邊坡護面 的英文怎麼說

中文拼音 [biānmiàn]
邊坡護面 英文
slope revetment
  • : 邊Ⅰ名詞1 (幾何圖形上夾成角的直線或圍成多邊形的線段) side; section 2 (邊緣) edge; margin; oute...
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • : 動詞1. (保護; 保衛) protect; guard; shield 2. (袒護;包庇) be partial to; shield from censure
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • 邊坡 : bank
  1. As the increase of domestic high - rise buildings, more and more deep foundation trench supporting constructions have come into existence. among the general geographical condition of the urban district in qingdao, most of regions, which mainly consist of strong de composed rocks, are in quite good condition. except for the sandy soil and oozy soil along sea sides. but the development of rock cracks and breaking zones and unstable lamprophyre still exist, so blasting is needed during constructions of foundation trench. blasting have bad influence on the stability of slopes. moreover. the slope - liding has happened for several times, so the engineering project of foundation trench attracts more attention of people

    隨著國內高層建築的發展,深基坑支工程越來越多,綜合青島市區的地質狀況,除海有砂性土及淤泥軟土外,大部分地域巖土條件相對較好,多以強風化巖為主,但巖石裂隙發育,間或有斷裂帶和穩定性極差的煌斑巖穿插其中,基坑施工時需要爆破施工,對的穩定造成了不利影響,加之連續出現的幾次滑失穩事件,基坑支工程越來越引起了各方的重視。
  2. Taken the bank spillway at yubeishan reservoir as an example, the water loads acted on the spillway, such as static water pressure, dynamic water pressure, shear stress on the surface of the step and so on, are calculated, which can provide evidence to the stability analysis of the dam slope and slope protection

    並以萬縣魚背山水庫岸溢洪道為例,計算了溢洪道上所受的水流荷載及其分佈,為土石壩的穩定分析提供了依據。通過計算證實了既使在較大的單寬流量下,緩上的階梯仍有較高的消能率。
  3. Many cases of excavation and support of high rock slopes were symtematically analyzed, and some conclusions were drawn. there exists stress concentration in grading angle induced by excavation and obvious change of stress and strain on sloping surface, which reduce as the increase of distance to surface. initial stresses have important influence on excavation and support

    上的應力應變的靴很大,隨著離距離的增加而減小;初始地應力對的開挖支產生很大的影響,隨著初始地應力的增加,開挖回彈位移增大。
  4. With the research on design and construction specifications of subgrade slope protection, the author in this paper, based on the success experiences of subgrade slope protection all over the country, and considers the advanced technology and experience of abroad, analyzes the slope distress types and causes, and studies systemically the applicability and structure character of these slope protection model, then recommends the typical slope protection model which can used in the most area of our country ; according to the analysis and researches on the types of slope protection, this paper states selection principle of slope protection ; to get the statistical relations between slope surface erosion volumes and related factors, grasp the law of slope surface erosion on the whole, the simulate test of slope surface erosion is done in laboratory ; the drawing library software of typical slope protection is programmed by application the skill of autocad 2000 redevelopment and the tool of vba

    本文結合《路基設計與施工技術規范》課題的研究,在分析總結全國各地設計、施工方的成功經驗的基礎上,借鑒發達國家公路路基的先進經驗和技術,剖析了路基的病害類型和原因,對各種類型的適用性及構造范圍進行了系統全地研究;推薦出了適合我國大部分地區的型式;提出了防類型選擇的原則;進行了室內沖刷模擬試驗,得出填方路基沖刷量與有關因素的統計關系,從宏觀上了解沖刷的主要規律;應用autocad2000二次開發技術,運用vba開發工具,開發了典型防型式圖庫。
  5. It analyzes the hydrologic effect from the aspects of rainfall interception of plants, splash erosion reduction and surface runoff control, analyzes the mechanical effect from the aspects of tensile strength of single root of plant, root - soil interaction, root - soil composite and slope stability and finally approaches to the future development orientation of slope protection by vegetation

    從植物的截留降水、削弱濺蝕和抑制地表徑流等方分析了植被的水文效應,並從植物單根抗拉強度、根土相互作用、根土復合體及穩定分析等方分析了植物的力學效應,最後探討了植被的發展方向。
  6. Side - slope greening is art important measure to ecological remediation and soil and water erosion prevention for artificial side - slopes

    摘要綠化防是對人工開挖建設形成的各種進行生態修復以及防止水土流失的一項重要措施。
  7. The principal conclusions include : ( a ) the composite system is composed of both active - bearing structural members and inactive - bearing ones, being of a character of combination of rigid retaining structures with flexible ones, so its working mechanism will be behaved as sharing loadings, waterproof and impermeability, loading transfer, local reinforcement and pre - reinforcement ; ( b ) the experimental results show that much more subsoil will participate in retaining action, soil stresses of internal slope will be shared uniformly and deflections caused by excavation will be reduced notably because of cooperation of nails and cement - soil mixing pile wall ; and ( c ) the internal forces of facing in vertical model will be a control factor of design and the cross section tensile strength of cement - soil wall will govern strength of the

