鉆井用水 的英文怎麼說

中文拼音 [zhēnjǐngyòngshuǐ]
鉆井用水 英文
drilling water
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • 用水 : category:drinking water
  1. Synthesis of green flocculating agent and its application in disposing wastewater of nature gas well

    綠色絮凝劑的合成與處理天然氣的應研究
  2. 10 million would go to drilling for water and regoing regrowing paster land. the other money would go to cattle producers to help them recover their losses from selling early

    1億美元和重建牧場。餘下的錢於補貼放牧者因過早出購牲畜而帶來的損失。
  3. Different drilling fluid systems have been used in the horizontal well drilling in north tarim area, more specifically, polymer drilling fluid is used in the top hole of large size, and polysulfide drilling fluid for the lower interval ; for the building section and horizontal interval, polysulfide drilling fluid mixed with oil is used

    塔北地區上部大眼採聚合物液體系、下部段採聚磺液體系、造斜段及平段採聚磺混油液體系。
  4. Tighten up fluid loss if necessary with additions of drispac r / sl. excess lime should equal pf with pm 6 times greater. if shales prover non - reactive, allow lime content to deplete

    如果需要高粘或低粘錐斯派克控制失的話,過量的石灰就應當使液堿度比濾液堿度大6倍左右。如果證實頁巖沒有反應,就允許把液中所含的石灰耗盡。
  5. I have taken impotance to analyze the rallying point of famous product, concrete cost and capability of providing and guarantee in this artical, meanwhile, i have caculated the quantity of concrete needed for the year and got the regression equation with the historic data for drilling footage of eight years and the consuming quantity of oilwell cement by the method of linear regression, and it has very significance for the making of stock contract and the plan of concrete production, i have analyzed the physical distribution of oilwell cement by the transpotation flex and the advantage or disadvantage between direct distribution and distribution to store in this artical, and i have tried to find the balance point of the two distribution ways by the ecnomic analysis and pointd out the conception of economic semidiameter, and come to the conclusion of direct distribution, distribution to store, and subarea of distribution to store at last

    本文對油泥供應商在品牌號召力、泥成本、供應保障能力等方面進行了詳盡分析,並對供應商進行了能力排序;線性回歸方法從八年進尺與油泥消耗量的歷史數據推算了當年度油泥需求量,得出了回歸方程,這對于油泥采購合同的制訂、泥供應商生產計劃的制訂具有相當重要的意義;從運輸彈性分析出發對油泥物流配送進行了研究,對直達配送、入庫配送的優缺點進行了詳細的分析,在經濟分析的基礎上力求找到兩種配送方式的均衡點,並提出了經濟半徑的概念,得出了直達配送、入庫配送、入庫分區距離等幾項結論。
  6. On the basis of analyzing the working circumstance and prosperity of downhole drilling string of the surface dynamic rotating drilling vertical well, the force prosperity and failure forms of downhole drilling string are focused on. and further research has been done on the vibration damage of downhole drilling string as well as the construction and work prosperity of vibrating - proof hydraulic shocker absorber

    本文在對地面動力旋轉柱的工作環境和特性加以分析的基礎上,著重對柱在下的受力特性以及損壞形式進行了分析,並對柱在下的振動危害以及於防止振動的力加壓減震器的結構、工作特性等一些規律進行了深入的探索和研究。
  7. An unweighted, non - dispersed and non - inghbitive freshwater bentonite system together with hi - vis bentonite sweeps is to be used for this section

    段將採不加重、不分散、不抑制清的膨潤土液和高粘膨潤土清掃液。
  8. It is a non - propelled crane ship after conversion, operating in ports and calm waters, deploying towing in chinas coastal class ii navigational area and suitable for salvage of sunken ships, harbour construction, lifting of bridge beams sections for erection, loading unloading heavy cargoes as well as offshore oil drilling production platform and other offshore hook - up

    本船改建后為非自航固定式起重船,以港口及平區域作業為主,可在我國沿海ii類航區中調遺拖航,適於打撈船舶港口建設橋梁吊裝裝卸重大物件,以及海上石油採油平臺和其他海上弔裝工程。
  9. From 1956 to now, the exploration of this area has gone through three stages, over 40 years. the drilling with brine mud and the bad quality have caused the difficulty of gas and water identification, which lead to miss of gas reservoir in logging interpretation

    自1956年工區勘探至今,經歷了三個階段40餘年,但由於氣田多採泥漿,加之測資料質量較差,造成氣、層識別困難,大量氣層在測解釋中遺漏。
  10. The paper systematically generalizes the present state of research and application of drilling fluids in ccsd, non - ferrous exploration, oil drilling, coal exploration, water well drilling and geothermal well, and progress of waste mud treatment

