邊坡坡度 的英文怎麼說

中文拼音 [biān]
邊坡坡度 英文
grade of side slope
  • : 邊Ⅰ名詞1 (幾何圖形上夾成角的直線或圍成多邊形的線段) side; section 2 (邊緣) edge; margin; oute...
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 邊坡 : bank
  • 坡度 : falling gradient; slope; inclination; declivity; pitch; batter
  1. The study includes the hole color tv imagery system for drill hole, even - pole bore - hole acoustic system and acoustic meter, bore - hole multi - point consolidation apparatus, the quick camera computer - aid image for high rocky slope, image technology for layer analysis, safety monitoring technology for the section close to the dam, software for processing and forecasting the slope monitoring data, high precision geodesy monitoring automation system, etc. all the study results are new, advanced and practical, which has applied in the project and gained the obvious benefits

    鉆孔彩色電視孔壁成像系統、直接橫波測井研究偶極子井下聲系和聲波儀、鉆孔多點滲壓儀及壓模系統、巖質高快速攝像微機地質素描成圖、層析成像技術、近壩庫段安全監測技術、監測數據處理預報軟體研究、高精大地測量監測自動化系統等項目,研究成果內容新、先進、實用,已在工程中應用,效益顯著。
  2. At the same time 7794m3 affusion test were processed, and roadbed settlement observation conducted for two more year, physical mechanism and chemical index experiment were analyzed in the laboratory, section experiment of earth sample was proceed, changement of compacted soil body micromechanism along with depth were analysed by polariscope and scan electricscope. drain ditch, barrel - drain and little bridge were treated by composite geotextile

    在室內進行了物理力學、化學指標實驗分析,並對土樣結構進行了切片試驗,用偏光顯微鏡和掃描電鏡分析了土壤碾壓后沿深分佈的土體微觀結構變化情況,對溝、排水溝、小橋涵及護封水採用復合土工布進行處理。
  3. The report takes account into the influence of foreshore and shallow foreshore, roughness, slope, berm, wave attack angle, vertical wall and so on

    報告給出了復雜斷面上波浪爬高和越浪量的計算公式,計算中考慮了前灘、糙率、邊坡坡度、平臺、波浪入射角以及豎墻等因素的影響。
  4. On critical length of flexural slumping rock layer in layered rocky slope and its influencing factors

    順傾巖層滑移彎曲臨界長及其影響因素分析
  5. Through indoor tests and field tests this paper has researched the geogrid " s characteristics of application in highway engineering, such as characteristic of intension, creep, endure, damnify in construction etc. based on these researches this paper has also researched the working characteristics of contact face between geogrid and soil and the method of geogrid - reinforced slope analysis. mechanism of geogrid - reinforced slope has been analyzed

    文章通過室內、外試驗,對土工格柵的強特性、蠕變特性、耐久性能及抗施工損傷性能等工程應用特性進行了研究;在此基礎上,結合室內試驗和理論分析對土工格柵與土的界面工作特性和加筋的穩定性分析方法進行了研究,對土工格柵加筋機理進行了分析;最後結合實體工程,對土工格柵加筋陡的施工工藝進行了系統研究。
  6. The slope stability question is influenced by many kinds of inherent factors, for instance geological structure, intensity of rock body, development state of joint and crack, cohesive force ( c ) of the rock, interior angle of friction ( f ), groundwater, etc., these objective factors reflect generally their sizes with some quantitative parameter indexes in the past

    穩定問題受多種內在因素影響,如地質構造、巖體強、節理裂隙發育狀況、巖石的內聚力( c ) 、內摩擦角( ) 、地下水等,這些客觀因素過去一般用某些定量參數指標來反映其大小。
  7. Through tracing the change of the stress on the horizontal and slantwise paths, the influence and scopes of the excavation effect on the inside stress field of the slope are put forward

    通過對水平和傾斜路徑的應力追蹤,提出了開挖效應對內部應力場的影響程和范圍。
  8. Along with the deeping and steepening of the slope, the difficulty to maintain stability of the slope and the probability of failure of the mining area are getting large and large

    隨著的加高加陡,露天穩定性維護的難和采場破壞的概率越來越大。
  9. The establishment of srqd system inaugurates one path to surficial rock mass quality evaluation, and the establishment of irqd system is of significant value in reducing prophase engineering cost and in ensuring engineering safety. etc

    表面rqd指標體系的建立,為巖質表面破碎程評價指出了一條未來的研究道路。整體rqd指標體系的完善對減少工程前期費用、保證工程安全等,均具有非常重要的工程意義。
  10. The excavation on the left side of xiangjiaba hydropower plant would form the large - scale artificial slope, which refers to the main project near the source of the river and the project of intake sea - route near the mouth of the river, and its height would reach 150 meters

    向家壩水電站左岸開挖將形成規模較大的人工高,涉及上游段的主體工程和下游段的引航道工程,工程的高達150m 。
  11. According to composition and structure feature of jinjiang landslide analysis, the author considers it was a enormous landslide with the characters about multi - period ( total four slides ) and overlaying, its mechanism of deformation failure attributed to a representative sliding - bending mode in the consequent slope, the stability calculation indicates that no matter what the whole landslide would not slide, while, as earthquake intensity reaching or exceeding vi, the first - period landslide which lies to the south of huangjiagou in the front slip mass and the fourth - period landslide which lies to the north of caojialiangzi in the back slip mass will slide