    主要研究結論有: ( 1 )復合土釘支的作用機理主要為臨時加固土體以保證局部穩定、有機聯系以共同承擔荷載、改善土體性質起到止水抗滲作用。 ( 2 )試驗結果表明:復合土釘支能夠充分調動周圍土體共同作用,有效地控制基坑變形;復合土釘支中止水帷幕的插入深度和強度對控制變形與失穩有較大作用;復合土釘支效果明顯優於一般的土釘支。 ( 3 )層與土體共同變形,設計時可按外力作用下的彈性地基梁進行計算。
  8. This article, takes some project for landslip in a small district in zunyi for example, tells you the useful experience of water proof, sueface prevention structure and sticking of the surfaces of mountain slopes, and so on

    摘要文章以遵義小區某滑治理工程為例,介紹了滑治理中有效解決防水、結構與的粘結等問題的實踐經驗,提出了錨桿支、掛網噴砼、腳擋墻襯、噴界澆築連系梁的綜合治理措施。
  9. This study focused on construction technology of geogrid reinforced clayey soil embankment on common earth foundation. it is conducted according to a test road located in tongchuan, north - west china ' s shaanxi province. long term strain of geogrid in the embankment was researched

    本文以陜西省省道305線土工格柵加筋路堤為實體工程,通過試驗路修築,對土工格柵加筋路堤的施工技術進行了研究,分析了碾壓中的格柵損傷問題,對路堤中土工格柵的應變進行了測試與分析,並對土工格柵加筋路堤技術進行了研究。
  10. The data from xinbi high - slope shows that it ' s a stable slope. 3. the result of elasto - plastic finite element analysis shows that : ( 1 ) excavated - slope face would induce loose belt in rock ; ( 2 ) horizontal ground stress, joined rockmass and weak sandwich would make great unfavorable influence on slope stabilization and axial force of rock bolt

    有限元數值分析結果表明:的開挖會使巖體產生松動帶;構造水平地應力、結構、軟弱夾層對體穩定及支體上的錨桿的受力情況有較大的不利影響。
  11. Abstract : taking the boshan - laiwu freeway as an example, the paper discusses the rocky deep cut slope problems from many sides such as : slope stability assessment, slope design, protection engineering and the constructional monitoring especially the explosion control etc. it stresses on the informational control principle of the deep and large cut slope

    文摘:該文以博菜高速公路為例,從穩定性評價、設計、防工程及施工監控、尤其是控制爆破等多方探討了山區高等級高速公路石質深路塹問題,強調了高大路塹工程的信息化控制原則。
  12. To improve the level of engineering harness, the author redefines the evaluation of rock slope crushing level ( rock mass quality ), and divides the evaluation into two parts. one is the designation of surficial rock mass quality evaluation, which provides references for surficial harness of rock slopes. the other is the designation of integral stability rock mass quality evaluation, which provides references for the integral stability reinforcement

    立足於工程治理,作者將巖質的破碎程度(巖體質量)評價分為兩部分,一是為巖質治理提供依據的「巖質巖體質量評價指標」 ,簡稱為「表rqd指標」 ;二是為巖質整體穩定性工程加固處治提供依據的「巖質整體穩定性巖體質量評價指標」 ,簡稱為「整體rqd指標」 。
  13. Because of the uncertainty of the geological factor, the complexity of high slope project and the particularity of anchor cable project, after the slope is excavated, according to slope ' s stratum rock, weather degree, broken degree, split surface, slope body structure and moisture state, etc, check, analyse and judge reality synthetically, protect and strengthen and design dynamically the high slope, guarantee the stability of slope body and security structure

    摘要由於地質因素的不確定性,高工程復雜性和錨固工程的特殊性,待開挖揭示后,根據的實際地層巖性,風化程度、破碎程度、構造裂體結構和含水狀態等因素,綜合校核和分析判斷是否實際,對高加固進行動態設計,確保體穩定結構安全。
  14. This paper focuses on a discussion of following issues through a combined of theoretical analysis and numerical calculation, and of theory - oriented, engineering analogy, experience and quantitative test. the stability analysis of slopes of deep foundation pit ; checking caculation of tensile breaking limiting condition of soil - nailing, grouting nail sheath anchored limit condition, rising of bottom of foundation pit and piping. measures are proposed for applying this method to slit stratification in disadvantage geologic

    本文介紹了土釘支技術的發展及作用機理,並結合工程實例,採用以理論為基礎,重點研究探討了土釘支在深基坑穩定分析、土釘抗拉斷裂極限狀態驗算、整體穩定性驗算、注漿釘包裹體錨固極限狀態驗算、基坑底隆起驗算、抗管涌驗算等方設計計算方法,並提出了在其它不利地質環境中採用土釘支應採取相應的措施。
  15. With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure

