進口蝸殼 的英文怎麼說

中文拼音 [jìnkǒu]
進口蝸殼 英文
inlet scroll
  • : 進構詞成分。
  • : Ⅰ名詞1 (人或動物進飲食的器官; 嘴) mouth 2 (容器通外面的地方) mouth; rim 3 (出入通過的地方) ...
  • : 名詞[動物學] (蝸牛) snail
  • 進口 : 1 (船隻進港) enter port; sail into a port2 (外貿進口) import3 (入口) entrance; [機械工程] i...
  1. Numerical investigation on the swirling flow inside a volute influenced by distorted inflow

    離心風機周向來流的非均勻性對其旋渦流動影響的數值研究
  2. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站型式研究;鋼襯鋼筋混凝土引水管道研究;打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  3. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站型式研究;鋼襯鋼筋混凝土引水管道研究;打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  4. This allows the crab to insert a large toothlike appendage on its right - hand claw into the opening, thus cracking the snail ' s shell

    這樣就可以把它右爪那邊象牙齒樣的東西刺從而弄碎
  5. The reason that the noise is lower with inclining tongue is : 1 ) both the radius of the tongue and the gap between the tongue and the blade are changed across the wideth ; 2 ) the phase angle between blade and the tongue is changed across the wideth, therefore the peak value of the noise do not appear at the same time, so the peak value of the noise with inclining tongue is much lower than the straight one. the influence of the expanded angle of the shell of the fan on the noise was invested experimentally, and the optimal angle was got

    傾斜舌降噪的主要原因是:一是改變了從氣流入側到風機輪盤的舌間隙和舌半徑;二是改變了葉輪與舌非定常相互作用的相位差,使其產生噪聲也有相位差,迭加的結果一步降低了噪聲。另外,試驗研究了不同擴張角對風機噪聲及效率的影響規律,擴張角選擇當否,對效率和噪聲影響較大。
分享友人