部分工況 的英文怎麼說

中文拼音 [fēngōngkuàng]
部分工況 英文
partial load condition
  • : Ⅰ名詞1 (部分; 部位) part; section; division; region 2 (部門; 機關或組織單位的名稱) unit; mini...
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (情形) condition; situation 2 (姓氏) a surname Ⅱ動詞(比方) compare Ⅲ連詞[書面語] (...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施藝,並指出了橋梁施控制的重要性之後,簡要的介紹了程概,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要作和難點;論文的核心,在介紹了炳草崗金沙江大橋施控制與監測作的前期實驗作和施標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理析方法,索力檢測和結構溫度監測的方法。
  2. But this additional food is only obtained by a great additional amount of labour ; so that not only an agricultural has much less leisure than a pastoral population, but, with the imperfect tools and unskillful processes which are for a long time employed ( and which over the greater part of the earth have not even yet been abandoned ), agriculturists do not, unless in unusually advantageous circumstances of climate and soil, produce so great a surplus of food, beyond their necessary consumption, as to support any large class of labourers engaged in other departments of industry

    但是只有靠大量增加勞動,才能生產出更多的糧食,因此不僅農業人口比起遊牧人口來說空閑時間要少得多,而且由於長期使用不完善的具和不熟練的技藝(在世界上很大一地區直到現在仍是這樣) ,除了在氣候和土壤特別有利的情下,農民們生產不出超過自身消費量很多的余糧,因而供養不了大群從事其他產業的勞動者。
  3. This thesis includes three parts : ( 1 ) the present situation of the defrayal and clearing system in china this part is mainly about the systems of management, defrayal means and niter - bank clearing. describing these three systems, this part outlines the defrayal and clearing system in china

    本文包括三個,具體如下: ( 1 )中國銀行支付清算體系的現狀這主要敘述了中國銀行支付清算的管理體制、支付具體系和聯行清算體系,本文擬通過這三個方面的描述,勾畫出中國銀行支付清算體系的概
  4. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情;根據本文作者多年從事現場地基程振動試驗及相關課題的研究作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力析和檢測川的參數:針對日前巖土程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試驗四方面進行了深入討論;本文作者根據多年現場載荷試驗的程實踐,對深井荷試驗裝置的核心? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  5. Moreover, the system of powdered coal conveying with primary air is the most important tache, whether the distribution of primary air is even or not directly relates to whether the distribution of powdered coal is even or not in all firing implement and nozzles, sequentially directly relates to whether it is hard to take fire, whether the fire is stable, whether there is coking and how about the heat efficiency of the boiler, hi addition, if there is jamming and deflagrate in the system of powdered coal conveying with primary air, severe safety accident can be resulted

    良好的煤粉配風是建立合理的爐內空氣動力和穩定燃燒的必要條件。而其中一次熱風送粉系統又是最重要的一個環節,一次風配風是否均勻直接關繫到煤粉在各燃燒器和各噴嘴中的佈是否均勻,從而直接關繫到著火是否困難、火焰是否穩定、局是否結焦以及鍋爐的熱效率高低。若一次風送粉系統發生堵塞和煤粉爆燃則可能引發嚴重的安全事故。
  6. In routine extracapsular cataract extraction ( ecce ), we occasionally may encounter a condition that the zonule around 12 o ' clock direction disrupted with prolapse of a small porion of vitreous during the nucleus being milked out and not delivered yet

    作者利用動物模式提出在囊外白內障手術中,晶體核擠出時,因輪切口較小,以至尚未擠出晶體核,即發生十二點鐘方向品體?帶斷裂合併玻璃體膨出的情下,如何在盡量減少玻璃體進一步傷害下順利擠出晶體核,並植入後房人水晶體。
  7. Electromagnetic compatibility and radio spectrum matters - electromagnetic compatibility standard for radio equipment and services - part 12 : specific conditions for very small aperture terminal, satellite interactive earth stations operated in the frequency ranges between 4 ghz and 30 ghz in the fixed satellite service v1. 2. 1

    電磁兼容性和無線電頻譜情.無線電設備和服務的電磁兼容性標準.第12:固定衛星服務中作在4 ghz到30 ghz頻帶的衛星地面站微小孔徑端的具體條件
  8. But as a kind of mature management system, it has n ' t been applied successfully in most of chinese companies. the reasons of that include misunderstanding of science property of overall budget management 、 unfit budget management organization 、 lack of scientific management methods, and another important reason is that most of companies use the traditional building method of budget management system. the traditional building method based on the company ' s existing department functions, keeping the existing management process and work process fixedness, and expressing the department ' s work plan in quantity or currency form as their budget

