鉆進質量 的英文怎麼說

中文拼音 [zhēnjìnzhíliáng]
鉆進質量 英文
drilling quality
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : 進構詞成分。
  • : Ⅰ名詞1 (性質; 本質) nature; character; essence 2 (質量) quality 3 (物質) matter; substance;...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 質量 : 1 [物理學] mass 2 (產品或工作的優劣程度) quality 3 economy (離子源的); 質量標準 quality level...
  1. The improvement of braking drum quality for drawworks

    機絞車剎車鼓的方法
  2. Landslide is a geological hazard with serious losses. it is very important to research the controling methods. slide - resistant pile, which has many advantages such as high adaptability, little interference to landslide and geological environment, short construction time, high silde resistance, is a main method to control landslide. pneumatic down - the - hole hammer is a drilling method with many advantages. its features, such as wide application range, high hole quality, no circulating medium, low operation regulations, and drilling big diameter rock hole, fit to construct slide - resistant pile. according to the requirement of silde - resistant pile construction, this paper analyses feasibility that pneumatic dth hammer drilling applies to construct slide - resistant pile on the basis of introducing the features of pneumatic dth hammer. then an applied example is given

    滑坡是一種危害極大的地災害,它的整治方法研究具有重要意義.抗滑樁是一種適應性強、對滑坡穩定性和地環境干擾小、工期短、抗滑能力強的滑坡整治方法.風動潛孔錘是一種具有許多優點的方法,它的許多特點,如成孔高、應用范圍廣、無液體循環介規程參數小、可實現大直徑基巖孔等都適合於抗滑樁施工.文章在介紹風動潛孔錘特點的基礎上,根據抗滑樁施工要求,分析了風動潛孔錘用於抗滑樁施工的可行性,並舉出了其應用實例
  3. The controlling parameters for smooth blasting in qin - ling zhongnanshan tunnel project are optimized according to the fundamental principle of smooth blasting, considering the minimal resistance, coefficient of embrasure density, coefficient of non - coupling, density of dynamite and rate of exploding. the efficiency of this method has been analyzed and justified by the high speed and good quality of the project

    根據光面爆破的基本原理,從最小抵抗線、爆眼密集系數、不耦合系數、線裝藥密度、爆破尺等幾個方面確定秦嶺終南山隧道光面爆破主要參數的選取,分析了該隧道爆設計在隧道施工中的運用取得的成效,提高了施工度,同時也保證了施工
  4. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身及承載力的檢驗,確定了沖擊在溶洞地條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對孔灌注樁樁端下的巖體強度和結構穩定性方面行模擬計算和定研究。
  5. Compared with the mud on wall form hole technology, clash stake technology or vibration sink pipe technology used in complex foundation stake forming, it has advantages of no vibration, no pollution, and no noise. in addition, since the concrete pressed into the drill stem sent vibration free concrete to the pump, so it is eas y to ensure the quality of the stake body. compared with the mud on wall and dry work form hole technology, the side obstruction and end obstruction of screw drill press concrete stake have all been accordingly improved, the weight bearing is better, and the transmutation of the complex foundation is less

    其中,螺旋孔壓灌混凝土成樁技術自研製以來,已在多項復合地基工程中行了應用,較好地解決了軟弱地層成孔困難的問題,適應地條件范圍廣,成樁速度較快,工期短、工效高;與復合地基成樁時的泥漿護壁成孔工藝、振沖樁工藝或振動沉管工藝施工比較,具有無振動、無污染、無噪音的優點;另外,壓入桿內的混凝土為泵送免振混凝土,因此樁體易於保證;與泥漿護壁和干作業成孔工藝相比,螺旋孔壓灌混凝土成樁的側阻和端阻都有相應的提高,樁的承載性能較好,復合地基的變形較小。
  6. Based on seismic wave method, borehole acoustic method and indoor rock mechanics test, the dynamic and static parameters of the foundation rock for the toe slab of the concrete face rockfill dam for shuibuya hydropower station are tested, and then the relationship among the rock quality, dynamic parameter and static parameter are established with the parameters obtained from the test, furthermore, the classification and the quality evaluation are made as well

    摘要採用地震波法、孔聲波法以及室內巖石力學試驗法,對水布埡水電站面板壩趾板建基巖體行了動、靜參數測試,並根據所獲的參數建立了巖體、巖體動力學和靜力學參數三者之間的相關關系,對工程巖體行了分級和評價。
  7. It ' s reflected in four aspects : teaching target, teaching resources, teaching tactics and teaching assessment. the determination of teaching contents is the emphasis, and the teaching contents is determined by teaching target ; the collection of material ( teaching resources ) is the difficulty - compose a script after making a careful study of the teaching material, then collect the material according to the script ; teaching tactics are embodied by the determination of information form and by the way in which the contents accord with the form so as to get the best result in teaching ; making teaching assessment guarantees the quality of the software. in the early making period, the original model method of system engineering is adopted to produce small experimental courseware and a further revision and improvement are made in consultation with some experts. also an agreement on the demand of the software system is reached. in the later making period, the software is appraised by experts from its stability, serviceability reasonableness of construction, and the scientific nature of contents, then it is put into use as an experiment. finally those who use it are required to fill the teaching feedback table