    通過分析比較,論證了對數螺旋線型比圓弧形作為的假設滑裂具有較多的工程優點,並為此編制了一個採用極限平衡法分析土釘支的fortran語言程序,以此作工具對滑裂的后移、土釘錨固段的超長、土釘總力的大小等方作了研究,得出了有關土釘的長度與角、高、土體力學參數的關系、土釘總力與庫侖土壓力間的關系等結論;採用大型通用有限元數值分析程序ansys分別對採用土釘支的一階、二階進行分析,重點是研究各排土釘的軸力分佈規律、開挖方式及原始形態對土釘的軸力的影響、上下階在土釘軸力方的相互作用,得出了有關第一排土釘的設計問題、不同類型的土體應適用於特定的開挖方式、原始開挖出的形態對一些類型體的土釘支有較大的影響而對另外一些影響不大、二階臺階寬度的合理確定、二階開挖及支比一階時具有較多的工程優點等結論;通過土壓力分析對朗肯、庫侖兩種經典土壓力理論的區別與聯系、傾斜及墻背有摩擦時的豎向應力分佈、板背土壓力的分佈形態作了研究,得出了支擋土壓力受體內部穩定與局部穩定兩個方的影響、土釘支板背土體中卸荷拱的存在對板受力有利等結論。
  16. He has contributed significantly towards experimental research in a wide range of practical problems including slope stability, reinforced fill, retaining walls and excavation support systems, submarine pipelines, piling and ground treatment processes. his contributions in retaining walls and reinforced soils earned him the sir benjamin baker silver medal awarded by the uk institution of civil engineers

    他對實驗研究作出極大的貢獻,研究課題實用性高而且廣泛,包括穩定、加固填土、土墻和深基開挖支撐系統、海底管道、樁基礎和地基處理。在土墻及加固填土方的研究使他贏得英國土木工程師學會的sirbenjaminbakersilvermedal 。
  17. Particularly four following respect problems of main research of this thesis : first, excavating and optimizing of the road bed and the slope protect, on the basis of influence factor analysis and the slope design principle by the expressway of mountain area of limestone, we excavate the model of optimizing after putting forward the road bed which is suitable for the expressway of mountain area of limestone, through employ this optimize model, we can reduce the amount of road bed excavate, thus maximum reducing slope excavate destruction to environment and pollute ; according to limestone mountain area expressway characteristic of the cutting slope, we use the law of finite element and rmr of revision carry on stability analyze and appraise to their side slope ; combine the limestone rock body characteristic of mountain area, we have analyzed the corresponding side slope safeguard procedures

    論文主要研究了以下四方問題:第一,路基開挖優化。在分析石灰巖山區環境特徵的基礎上,探討了石灰巖山區路線設計的原則與方法;在應用有限元數值分析方法對的開挖穩定性進行分析的基礎上,提出了陡開挖強支的石灰巖山區高速公路的路基開挖方式,並建立了填挖平衡,開挖積最小的石灰巖山區高速公路的路基開挖量優化模型;結合石灰巖山區巖體特性,探討分析了相應的措施。第二,土石方處理及自然水系調治恢復。
  18. 2. the concept design is the key phase of the first stage of system optimization. the paper emphatically discusses with emphasis several issues difficulty to answer, such as the determination of the soil parameters, the soil pressure and the safety factor and the reliability of retaining structure, summaries and analyses the main geotechnical problems during the excavation on the four familiar geologic strata of saturation soft soil on the class i terrace of the yangtze river, aged - clay, expansive soil and loess and investigates carefully the patterns of deformation and destruction of pit slope in the saturation soft soil, puts forward three basic principles of selecting schemes of retaining structure, namely : facing to the problem, facing to the characteristics of excavation and environment

    ( 2 )概念設計是深基坑工程第一步優化? ?系統(方案)優化設計中的關鍵,文中重點討論了概念設計中的幾個難點問題,如土性參數的確定、土壓力的選取、深基坑工程的安全度和可靠度分析等;總結分析了飽和軟土、老粘性、膨脹土和黃土這四類常見地層條件下的深基坑工程中的主要巖土工程問題,其中重點研究了長江級階地上的飽和軟土深基坑變形和破壞模式,提出了選擇支方案的基本原則,即:向問題、向基坑特點、向周環境特點。
  19. The paper presents a detailed numerical analysis to elucidate the failure pattern of the pit wall, the mechanism of the soil - nailed supporting system and its spatial behavior. firstly, a typical two - layer sand - cobble deposit was chosen for a detailed 2d - fem study. it was shown that due to the distinct behaviors of the upper soft sand layer against the much stiffer lower cobble layer, a bi - linear plane failure was recommended to be used in the limit equilibrium analysis

    本論文對砂卵石基坑噴錨網支進行了數值模擬研究,主要研究內容包括以下四個方: ansys有限元程序中土體本構模型以及分步開挖與支計算模擬研究,砂卵石基坑破壞模式研究,噴錨網支機理研究及空間性狀研究。
  20. Highland mountain road slope surface protection

    高原山區公路的
分享友人