建長70米並橫跨新田東面主要排道的單線行車道橋,以沿該主要排道東面近車輛輪候區的現有未命名道與淳裕
  6. Abstract : based on problems occurred during the service of the ls spiral conveyer, such as, jam of uncharging orifice, short usefull life of the drop - hanger bearings, easy rupture of connecting parts ; quick wear of spiral vane, etc. and according to the practice of casting process, analysis of break downs, the author put forward the improvement ideas in order to promote the level of the design and manufacture for spiral conveyers

    文摘:針對ls型輸送機使用中存在的一些問題,如卸料口積料堵塞、吊軸承使用壽命短、件易斷裂、螺旋葉片磨損快等問題,依據在鑄造生產中的使用實踐,進行故障分析,提出了改進思,以利提高螺旋輸送機整體設計和製造平。
  7. It will play a great realistic role in improving home information level to research these new technologies, to resolve the problem of connection, communication and cooperation among information appliances, and to realize simple connection and simple control. they will accelerate the popularity of information appliances and the advancement of home network

    研究這些新技術,解決設備間互、互通、互操作問題,實現設備控制操作簡單化、人性化,對加速信息家電的普及,促進家庭網的發展,提高家庭信息化平有著重要的現實意義。
  8. Printed boards - rigid multilayer printed boards with interlayer connections - sectional specification - capability detail specification - performance levels, a, b and c

    印製電板.層間剛性印製電板.分規范.性能詳細規格. a , b和c級性能
  9. The works mainly comprise the demolition of an existing stepped ramp of a footbridge nf85 ; construction of a lift shaft and link slab to connect to the existing footbridge ; improvement works to an existing bus lay - by adjacent to the footbridge ; and associated road, drainage and landscape works

    工程主要包括在橫跨青山公邊圍的現有行人天橋nf85拆除現有臺階斜道興建升降機槽及臺以該現有行人天橋改善近該行人天橋的巴士站及相關的道系統和環境美化工程。
  10. Fibre - cement pipes for sewers and drains - pipes, joints and fittings for gravity systems

    管和排道用纖維泥管.第1部分:重力管系統用管道管件和管配件
  11. The high - grade highwavs in dinghu are wide and smooth ; they radiate in all directions and link up allparts of the country. there are 5 passengers and cargoes stations in the district. the grade a highwat, the national highway 321 - is umimpeded ; and thecement roads in the city proper have formed a net of transport and communications

    鼎湖高等級公平坦寬闊,四通八達,祖國各地,區內設有5個鐵客貨運站, 321國道一級公暢通無阻,城區泥道已形成網,目前正在籌建深碼頭,已形成了以公為主體,鐵運相結合的現代化交通體系。
  12. It is bounded by the lion rock mountain ( sze chi shan ) and tate s cairn ( tai lo shan ) to the north ; the kowloon peak ( fei ngor shan ) to the east ; new clear water bay road and prince edward road east to the south ; and junction road and lion rock tunnel to the west

    北面以獅子山及大老山為界,東臨飛鵝山,南新清灣道及太子道東,西聯合道及獅子山隧道。本區現有三條跨區公、多條區內各處的區域干線和兩條行車隧道(指其南面的出入口而言) 。
  13. Can install on the road at the pipe of any seat, preventing the medium go against the current, the boiler is to river system all last times, and namely his attended mode is using original pipeline both ends flanges can dive into the operating to the clamp

    可在任何位置的管上安裝,防止介質逆流,鍋爐給系統上回,其方式是利用原有管道兩端法蘭對夾即可投入運行。
  14. The link and explosion transmission of non - electric detonator network were analyzed and the cause of misfire during underwater reef blasting with the network was found out

    摘要分析了非電導爆管起爆網和傳爆過程,找出了採用該起爆網進行下炸礁時,炮孔裝藥產生拒爆的原因。
  15. On 10 march 2006, the two ramps on clear water bay road leading to the first floor of ping shek public transport interchange, the roundabout and the kerbside lane except the general loading bay, taxi stand and green minibus stands on the first floor of this public transport interchange will be designated as restricted zones 24 hours daily