    教學設計理論是靈魂,它貫穿于整個軟體編制過程,從四個方面來體現:教學目標、教學資源、教學策略、教學評價。教學內容的確定是重點,根據教學目標來確定教學內容;素材的收集(教學資源)是難點,在研教材的基礎上撰寫腳本,根據腳本去收集素材;教學策略體現在信息形式的確定,以及如何使內容與形式協調一致,達到教學最優化的效果;而行教學評價是本軟體的保證,在軟體的製作的初期,採用系統工程論的原型模型法,開發出實驗性小課件,在徵求專家的意見的基礎上一步修改、完善、確認軟體系統的需求併到達一致的理解,在軟體製作的後期,再請專家從軟體的穩定性、可操作性、結構的合理性、內容的科學性等方面行鑒定,最後將軟體作實驗性投入使用,再讓實驗對象填寫教學反饋信息表。
  8. The diamond drilling bits and reaming shells were awarded the state silver medal and series of wireline drilling tools wined a national championship in 1991

    產品性能先可靠,金剛石頭和擴孔器曾榮獲國家銀獎,繩索取芯工具系列產品在
  9. Based on the description on the construction technology of the continuous flight auger ( cfa ) pile, the quality advantage, material requirement, construction condition of the pile is introduced, and then the causation of the quality defect and its control measure are presented herein ; from which the processes of both the construction and the quality control are analyzed as well

    摘要基於對長螺旋孔混凝土壓注樁施工工藝的論述,介紹了該類型樁的優點、材料要求、作業條件以及常見缺陷的原因及控制措施,對其施工及控制過程行了分析。
  10. This study made a conclusion ? amely in order to realize following the geological target while drilling, on the basis of making a better geological and drilling design for horizontal well, we must make full use of mwd, lwd and integrate logging to carry out lithfacy identifying in real time, the lwd interpretation and formation evaluation, to set up geological model of target formation, to select geosteering marked formation and compare simulative curves with lwd curves f to fix on the drilling direction of bit upper and declination, the position in target oil - gas layer, to revise borehole track in real time, to make it extend in reservoir better interval as possible

    研究認為,在做好水平井地設計和井設計的基礎上,要實現隨跟蹤地目標井,必須充分利用隨、隨測井和錄井等資料,從實時巖性識別、隨測井解釋和地層評價、目標層地模型建立、導向標志層的選取及模擬曲線對比等方面入手,確定頭上下傾方向及在目標層中的位置,以實時調整井眼軌跡,使其盡可能在儲層物性較好的部位延伸。
  11. Illing workshop, milling workshop, milling workshop, joointing workshop and heat treatment work - shop, we use scienntific management, mormative producing techniques and perfect quality gua - ranteed system to keep our products of bestg

    用先的麻花擠壓成型設備,企業以科學的管理模式規范的生產工藝完善的
  12. It includes the establishment of the collaborative system, the research of the work mode of the group and the relevant technology that support group works, the development of the application system etc. by establish collaboration circumstance, ameliorate the manner by which people exchange their information, we can clear up the obstacle which generated because of the distance of the time and the space, and so we can save the time and energy of the workers, and improve the result and the efficiency

    它包括協同工作系統的建立、群體工作方式研究和支持群體工作的相關技術研究、應用系統的開發等部分。通過建立協同工作的環境,改善人們行信息交流的方式,消除或減少人們在時間和空間上的相互分隔的障礙,從而節省工作人員的時間和精力,提高群體工作和效率。海洋石油開發生產調度是一項非常復雜的系統工程,需要綜合處理水文氣象、地理環境、海上井平臺現場設備監控等諸多方面的信息。
  13. 1. setting a measure device on the drilling machines, a new method of gaining the characters of rock and soil from the blasting drilling is gotten, which is economic and accurate and from which the characters of different parts of the blasting hole are got accurately

    取得的主要成果如下: ( 1 )在孔機械上附加一測速度裝置,通過在土巖爆破施工現場直接從爆破孔的過程來實時獲取炮孔不同部位的巖石性
  14. Through the research on the reducer reliability and optimization design, the design quality of the drilling machine are improved greatly. it is proved that the type zk - 150 drilling machine capability is advanced and operation is reliable by examine and industrial test in coal mine. another advanced equipment provided to users has wide application foreground

