進口水閘 的英文怎麼說

中文拼音 [jìnkǒushuǐzhá]
進口水閘 英文
inlet sluice
  • : 進構詞成分。
  • : Ⅰ名詞1 (人或動物進飲食的器官; 嘴) mouth 2 (容器通外面的地方) mouth; rim 3 (出入通過的地方) ...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : anchor gate
  • 進口 : 1 (船隻進港) enter port; sail into a port2 (外貿進口) import3 (入口) entrance; [機械工程] i...
  • 水閘 : water gate; water lock; penstock; dam; sluice; pen; sasse; canal-lock
  1. Based upon the present regulation, the design and construction check and structure strength check, the electric power generation water inlet anchor gate crane platform ' s hydro - engineering structure of fushui power plant were conducted and an analysis for the reasons of building structure fracture was carried out

    摘要行了富電廠發電門啟閉機平臺安全檢測,依據現行規?對其建築物行了設計與施工復核、結構的強度復核和建築物的裂縫成因分析。
  2. The common areas, including corridors, lifts and lift lobbies, back staircases, the gates of entrances to the building and letterboxes were disinfected yesterday. water storage tanks were also cleaned

    大廈的公用地方包括走廊、電梯及電梯大堂、后樓梯、大廈入門及信箱等已於昨日行消毒,貯箱亦已作清洗。
  3. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善堵工程龍力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港洪、計算時段的變化、多門、多庫容、多)的龍力計算,並行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果行分析和處理;計算結果的后處理採用vb編程實現龍力要素最大值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程行龍力計算,為堵合龍提供科學依據。
  4. Seawall and sluice are the parts constructed in advance, while final closure is the last part in construction. the hydraulic condition during the final closure process is worse than that during any other processes. and with the compressing of the entrance, the hydraulic condition becomes badly, the drop height of entrance can reach 2 to 3 meter, the maximum velocity of flow even reaches 6 to 8 meter per second and flow condition also becomes complex

    海堤和的修建都是圍海工程先期施工的部分,堵則是海堤修築的最後階段,堵合龍成敗關繫到圍海工程成敗,由於此階段所遇到的力條件十分惡劣,門落差可達2 3m ,流速最大可達到6 8m / s ,且流極其復雜,根據我國《圍海工程技術規范》規定圍海堵必須行龍力計算。
  5. The researches including discharge capacity, pressare properties, cavitation characteristics at some key positions, hoisting load of the gate, configuration of energy dissipator at the exit dentated - sill, and downstream scouring were performed by hydraulic model tests

    藉助系列工模型試驗對布埡放空洞的泄流能力、壓力特性及關鍵部位的空化特性、門啟閉力、出鼻坎消能工體型及下游沖刷等行了較深入的研究、分析。
  6. This machine adopts the best advanced imported frequency conversion timing controlled technical drive. it adopts dlectrical brake setting, its deendability is lofty and cutting is exact. this machine is mostly used for many quadrate foam rubber once flatly slicing. it can be continuously cutout, and do not recede cutter, the production efficiency is better

    70型採用當前最先變頻調速技術驅動,去除落後的抱剎車裝置,可靠性高,切割精確,本機主要用於多個方泡泡綿的一次性平切片工作,連續切割,不用退刀,生產效率更高。
  7. Abstract : using a series of model tests, the properties of discharge capacity in the closed conduit due to inflow in gate shaft is studied and a method for estimating reducing discharge capacity is provided to designers

    文摘:通過系統模型試驗,研究了泄道因門井減小泄流能力的特性,並提出了估算方法,可供設計應用。
  8. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船的引航道布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  9. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船的引航道布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  10. At the same time, figures involving attribute data about flow field at inlet and outlet downstream or wave motion of water at the downflow head of lock chamber of siyang navigation lock were displayed through gis application system which we developed. according to data of baoying navigation lock acquired by mathematics model, figures about velocities which have the same value, velocities toward cross direction which have the same value and flow field at inlet and outlet upstream were formed. achievement data, space information and attribute information were in connection with figure so as to search for and analysis the information, which is satisfying

    同時完成了江蘇泗陽船下游引航道非恆定流及其改善措施的計算分析研究和寶應船上游引航道門區流條件計算分析研究,運用gis技術和所設計的gis應用系統對泗陽船下游引航道內流場以及下位波動情況行信息顯示,根據對寶應船的計算結果生成上游引航道門區等流速圖、橫向流速等值線圖和流場圖,使計算分析成果數據、空間信息、屬性信息與圖形顯示有機結合,便於查詢分析,效果令人滿意。
  11. Safety monitoring design during the renovation and s trengthening of old sluices across major embankments of yangtze river is describ ed here. for further enhancing the level of safety monitoring design of sluices i n our country, the problems related to how to design and what to pay attention to represented in the article by two illustrations, i. e., fankou sluice and niupiao sluice

    論述了長江重要堤防老改造加固過程中的安全監測設計,並以樊及牛皮坳作為典型實例,闡述了如何行設計和需要注意的問題,旨在一步提高我國堤防的安全監測設計平。
分享友人