    時起,由清灣道往觀塘坪石公共運輸交匯處一樓的兩條行車天橋和此公共運輸交匯處一樓的旋處及旁行車線
  16. According to the request of this subject, we have developed the system hardware and software for the slave device and the inspection software running on the pc. in this paper all of the followings is illustrated detailedly, such as the research on the principles of measurement and its realization, three means of water - level measurement that are separately based on photo electricity coder, pressure sensor and potentiometer ; selection of the microchip, we choose an advanced integrated soc ( system on chip ) microchip c8051f021 as the main controller ; realization of signal sampling, processing and its conversion in the mcu ; application of high precision 16 bits adc cmos chip - - ad7705 in our system, designing its interface with the microchip and relevant program ; using a trickle charge timekeeping chip ds1302 in the system which can provide time norm and designing of its i / o interface and program ; additionally, a 4 ~ 20ma current output channel to provide system check - up using ad421. in the system, ad421, ad7705 and the microchip compose spi bus ; to communicate with the master pc, here we use two ways which are separately rs232 and rs485 ; moreover, there are alarm unit, keyboard unit, power supply inspection unit and voltage norm providing unit in the system

    針對研製任務的要求,課題期間研製了下位機系統硬體和軟體,開發了上位機監控軟體,其中所作的具體工作包括:測量原理的研究和在系統中的實現,在本次設計中用三種方法來進行位測量,分別是旋轉編碼器法、液位壓力傳感器法和可變電阻器法;主控晶元的選擇,我們選用了高集成度的混合信號系統級晶元c8051f021 ;實現了信號的採集和處理,包括信號的轉換和在單片機內的運算;高集成度16位模數轉換晶元ad7705在系統中的應用,我們完成了它與單片機的介面設計及程序編制任務;精確時鐘晶元ds1302在系統中的應用,在此,我們實現了用單片機的i o口與ds1302的和在軟體中對時序的模擬,該晶元的應用給整臺儀器提供了時間基準,方便了儀器的使用;另外,針對研製任務的要求,還給系統加上了一4 20ma模擬信號電流環的輸出電來提供系統監測,該部分的實現是通過採用ad421晶元來完成的,本設計中完成了ad421與單片機的spi介面任務,協調了它與ad7705晶元和單片機共同構成的spi總線系統的關系,並完成了程序設計;與上位機的通信介面設計,該部分通過兩種方法實現: rs232通信方式和rs485通信方式;系統設計方面還包括報警電設計、操作鍵盤設計、電源監控電設計、電壓基準電的設計。
  17. The double - deck lantau link consists of the tsing ma bridge linking tsing yi to ma wan ; a viaduct over ma wan ; and the cable - stayed kap shui mun bridge linking ma wan to lantau

    青嶼干線採用雙層結構,其組成部分包括青衣與馬灣的青馬大橋、跨越馬灣的高架道,以及採用斜拉橋設計、馬灣與大嶼山的汲門大橋。
  18. The proposed improvement to the existing wsd service road and the introduction of new access road within sai kung east country park should be considered in the light of the conservation and recreation objectives of the park itself

    建議改善務處現有的維修用道,以及在西貢東郊野公園內興建新的的事宜,應從自然保育和郊野公園的康樂目標本身,加以研究。
  19. The construction of phase iii started in september 1935 and was completed in 1939, when the third cross - harbour pipeline had been laid. this phase included the laying of twin cross - harbour pipelines that connected kowloon and hong kong island, the building of the tunnel and pumping station, the heightening of the main dam from 115 ft. to 275 ft. and the construction of an auxiliary dam, named the pineapple pass dam

    第三期工程於1935年9月展開,至1939年第三條海底輸管建成后才告完工,主要工程包括兩條九龍至香港的海底輸管、塘與供的輸隧道、抽機、主壩由115尺加高至275尺,以及興建82尺高的菠蘿凹副壩。
  20. Valves, gauges and other safety fittings for application to boilers and to piping installations for and in connection with boilers - specification for valves, mountings and fittings

    鍋爐與鍋爐用閥門位計及其它安全管件.第1部分:閥門安裝件和管件規范
分享友人