    摘要文章總結了沖洗液在國內大陸科學探、金屬礦床探、石油、煤田地質探、工程及地熱等領域的研究應現狀,以及在廢泥漿處理方面的研究進展。
  11. With the development of worldwide petroleum industry, deviated holes, branch holes and horizontal wells are used to exploit oil reservoir which is smaller, thinner and worse. logging while drilling ( lwd ) is used to evaluate and geosteering drill in this kind of reservoir because of its characters

    隨著世界石油工業的不斷發展,大斜度、分支技術越來越多地被來開發規模更小、油層更薄、物性更差、非均質性強的油藏。
  12. Geosteering drilling in horizontal well by logging is an important application of lwd

    的地質導向是隨的重要工程應
  13. This study made a conclusion ? amely in order to realize following the geological target while drilling, on the basis of making a better geological and drilling design for horizontal well, we must make full use of mwd, lwd and integrate logging to carry out lithfacy identifying in real time, the lwd interpretation and formation evaluation, to set up geological model of target formation, to select geosteering marked formation and compare simulative curves with lwd curves f to fix on the drilling direction of bit upper and declination, the position in target oil - gas layer, to revise borehole track in real time, to make it extend in reservoir better interval as possible

    研究認為,在做好地質設計和設計的基礎上,要實現隨跟蹤地質目標,必須充分利測量、隨和錄等資料,從實時巖性識別、隨解釋和地層評價、目標層地質模型建立、導向標志層的選取及模擬曲線對比等方面入手,確定頭上下傾進方向及在目標層中的位置,以實時調整眼軌跡,使其盡可能在儲層物性較好的部位延伸。
  14. Based on methods above, an applied program in visual basic is developed to interpret logging data and geosteering in drilling horizontal wells. the program guides to evaluate the oil field in a complicated geological situation and drill in horizontal well while it is applied to the work of interpretation and geosteering in the research zone

    在上述方法研究的基礎上,結合塔里木油田和莫北油田的實際情況,利vb語言編制了一套隨資料解釋和地質導向的應程序。將該程序應於工區的隨資料解釋和的地質導向工作中,較好地指導了復雜地質條件下的油氣藏評價工作和作業。
  15. Development and applications of the solid emulsifier used to improve the performance of oil - in - water drilling fluids

    有利於改進包油液性能的固體乳化劑的研製及應
  16. If pre - drilling mode was taken in an offshore oil development, pgb - free well drilling technology might be adopted for supplementary wells when the pgb slots were totally occupied

    摘要採方式開發的海上油氣田,對基盤槽孔完后增的調整,可採無基盤方式作業。
  17. This subject belongs to three - dimensional layout problems with behavioral constraints theoretically and concerns the knowledge of spacecraft design, mechanical engineering, computer science, mathematics, mechanics and system engineering. so it can be ascribed as the frontier fundamental and applied research of cross - discipline subject with np complexity theoretically. in term of engineering practice, this subject has extensive applications, such as layout design of spacecraft module, engineering machinery, submarine and shipping, tank, under - water suspension engineering, platform of marine drilling well, bullet train, multiple spindle box of machine tool, robot

    該課題在理論上,屬帶性能約束的三維布局問題,涉及航天器設計、機械工程、計算機、數學、力學和系統工程等學科,為交叉學科前沿課題的基礎理論和應基礎研究,具有np難度;在實踐上,具有廣泛的工程應背景,如航天器艙、工程機械、潛艇、船舶、坦克、下懸浮工程、海上平臺、高速列車、組合機床多軸箱、機器人等的布局方案設計問題。
  18. It includes the establishment of the collaborative system, the research of the work mode of the group and the relevant technology that support group works, the development of the application system etc. by establish collaboration circumstance, ameliorate the manner by which people exchange their information, we can clear up the obstacle which generated because of the distance of the time and the space, and so we can save the time and energy of the workers, and improve the result and the efficiency

    它包括協同工作系統的建立、群體工作方式研究和支持群體工作的相關技術研究、應系統的開發等部分。通過建立協同工作的環境,改善人們進行信息交流的方式,消除或減少人們在時間和空間上的相互分隔的障礙,從而節省工作人員的時間和精力,提高群體工作質量和效率。海洋石油開發生產調度是一項非常復雜的系統工程,需要綜合處理文氣象、地理環境、海上平臺現場設備監控等諸多方面的信息。
  19. Ten million would go to drilling for water and regrowing pasture lands. the other money would go to cattle producers to help them recover their losses from selling early

    1000萬會和重新終止牧草地。剩下的款項將來挽回牛的飼主因提早出售牛而造成的損失。
  20. Ten million would go to drilling for water and regrowing tester ( pasture ) lands

    援助將和重種牧場。
分享友人