    然而全面預算管理作為一項比較成熟的管理體系,在我國大企業卻並沒有得到很好的實施,這其中固然有對全面預算管理科學性認識不足、預算編制作的組織不到位、缺乏科學的預算管理手段和控制手段等原因外,另一個重要原因是大企業在構建全面預算管理體系時使用的是傳統的構建方法,即基於企業現有的門職能劃而進行的,在保持作業流程和管理流程不變的情下,將作計劃以貨幣或數量的方式表示出來,即成為公司預算。
  9. The result indicates that the maximum stress on the runner is mainly in proportion to the turbine output

    結果表明在大部分工況下該轉輪葉片最大靜應力基本上與水輪機功率成線性關系。
  10. This paper proposes the main work of the author relating the system design, and module implementation. which include two parts. one is to design the framework of a managing and monitoring communication system for a public security department. the system is established to deal with the routine job or to meet with need of management and communication in emergency case

    本文介紹了作者參加的兩作,其一是某省公安廳指揮監控通信系統的總體設計,該系統是為滿足省公安廳的日常和在緊急情下的通信指揮調度的需求而建設的。
  11. 3. the results of model test were analyzed. it is concluded that the performance of the model turbine is satisfying, with press pulsation on some operation point exception

    西安理大學程碩士學位論文3 、通過對模型驗收試驗的結果進行詳細的析,結果顯示除部分工況點的壓力脈動值外,模型轉輪的各項性能滿足合同要求。
  12. This paper discusses the influence of several parameters in heat release rate formula on the working process and proceeds with numerical simulation to the working process in part load condition according to the locomotive character

    本文討論了放熱率中幾個參數對作過程的影響,並且按牽引特性對部分工況進行了計算。
  13. The main work of the paper is for these cases. there are analog integral and digital integral. it was taken into account that the analog integral calls for high performance components, and hard to compensate, so the first part of my work is integral arithmetic analysis and simulate

    本文的作主要是針對以上情展開的,積可以採用模擬積和數字積兩種,考慮到模擬積對元件要求很高,而且不容易進行補償,因此第一作是數字積演算法的比較和模擬:選取合適的采樣數據,從兩個角度進行比較。
  14. Life expectancy at birth is the most important and useful single overall and standardized measure of mortality in a population. published figures show that hong kong men s life expectancy at birth is comparable to that of most industrialized countries

    出生時的預期壽命是一項最重要和有用的人口死亡情的標準指標。健康數據顯示,香港男士的平均預4壽命與大業化國家的男士平均預期壽命大致相若。
  15. Methods of dust character test - part 11 : determination of field resistivity - concentric rings method by means of filtration

    粉塵物性試驗方法第11:粉塵比電阻的測定過濾式同心圓環法
  16. Although, in most instances, tourist groups will be issued their visas within five working days

    在大下,旅行團簽證將在5個作日內簽發。
  17. Furthermore, it is only after the birth of martet system that the social division separates form enterprise, and eterprise become essential to reduce the risk and uncertarity of the division of the labour, the trasanction costs inorder to achieve " cooperation surpls "

    進一步講,在市場制度出現之後,才會出現社會內和企業內浙江師范大學碩士學位論文離的情,才會需要企業這樣一種制度來降低的風險和不確定性、減少市場交易費用、獲取企業內「合作剩餘」 。
  18. In most cases, you ' ll copy fields from the sheet portion of a view

    在大下,復制的是視圖作表的域。
  19. Abstract : based on an investigation of some projects involving vav air conditioning systems in shanghai, describes the general status of these projects, system modes, air distribution, indoor air quality, noise control, duct design and automatic control, and predicts the future prospect of vav system application

    文摘:介紹了對上海地區採用變風量空調系統的程的調研情析總結了程概、變風量系統的方式、氣流組織、室內空氣品質、噪聲控制、風道設計、自動控制等,對其應用前景作了展望。
  20. This dissertation delivers ecu hardware design scheme and discusses its feasibility ; designs ecu hardware circuit based on mcu, including ecu input and output signal processing channel, and the emigration of c / os embedded real time operating system on mcu lpc2292 ; designs fuel injection control project software procedure, and simulate it. it implements the open loop control of air fuel ratio under part of the motor working condition

    在充進行可行性論證的基礎上,完善了ecu的硬體設計總體方案;設計了基於單片機的ecu硬體單元電路,包括ecu的輸入、輸出信號處理通道以及c / os嵌入式實時操作系統在lpc2292單片機上的移植;設計了燃油噴射控制項目的軟體流程;最後通過模擬模擬,實現了發動機部分工況下的空燃比的開環控制目標。
分享友人