重力泄水管 的英文怎麼說

中文拼音 [zhòngxièshuǐguǎn]
重力泄水管 英文
gravity main
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : Ⅰ動詞1 (液體、氣體排出) let out; discharge; release 2 (泄露) let out (a secret); leak (new...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • 重力 : [力學] gravity; force of gravity; gravity force; power of gravity; pull of gravity; gravitational...
  • 水管 : waterpipe; water carrier; aqueduct; water conduit; water pipe; syphon; siphon (消防) 水管車 hos...
  1. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文通過試驗研究與理論分析對旋流式豎井洪洞應用於高頭、大流量情況時存在的一些學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高頭( 252m ) 、大流量( 1400m ~ 3 s )條件下旋流式豎井中的流運動特徵進行了比較全面的測量,包括空腔形態、徑向流速分佈及井壁壓強等;二、提出了豎井空腔段螺旋計算方法,其計算結果與實測值吻合良好;三、利用試驗與計算結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能有了總體認識;四、對豎井下部消井的合理井深進行了優化試驗研究,發現消井合理深度為0 . 9d左右;五、通過試驗研究,歸納出豎井流總摻氣量估算方法,為導流洞排氣方案的設計提供了參考依據;六、在高頭、大流量條件下,豎井空腔段下部流速很高,盡流螺旋運動引起的離心可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的大問題。
  2. Warning : reinspection of t & p relief valve : temperature and pressure relief valves should be inspected at least once every three years by a licensed plumbing contractor or authorized inspection agency, to ensure that the product has not been affected by corrosive water conditions and to ensure that the valve and discharge line have not been altered or tampered with illegally

    警告:新檢查溫度壓安全閥:溫度壓安全閥每年應該由有資格證書的道承包商或經過批準的檢查機構來至少檢查一次,以確保這種產品不會受到腐蝕性的影響,確保閥門和排道不會被不合理的更換或損壞。
  3. The results indicate that ( 1 ) faults are predominant pathways for oil and gas migration in the dina 2 struc - ture ; ( 2 ) the pressure released zones are available for oil and gas migration ; ( 3 ) capillary and buoyancy play an important role in sandstone with similar permeability ; ( 4 ) hydrocarbon migrates always along the predominant pathways, such as faults and associated sandstone in both sides ; ( 5 ) pathways of oil and gas migration have the nature of succession, such as oil driving water and following gas driving oil

    通過模擬實驗,揭示: ( 1 )斷層是迪那2構造中油氣運移的主要通道; ( 2 )壓區是油氣運移的有利指向區; ( 3 )毛及浮在滲透性相近的砂巖中起要作用; ( 4 )油氣咩是選擇優勢通道運移,在沿斷層運移的同時,也向兩側砂體中擴散; ( 5 )油驅之後的氣驅油運移通道具有繼承性的特點。
分享友人