    通過可靠性優化設計,使機的設計得到很大提高,所研製的zk - 150型機經性能檢測和工業性試驗證明:技術性能先,機械運轉可靠,為煤礦提供了又一先設備,具有廣闊的市場前景。
  15. The article introduces the basic concepts and common methods of fuzzy mathematics, initially discussing the applications of fuzzy mathematics in the following aspects : 1 ) division of " skidding " strata with grade of membership that are drilled with diamond bits ; 2 ) comprehensive evaluation on the application in evaluation of diamond bits, classification of rock drillability, and evaluation of clay ; 3 ) classification of " hard rock " through fuzzy clustering analysis ; 4 ) estimation of completion time of boreholes and evaluation of underg round water with fuzzy mathematics ; 5 ) identification of new ore areas and option of best water resource area with fuzzy model ; 6 ) option of diamond bits and evaluation on oil field development plan with fuzzy resemble option and the improved calculation method ; ? ) prediction of mud slurry performance and of the amount of surging water in ore pits with fuzzy control ; 8 ) comprehensive evaluation of diamond bits and supporting plan of deep foundation pit with fuzzy optimal theory

    初步探討了以下幾方面的應用: 1 )用隸屬度劃分金剛石「打滑」地層; 2 )綜合評判在金剛石頭評價、巖石可性分級及探造漿粘土評價中的應用; 3 )用模糊聚類分析行「硬巖石」分類; 4 )用模糊數孔竣工時間預估及地下水評價; 5 )模糊模式識別在新礦區類型識別和最佳水源地選擇中的應用; 6 )模糊相似選擇及其改演算法在金剛石頭選擇和油田開發方案評價中的應用; 7 )模糊控制在泥漿性能和礦坑涌水預測中的應用; 8 )優化理論模型在金剛石頭和深基坑支護方案綜合評價中的應用。
  16. Based on the screw drill press concrete stake technology, via the practical application of this technology in complex foundation form stake, this thesis goes deeply into the screw drill press concrete stake equipment and technology parameter in complex foundation, the weight bearing of the formed stake, the factors that affect the stake quality, and its practical application in the project and its social and economic benefits

    本次研究是在螺旋孔壓灌混凝土成樁技術的基礎上,通過該技術在復合地基成樁中的具體應用,對復合地基中螺旋孔壓灌混凝土樁的成樁設備及工藝參數、成樁后樁體的承載性狀、影響成樁的因素及該技術在工程中的具體應用和社會經濟效益等問題行了研究。
  17. Under the consideration of the engineering geological condition of dahuashui hydropower station, the pre - splitting blasting technology and reasonable construction method are adopted for the excavation of the dam foundation in accordance with the analysis on the rock strata therein, in which the design of the blasting parameters and powder charging structure as well as the angle control and the height of the excavating steps are particularly determined, and then better splitting effect is got for the slope excavation and the quality requirement of the construction is satisfied as well

    摘要結合大花水水電站大壩工程地條件,通過分析巖層具體情況,採用預裂爆破施工技術,合理施工方法行壩基開挖,並對爆破參數和裝藥結構的設計,孔的角度控制和梯段高度精心確定,使該邊坡開挖預裂取得良好的效果,保證了壩基開挖的要求。
  18. We also sell the sports implements from america and taiwan as agent, design and install specially the middle and top grade bodybuilding club, the community bodybuilding path, service and safeguard the implements in gymnasium. feida company has made the self - owned cosmic brand - " fairtall " be famous brand of sports and massage equipments in china through clutching the newest international developing trend in the industry, developing and producing the newest stylist production

    廣州飛達公司目前擁有員工近千名,並引國內外先自動生產設備注塑設備自動機械手臂等多種生產設備,從原物料采購開始,裁沖彎焊銑刨車噴塗組裝等所有生產過程皆在廠內完成,便於嚴格控管所有產品的
  19. In the mean time, i discusses the technology of drill - grouting pile foundation, especially in the technology of drilling works, steel works and concrete works, etc. at last, i put forward the methods in dealing with the common accidents

    同時,本文詳細探討了巖溶地區孔灌注樁施工技術,特別是對其成孔工藝、鋼筋工程、混凝土工程等行了重點分析,並提出了針對其常見事故的處理方法。
  20. During the constructing course, the quality of single shot data was promoted chiefly by way of controlling of burying quality of detectors and the well drilling to avoid the stronger environment noise and the utilization of on - site processing system to the analysis promptly to datum

    C , 1990 ) 。在施工過程中,主要是通過控制檢波器的埋置,避開較強的環境干擾,利用現場處理系統對資料行及時的分析,提高了單炮資料的品
分享友人