鋪渠工 的英文怎麼說

中文拼音 [gōng]
鋪渠工 英文
drain layer
  • : 鋪名詞1. (鋪子; 商店) shop; store 2. (用板子搭的床) plank bed3. (舊時的驛站, 現多用於地名) post (often used in place names)
  • : Ⅰ名詞1 (人工開鑿的水道) canal; ditch; channel 2 [書面語] (車輪外圈)outer wheel3 [書面語](盾...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  1. Based on the construction of the testing section for the lining of jiping main canal in shandong province of south - to - north water transfer project, the main causes of the cracking from the mechanized lining concrete slabs are analyzed from the aspects of foundation treatment, bedding layer placement, quality of the raw materials for the concrete, placement of the concrete, cutting of the hardened concrete and the curing of the concrete, and then the relevant prevention and control measures are pertinently put forward

    摘要結合山東省南水北調濟平乾程襯砌試驗段施情況,著重從地基處理、墊層料設、混凝土原材料質量、混凝土澆築、成型混凝土割縫及養護幾個方面分析了機械化襯砌混凝土板裂縫產生的主要原因,並針對性地提出了預防及控制措施。
  2. The test obsvervation include air temperature, ground temperature, foundation moisture, freeze depth, freeze capicity, freeze residual capicity, groundwater table and shape transform of canal lining, etc. throught systemic observation, analysis of impact about each factor on fundation freeze capicity, evaluate effect on anti freeze of various canal lining, comparison on technology and ecnomic of different method, a kind of main canal lining format is been recommended to engineering practice with siutable to ningxia local feature, fufilling the need of main canal safey i application, economic and practical, that is using polystyrene plate laying under concrete slate and grit taking replace of filling layer and optimizing design

    試驗觀測內容包括氣溫、地溫、基土含水量、凍深、凍脹量、凍脹剩餘量、地下水位和砌體外觀變化等項目。通過系統的觀測,分析各因素對基土凍脹量的影響,評價各種襯砌型式的防凍西安理大學程碩士專業學位論文脹效果,並進行技術和經濟綜合分析比較,推薦出了適合我區特點、滿足乾安全運行、經濟實用、防凍脹效果好的乾防滲襯砌型式,即混凝土板下設聚苯乙烯板和砂礫石換填層結構型式,加以優化設計,用於程實踐。
  3. Excavations and trenches - slopes, planking and strutting, breadths of working spaces

    坑道和溝.作空間的坡度板和支承柱寬度
  4. Work on the railroad is expected to take a year and will involve laying track and rebuilding bridges and aqueducts, in the stretches between namibe - bibala and bibala - lubango - matala - menogue ( cuando cubango )

    重建作為期一年,將包括在納米貝-比巴拉和比巴拉-盧班戈-馬塔拉-蒙諾哥(寬多庫邦戈)段設鐵軌、重建橋梁和溝
  5. Rising labour shortages will pave the way for even stronger wage growth, even as the government channels more funds to the poor

    勞動力不足情況的日益嚴重可能為資的快速增長、政府多道給于窮人資金平道路。
  6. They were briefed on drainage services department entrusted works in kam tin, which included the construction of drainage channels and box culverts

    行程中亦介紹了務署委託西鐵在錦田進行的程,包括設排水及箱形暗
  7. Ancillary works including traffic control and surveillance systems, electrical and mechanical systems, geotechnical works, drainage works and environmental mitigation measures such as noise barriers, low noise road surfacing and landscaping works

    相關附屬程包括交通管制及監察系機電系土力程及環境緩解措施,如設置隔音屏障設低噪音路面及環境美化程等。
分享友人