邊坡平臺 的英文怎麼說
中文拼音 [biānpōpíngtái]
邊坡平臺
英文
plain stage of slope-
The report takes account into the influence of foreshore and shallow foreshore, roughness, slope, berm, wave attack angle, vertical wall and so on
報告給出了復雜斷面上波浪爬高和越浪量的計算公式,計算中考慮了前灘、邊坡糙率、邊坡坡度、平臺、波浪入射角以及豎墻等因素的影響。The region of flow produce is loose embankment and the flat roof, the gully erosion chain is the main cause of the sediment yield increase
棄土場內主要的產流區域為鬆散邊坡和平臺,坡面的侵蝕鏈是造成區域內產沙量增加的主要原因。The results show that distinct " bench " distribution rule takes on for the subsidence and distortion of bench - shape slope surface ; the movement range of bench - shape slope surface is smaller but its distortion is larger than those of flat surface and concentrated distortion occurs at every bench plan ; the surface horizontal distortion of bench - shape slope is still pressed in gob centre and tensioned in both sides of gob ; space - time effect should be taken into account for the stability of bench - shape slope influenced by underground mining
結果表明:露天煤礦臺階狀邊坡體的采動沉陷規律表現出很明顯的「臺階」分佈特點;臺階狀邊坡地表的移動范圍比平地地表要小,但變形卻更劇烈,且在各臺階平面處形成變形集中;臺階狀邊坡地表的水平變形仍然呈現出采空區中間受壓,兩端受拉的特點;臺階狀邊坡在地下開采擾動下的穩定性應考慮采空區的時空效應。Counter dumping technology of open - pit mine ' s waste dump
營盤山采區預留寬平臺和邊坡加陡的可行性探討With synthesize slope ratio increasing, the stability of cutting slopes decreases, but the stability of sharpen slope affected by natural slopes ratio changes rarely, the stability of cutting slope that height is 30m is change notably due to slope type, whose single slope ratio with madao is inferior to the slope that upper ratio is less than lower ratio with platform in middle part. but the stability of cutting slope with 50m height is little change with the slope type change. with same stratum, slope height, slope type, the cutting slope is inferior to the sharpen slope in stability
結果表明,地層含水量在12 . 0 18 . 0變化范圍內,各種挖方邊坡穩定性均隨濕度的增大而顯著降低;路塹邊坡的穩定性隨綜合坡比的增大而降低,但削坡受自然坡比影響,隨綜合坡比的增大其穩定性基本不變;坡高30m的路塹邊坡穩定性因坡型改變而有明顯變化,且單一坡比多級馬道型邊坡的穩定性較上緩下陡平臺型邊坡的穩定性差,但坡高50m的路塹邊坡穩定性因坡型變化而基本不變;當坡高、坡型、地層條件相同時,路塹邊坡的穩定性較削坡的穩定性差。After excavation, there are concentration phenomenon of stress at the corner or the shiplock room, and the tension zone lies in half of the middle part as well as the part of the two slopes to the lower part of the upright wall. finally the analysis results are compared with site monitoring data in period of construction as well as the feedback reports, the result of all comes to meet with each other very well
開挖完成後,在閘室拐角處存在不同程度的應力集中現象,中隔墩上部1 2的巖體及南北邊坡至直立墻頂部平臺以下的部分巖體為拉應力區。在兩側邊坡及邊墻的塑性區出現在損傷區和部分卸荷影響區內,中隔墩大部分區域的巖體都進入了塑性狀態,閘室底板處的塑性區基本上與損傷區一致。With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure
通過分析比較,論證了對數螺旋線型比圓弧形作為邊坡的假設滑裂面具有較多的工程優點,並為此編制了一個採用極限平衡法分析土釘支護的fortran語言程序,以此作工具對滑裂面的后移、土釘錨固段的超長、土釘總力的大小等方面作了研究,得出了有關土釘的長度與邊坡的坡角、坡高、土體力學參數的關系、土釘總力與庫侖土壓力間的關系等結論;採用大型通用有限元數值分析程序ansys分別對採用土釘支護的一階邊坡、二階邊坡進行分析,重點是研究各排土釘的軸力分佈規律、開挖方式及原始邊坡形態對土釘的軸力的影響、上下階邊坡在土釘軸力方面的相互作用,得出了有關第一排土釘的設計問題、不同類型的土體應適用於特定的開挖方式、原始開挖出的邊坡形態對一些類型坡體的邊坡土釘支護有較大的影響而對另外一些影響不大、二階邊坡臺階寬度的合理確定、二階開挖及支護比一階時具有較多的工程優點等結論;通過土壓力分析對朗肯、庫侖兩種經典土壓力理論的區別與聯系、坡面傾斜及墻背有摩擦時的坡面豎向應力分佈、面板背土壓力的分佈形態作了研究,得出了邊坡支擋土壓力受坡體內部穩定與坡面局部穩定兩個方面的影響、土釘支護面板背土體中卸荷拱的存在對面板受力有利等結論。Solar radiation models of different temporal and spatial scales were established by using ground observed data from meteorological stations. a series of distributed models were developed based on principles of direct and diffuse radiation on tilted surfaces and integrated with gis software. using dem data of chongqing, the distributions of direct and diffuse radiation over rugged terrains were simulated
本文利用重慶及其周邊地區的日射站和常規氣象站水平面觀測資料,建立不同時空尺度的太陽輻射估算模型;依據坡地直接輻射和散射輻射機理,以地理信息系統為數據處理平臺,建立起伏地形下太陽輻射分散式估算模型;根據重慶1 : 25萬dem數據,對重慶實際復雜地形下太陽直接輻射和散射輻射進行了數值模擬,為起伏地形下輻射估算及其他地表氣象要素的空間擴展提供有益的嘗試。分享友人