鄰樁 的英文怎麼說

中文拼音 [līnzhuāng]
鄰樁 英文
adjacent pile
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  1. Piling load test for bridge str 17 near the wsd catchwater

    近於長沙引水道為橋編號17進行柱的承重測試
  2. On the basis of summarizing the current studies, some typical practical cases and treatment methods are introduced, some key problems encountered in the present studies are put forward and some new ways for researching are expected for the future

    在分析地鐵施工對近橋影響研究現狀的基礎上,介紹典型實例和處理方法,提出目前研究中亟待解決的關鍵問題,並對未來的研究途徑做出展望。
  3. One fine day tess and liza - lu worked on here with their neighbours till the last rays of the sun smote flat upon the white pegs that divided the plots. as soon as twilight succeeded to sunset the flare of the couch - grass and cabbage - stalk fires began to light up the allotments fitfully, their outlines appearing and disappearing under the dense smoke as wafted by the wind

    有一天,天氣晴朗,苔絲和麗莎露一起在自己的租種地里幹活,那天居們也在那塊圈地里,他們一直干到傍晚,干到落日的最後一道余暉灑在那些把圈地分成一塊塊租種地的白色界上。
  4. A good many case of approaching excavation are studied in this article, such as the study of infection of be coal mining to the huayingshan tunnel, technology study of strucked tunnels of metro in shenzhen, countermeasure study of tunnel approaching pile foundation of metro in guangzhou, excavation methods optimized of large cross section subaqueous tunnel approaching pile foundation of lrt in chongqing, etc. on the basic of analysing and concluding relative study production all over the the world by the numbers, classification of approaching excavation, partition of approach zone, formula of partition of approaching zone, approach degree and countermeasure grade of generalized approaching excavation of underground works are put forward. general methods studying and trea

    本文結合作者多年來對華鎣山隧道減少壓煤量研究、深圳地鐵重疊隧道第11頁西南交通大學博士研究主學位論文技術研究、廣州地鐵公紀區間廣紡聯段鄰樁施工對策研究和重慶輕軌大坪大斷面車站近基礎淺埋暗挖工法優化分析等諸多近接施工問題案例的研究,在系統分析和歸納總結國內外相關研究成果的基礎上,系統地提出了廣義的地下工程近接施工的分類、分區、分區指標表達式、近接度與對策等級概念以及分區、分度準則,給出了研究和解決近接施工問題的普遍方法,如數值分析先行,模型試驗、現場測試驗證等。
  5. 4 kinds of ways of influence analysis on safety of the near building structures were presented by analyzing the theory of vibration - impact pile driver system and the soil vibration

    摘要通過對振動打機系統的理論分析和土體振動分析,提出了施工振動時近房屋結構安全性影響分析的4種方。
  6. Soil nailing near wsd catchwater has been completed and grouting for piling at the central pier of bridge no. str17 will commence

    近於長沙引水道的泥釘工程經已完成,與及將會為橋編號str17的中間橋墩展開柱灌漿的工程
  7. Numerical simulation is carried under different conditions, including ( a ) the different distance between deep foundation excavations and the adjacent structures ; ( b ) different supports are used, such as cantilever piles, row piles with one - layer grouted soil anchor, row piles with two - layer grouted soil anchor, row piles with three - layer grouted soil anchor and soil nailings etc. this paper reveal the law of adjacent structures and bracing structures displacements and surrounding soil settlements. anchor and soil nailing ' s impact on the displacements of adjacent structures is analyzed then. further more, we find the law of displacements of bracing structures, surrounding soil settlements, differential settlement and absolute settlements of adjacent structures that may appear in the process of excavation by steps

    模擬分析了近建築物在不同距離的條件下,懸臂支護、一層錨桿與排聯合支護、兩層錨桿與排聯合支護、三層錨桿與排聯合支護、土釘支護等幾種支護情況下的深基坑開挖過程,對深基坑工程開挖過程中近建築物的變形、支護結構變形以及基坑外地層沉降的發展變化規律進行了分析總結;對錨桿和土釘支護對建築物變形的影響作了詳細地分析,找到了一些基坑開挖過程中基坑支護結構變形、周圍地層沉降、近臨建築不均勻沉降及絕對沉降的發展變化規律,得到了一些對深基坑工程設計和施工有工程實際意義的結論。
  8. Finite element method used in modeling lateral soil movement due to surcharge loads and its effect on adjacent piles

    堆載下土體側移及對鄰樁作用的有限元分析
  9. On the base of single pile ' s analysis, the single pile ' s settlement is computed under the burden of adjacent pile, and give the interactive factor a " s change with different load and distance between piles

    在單分析的基礎上,計算了在鄰樁影響下單的沉降變化,給出了雙相互影響系數隨荷載水平和距的變化。
  10. According to the characteristics of foundation pit and adjacent building and surrounding circumstance, some reasonable measures are given to protect the safety of adjacent building based on displacement control, such as prestressed anchor for limitation to lateral displacement of foundation pit, as well as root pile for foundation underpinning of adjacent building to increase its stiffness

    摘要根據基坑開挖、場地地質條件和近建築物的特點,基於變形控制的考慮,採用預應力錨桿限制基坑側向變形,通過微型近建築物基礎進行預托換加固增強其抵抗變形能力,保證工程順利完工和周圍建築的安全使用。
  11. The paper makes the analysis of an engineering accident of the cracking of adjacent existing buildings caused by surface subsidence from groundwater lowering during the construction of large diameter dig - hole piles, finds out the cause, presents the treatment scheme and effectively guarantees the smooth conducting of the project

    該文對由於大口徑人工挖孔施工降水引發地面沉降,造成近建築物開裂的工程環境事故進行了分析,查明了原因,並提出了治理的方案,有效地保證了工程的順利進行。
  12. Construction works for the 4. 4km tin shui wai light rail extensions are now taking place at the junction of tin wah road and tin shui road. the contractor is carrying out piling works for the light rail viaducts and building an elevated light rail stop that will link the stop with nearby housing estates and shopping malls. at other sections of the extensions, the contractor is working on the surcharge

    4公里的天水圍新支線工程,現時工程主要集中在天華路天瑞路交匯處,承建商正興建架空橋的柱,該處將設置一個架空車站,連接近的屋?及商場,至於其他路段,現時主要是進行壓土工程。
  13. Piling works in close proximity to the school will only be carried out outside of school hours

    學校的柱工程只會于學校上課以外時間進行。
  14. Jhon, f and wiss, f, “ construction vibration : state - of - the - art ” , journal of geotechnical engineering, vol. 107, no. gt2, pp. 167 - 181 ( 1981 )

    李全發,打引致地表振動與房耐震診斷,國立成功大學建築研究所碩士論文( 1993 ) 。
  15. Jacked pile is widely used because of its various advantages such as noiseless, vibrationless, no impact and minor construction stress. however, the obvious compacting effects caused by the penetration of jacked pile may have severe influence on surrounding engineering environment

    但是,靜壓屬于擠土,其產生的擠土效應會對周邊環境造成不利的影響,嚴重者可能造成近的建築物開裂,道路隆起以及地下管線斷裂等工程事故。
  16. Piling construction near the west rail in south section

    近西鐵的柱建設工
  17. So it is important to research the effects of tunneling on soil around and adjacent pile foundations

    因此研究隧道工程對于周圍土體和基的影響就顯得尤為重要。
  18. The load test for bridge no. str18 foreground has been completed while work continues on the construction of the abutments pier for bridge no. str19 background

    近於長沙橋編號str18的柱負載測試經已完成前景觀與及繼續進行橋編號str19的橋墩和中間橋墩的工程後景觀
分享友人