重型橋 的英文怎麼說

中文拼音 [zhòngxíngqiáo]
重型橋 英文
heavy bridge
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • 重型 : heavy (duty); heavy type重型車輛 heavy vehicle; 重型航空母艦 heavy aircraft; battle aircraft; ...
  1. Based on the analysis at natural ecological characteristic and construction target, the design of shanghai new jiangwan city, inspired by daedal nature, combines the project with arts and converts the bald bridge to landscape focus and sightseeing platform dreamily

    摘要上海新江灣城的的設計從自然生態與建設目標出發,從大自然中選萃靈感,使工程與藝術相融合,將工程化的梁演繹為夢幻般的景觀焦點與觀景平臺。
  2. The company leads the product each automobile spider gear, the heavy automobile gear, all type forging, dead axle, the host reduces always becomes and so on each kind of automobile fitting, because supplied goods promptly, the quality is reliable, the price is moderate, the service is thorough once many times attains the chinese heavy steam, the hunan automobile vehicle bridge factory, the chongqing heavy steam, the shaanxi heavy steam, the anhui peaceful triumphant fukuda dawn vehicle bridge company and so on the domestic each big motor pool, always installs the factory “ the outstanding supplier ” “ the aa level supplier ”, “ the outstanding necessary unit ” and so on the title

    長風公司主導產品各汽車弧錐齒輪、汽車齒輪、和鍛件、轉向節、主減總成等各種汽車配件,因供貨及時、質量可靠、價格適中、服務周到曾多次獲中國汽、湖南汽車車廠、汽、陜西汽、安徽安凱福田曙光車公司等國內各大汽車廠、總裝廠「優秀供應商」 、 「 aa級供方」 、 「優秀配套單位」等稱號。
  3. Analysis of the wheelbase and steering stability of of the heavy - duty automobile with the double front axle

    雙前汽車軸間距及操縱穩定性分析
  4. Presently, cfst arch bridges develop in the direction of large - span and lightweight style, accordingly, investigators and devisers should increasingly attach more importance to their dynamic behaviour, and some typical dynamic matter of bridges, such as seismic response, wind induced vibration, coupled dynamic vibration between bridge and vehicle should not be ignored

    目前,鋼管混凝土拱正朝大跨、輕的方向發展,因此,該類梁的動力特性也日益引起視,象地震、風振、車振等梁的典動力問題也是該類梁所無法迴避的。
  5. Ceramic welding backups are used for one - sided welding of steel and aluminum alloy with any thickness, instead of two sided welding in shipbuilding industry, marine industry, and heavy mechanical industry. the products are stuitable for the most kinds of welding process such as gmaw, saw, fcaw and seg even with high electric current to produce a satisfactory back bead formation

    陶瓷焊接墊是用作鋼鐵或鋁合金單面焊雙面成的支撐件,可替代效率低下的雙面焊工藝,被廣泛應用於造船,梁和機械等工業領域的各種焊接( gmaw , saw , fcaw和seg )甚至高電流場合
  6. The ansys, a kind of fea program, was used to build model of small carriage. the procedure of gantry beam bump with secondary beam of bridge was reappeared by running nonlinear calculation and loading program which was written by apdl program language. the closest deforming result was gotten, and the deforming of main beam, secondary beam and end beam and inner stress distribution status were calculated

    採用大三維有限元軟體ansys對該起機以及小車架等進行了建模、應用apdl語言編寫加載程序、進行非線性計算,再現龍門橫梁與起機副梁碰撞過程,最後得到與實際變形結果最接近的一種狀態,得出起架主梁、副梁、端梁的變形以及其內部的應力分佈情況。
  7. It is very important for maintaining, monitoring and designing the great bridge to analyze and check the cable - stayed bridge

    斜拉檢測分析研究對于這類大梁的養管、維修、監測及結構設計有著十分要的作用。
  8. With the reconstruction of old road, the upgrade of road scale, the accretion of traffic quantity and the manifold of heavy vehicle in my country recently, our desire is higher and higher about the transit capacity of the old bridges. it is more impendent to confirm practice status and supporting load of these bridges on the calzada