    由金江滑的組成及結構特徵分析可知,為一多期次(四次滑動)兼具超覆特徵的巨型滑,其變形破壞機制屬順層中比較典型的滑移?彎曲型。穩定性計算表明,滑整體穩定性較好,僅在遭遇及其以上地震作用的情況下,堆積體前部靠黃家溝以南的第一期滑及靠後部北側曹家梁子的第四期滑堆積體才會失穩;因素敏感性分析表明,滑穩定性對地震(尤以強震)最為敏感。
  12. Critical height analysis for bedding rock slopes using the upper - bound method of limit analysis

    層狀巖質臨界高極限分析上限解
  13. Third, in the loess area, there is tension fractures on the top of slope generally. deep of the tension fracture could be deduced theoretically by columb strength theory

    3 、黃土地區,后緣常存在垂直張裂縫,裂縫深根據土的強指標可以計算。
  14. From the aspect of the coupling action of geological and engineering conditions, this paper analyzes their influences on high slope stability. the result shows that constructional surface, lithology, slope angle and height are the most influential factors. provided that a slope angle in a stepped slope is constant, the slope stability is very sensitive to the height / width ratios of steps, and the best design for the slope is to make the height of each step no more than one - third of the total height and the height / width ratio between 1 : 0. 2 - 0. 3

    從地質與工程耦合作用出發,分析了地質因素和工程條件對高穩定性的影響,指出結構面、巖性以及角和高是穩定性的重要影響因素,在角一定的前提下臺階狀的臺階高寬比對穩定性影響山十分明顯,一般以每級臺階的高不超過總高的1 / 3 ,高寬比在1 : 0 . 2 0 . 3之間為最佳設計。
  15. Based on the field exploration and long - term underground observation, this paper reveals the zoning of structure and the timing of mechanical strength for dilative soil, and puts forward the experiment method to obtain values by zoning in the design of dilative soil slope

    通過野外勘探及地下長期觀測,揭示了膨脹土的結構分帶性和力學強的時效性,提出了膨脹土設計中分帶取值和試驗方法。
  16. However, along with the increasing of construction quantity of the infrastructure of irrigation works, traffic, communication etc., newer and higher requirement of geotechnical anchoring are made in slope, major dam, bridge, tunnel, deep foundation ditch engineering and the construction engineering such as anti - capsize, anti - float, anti - slippage engineering of the buildings. for example, self - intension of rock and soil is required to exploit better ; carrying capacity of anchor increase according to anchoring length ; anchor should be sufficiently lasting and should not influence the exploitation of adjoining stratum

    但另一方面,隨著我國水利、交通、通訊等基礎設施建設力的加大,、大壩、橋梁、隧洞、深基坑以及建築結構物的抗傾倒、抗浮力、抗滑移等建設工程將對巖土錨固提出一些新的和更高的要求:如要求進一步調用巖土體的自身強,錨桿應具有足夠的耐久性,錨桿的使用應不影響周地層的開發等。
  17. Through analysis, we conclude that washing action of wave and flow is main power of evolvement of region of interest landform, structure lead to the fact that water area around shallow structure in cheng dao sea field has an increase about 0. 3m / a through actual measurement, water depth increase rate around foundation is 0. 25m / a, slope gradient of side slope averagely has a decrease of 5 % o a year, however marine hydropower wash rate through compute is 0. 2m / a on underwater bottom, the wash rate on structure foundation is 0. 35m / a

    分析認為,浪流的沖刷作用是研究區水深地形演化的主要動力,構築物的存在,使埕島海域淺水區人工構築物周水域實測年水深增加幅約0 . 3m a ,地基附近水深增加速率0 . 25m a ,邊坡坡度平均每年以5減緩,而計算得出的海洋水動力沖蝕速率在水下底為0 . 2m a ,在構築物地基沖蝕速率達0 . 35m a 。
  18. The analysis shows that the depths of the major and auxiliary anchor rods are affected by the cement mortar and its bond strength with the rock body and not affected by the gradient and the height of the rock side slope

    並得到如下結論:主次描桿的錨固深只受水泥砂漿與巖體的結合強的影響,不受邊坡坡度和高的限制。
  19. A centrifuge testing program was undertaken to investigate the distributing of displacement on the embankments " cross sections and to observe the performance of these embankments at failure or the failure trend of these embankments. the responses of foundations were also analyzed. various slopes and various spacing of the reinforcements were considered in this testing program

    通過離心模型試驗,對不同邊坡坡度、不同加筋密的土工格柵加筋路堤及不加筋路堤橫截面上的位移分佈進行了對比分析,對各模型在不利工作狀況下地基的響應情況、路堤的整體變形情況、破壞情況及趨勢進行了觀察。
  20. Earth embankment and geogrid reinforced embankment with various slope, various spacing and length of the reinforcements, various heights were calculated by fem. each factor ' s influence on the tensile stress of the geogrids, the stress and displacement distribution in the cross sections of embankments and the response of foundations were analyzed

    採用有限元理論與方法對不同高、不同邊坡坡度、不同加筋密、不同加筋長的土工格柵加筋路堤及不加筋路堤進行了計算與分析,研究了各因素對格柵內拉力分佈、路堤橫截面上位移及應力分佈的影響以及地基的響應情況。
分享友人