運積粘土 的英文怎麼說

中文拼音 [yùnnián]
運積粘土 英文
transported clay
  • : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
  • : Ⅰ動詞(積累) amass; store up; accumulate Ⅱ形容詞(長時間積累下來的) long standing; long pending...
  • : 粘動詞(粘附) glue; stick; paste; adhere to; bond
  1. Abstract : yanchang series is a typical low permeability reservoir, and its favourable sandstone reservoir is delta facies. heavy compaction, cementation and heterogeneity exist in it. according to the analysis of the main control factors of forming the secondary pore, it is held that the secondary pore in longdong area is controlled by both favorable facies belt and abnormal formation pressure. it is also held that the formation of the abnormal formation pressure is due to the dewatering of the clay mineral during diagenesis because the dewatering time is identical with the decarboxylation time of organism. organic acid and co2 are driven to adjacent favorable reservoirs under the abnormal formation pressure, and a lot of secondary pore is produced in the runners. from the present exploration result, it is useful to predicting the development of secondary pore to study the distribution of abnormal formation pressure

    文摘:陜甘寧盆地三疊系延長統是國內外典型的低滲特低滲油田,儲集層主要為三角洲砂體,壓實作用和膠結作用強烈,儲層非均質性非常嚴重,因此預測次生孔隙發育帶是尋找油氣聚集帶的關鍵.通過對陜甘寧盆地隴東地區延長統次生孔隙形成的主控因素分析,認為陜甘寧盆地延長統次生孔隙的形成除了受沉有利相帶控制外,還與地層異常壓力的作用密切相關.研究認為隴東地區異常壓力的形成機理主要由於成巖過程中礦物脫水作用.礦物大量脫水時間正好與有機質脫羧期相一致,從而在異常壓力作用下將生油巖中的大量有機酸及co2帶到與之相鄰的儲集層中,並沿著有利儲集相帶移,在酸性水經過的地方形成大量的次生孔隙,為後期油氣聚提供有利通道及宿住空間,從現今的勘探結果來看,通過研究地層異常壓力縱橫向分佈特徵,並結合有利相帶研究預測次生孔隙育良帶是行之有效的方法
  2. Yanchang series is a typical low permeability reservoir, and its favourable sandstone reservoir is delta facies. heavy compaction, cementation and heterogeneity exist in it. according to the analysis of the main control factors of forming the secondary pore, it is held that the secondary pore in longdong area is controlled by both favorable facies belt and abnormal formation pressure. it is also held that the formation of the abnormal formation pressure is due to the dewatering of the clay mineral during diagenesis because the dewatering time is identical with the decarboxylation time of organism. organic acid and co2 are driven to adjacent favorable reservoirs under the abnormal formation pressure, and a lot of secondary pore is produced in the runners. from the present exploration result, it is useful to predicting the development of secondary pore to study the distribution of abnormal formation pressure

    陜甘寧盆地三疊系延長統是國內外典型的低滲特低滲油田,儲集層主要為三角洲砂體,壓實作用和膠結作用強烈,儲層非均質性非常嚴重,因此預測次生孔隙發育帶是尋找油氣聚集帶的關鍵.通過對陜甘寧盆地隴東地區延長統次生孔隙形成的主控因素分析,認為陜甘寧盆地延長統次生孔隙的形成除了受沉有利相帶控制外,還與地層異常壓力的作用密切相關.研究認為隴東地區異常壓力的形成機理主要由於成巖過程中礦物脫水作用.礦物大量脫水時間正好與有機質脫羧期相一致,從而在異常壓力作用下將生油巖中的大量有機酸及co2帶到與之相鄰的儲集層中,並沿著有利儲集相帶移,在酸性水經過的地方形成大量的次生孔隙,為後期油氣聚提供有利通道及宿住空間,從現今的勘探結果來看,通過研究地層異常壓力縱橫向分佈特徵,並結合有利相帶研究預測次生孔隙育良帶是行之有效的方法
  3. Researching on the technology if reverse order is to study strains if pits, structural systems if basement, environmental surwey and underpinnings. on account of emphasizing developing methods if checking strength if pick - ets, modemizing machenes of excavation and studying methods of underpinning is put forward and is a way if controlling the quality of pickets in sites, which leads an active effect ; synthetic application if rankintheory, spatial and time effect theory to excavation tl aanalyze the state of soil force and strain is brought forward and the time effect should be considered in the zone of clay, the formation and development of soil plasticity are analyzed and the most dangerous zone to decide how to excavate and where to begin is found ; analyzing the cause of picket settlement during reverse order and the differential settlement and discussing hlw to solute it. duringh the temporary survey and the environmental warship, bringing rorward the theory of environmental vibration and analyzing the state of soil force and probability of losing stabilization of soil under the effect of environmental vibration ; analyzing the state offeree in underground concrete wall by the method of mathematics and pointing out the place of the maximum force and deformation. based on systematic illustrating the reverse order, problems about application and development of reverse order and suggestions also are expressed

    鑒于國內外的研究把重點放在大力發展工程樁的實驗室承載力監測方法與設備、如何使方開挖機械現代化及對周圍建築的臨測方法上,本文提出了現場利用聲波層析成像技術監測鋼砼樁內部質量的方法與程序,並得出了聲波層析成像技術是砼樁的動態質量檢測的有效手段,這對指導施有極、現實意義;提出了綜合用朗肯壓力理論、基坑空間和時間效應影響理論來分析逆作法施工過程中基坑邊坡體應力及應變的變化情況,指出地區也應考慮時間效應,並且進一步分析了基坑邊坡體的塑性區形成和發展,找出邊坡最不利的區域,以確定地下室體的挖掘的方式和順序,指出憑主觀臆斷與經驗來施工是不可取的;在分析、經較逆作法與大開挖順作法的地下室結構體系受力情況及施工順序的不同,提出了節點處理技術;分析了逆作法施工期間樁的沉降變化原因及由此而產生的差異,並探討了解決的方法;本文還提出了環境振動對體邊坡穩定產生影響的觀點,並分析了在環境振動影響下,體的應力狀態及休失穩破壞概率,並且還用彈性力學知識和數學分析的方法定量地分析了地下混凝墻受力狀態,指出了被監測墻體的最大應力、應變位置。
分享友人