    近年來隨著我國路網改造、舊路改建和公路等級的提升,交通量的日漸增大,車輛的日漸增多,對原有的公路舊的通行能力要求愈來愈高,確定此類公路梁的實際使用狀況和實際承載力就顯得尤為迫切。
  9. The bridge vibrated when a heavy truck passed

    大卡車經過時,這個架就會震動。
  10. Heavy truck mig mag welding axle housing fatigue crack failure analysis

    載貨車沖焊殼疲勞斷裂失效分析
  11. Translation the serious incident on the 11th of this month in which a cabin of the ngong ping 360 cable car system crashed to the ground has aroused my concern about the safety of other major infrastructures in hong kong, such as the road tunnels, major bridges and mass transit carriers

    昂平360纜車系統于本月11日發生車廂從高處墮下的嚴事故,令本人關注到本港其他大基建設施例如各行車隧道大梁,以及集體運輸工具的安全問題。
  12. Engineering earthquake safety evaluation of the nuclear power station dam site and brige etc. seismic gonation and microgonation, earthquake disaters estimation and mitigation, engineering structure ' s dynamic characteristic etc

    核電站、大壩、大梁等大工程的地需安全性評價;地震區劃和小區劃,震賃評估、預測及其減賃對策,工程自振特性和環境振動測試,爆破公害的控制設計等。
  13. The bridge is strong enough to support heavy trucks

    這座經得起卡車通過。
  14. To avoid heavy equipment on site, launching girders will be used to assemble the pre - cast elements similar to the construction of hung hom bypass

    高架除了柱躉的地基部分,全部採用預製件裝嵌,方法與建造紅?繞道類似,再用以架空形式建造,減少使用機器。
  15. The bridge isn ' t strong enough to allow the passage of heavy vehicles

    那座不夠堅固,無法承載車輛通過。
  16. Light and heavy bridge type railway rails

    重型橋梁式鐵路鋼軌
  17. " the project will improve the manoeuvring of northbound vehicles, particularly heavy vehicles, on the shenzhen side of the crossing and add to the capacity of the existing bridge, " the spokesman added. " by segregating southbound and northbound traffic, traffic flow and safety will be enhanced. " northbound goods vehicles are advised to keep to the left traffic lane and passenger vehicles to the right lane on the new bridge

    他補充說:沙頭角口岸新跨界的落成和啟用將改善北行車輛,特別是貨車在深圳方面口岸的行駛情況,也可增加容車量。而將南北行交通分流,車流及交通安全均可獲改善。北行貨車在新上應盡量靠左線行車,載客車輛則應盡量使用右線。
  18. If kutuzov decided to march by the road from krems to olmtz to join the forces from russia he ran the risk of finding the french, who had crossed the vienna bridge, in advance of him on this road, and so being forced to give battle on the march, encumbered with all his stores and transport, with an enemy three times as numerous and hemming him in on both sides. kutuzov chose the last course

    若是庫圖佐夫下定決心沿途退卻,從克雷姆斯撤退到奧爾米茨,同俄國軍隊匯合,那末在這條路上,那些越過維也納大的法國人就要搶先一步,使庫圖佐夫遭受危險,這樣一來,他就要被迫攜帶各種裝備和輜在行軍中作戰,同兵力優越二倍從兩面向他夾攻的敵人作戰。
  19. The security and dependability of the extra long bridge structure have become the general concern question of the society in these days. because of the influence of the prestressed loss, the real stress does n ' t coincide with the designed stress, that is to say, the calculated stress does n ' t display the condition of the real structure stress properly, and thereby the undiscovered danger leads to the quality of the engineering construction

    特大梁的結構安全可靠性已成為當今社會普遍關注的問題。對大跨度預應力混凝土梁而言,由於預應力損失的影響,結構的實際應力與設計應力很難完全吻合,即計算應力不能很好地反映結構的實際應力狀態,從而留下安全隱患,嚴影響了工程建設質量。
  20. Kinematic simulation of double - front - axle steering of heavy autocars

    汽車雙前轉向運動學模擬模擬
分享友人