鋼筋混凝土壩 的英文怎麼說

中文拼音 [gāngjīnhúnníng]
鋼筋混凝土壩 英文
reinforced concrete dam
  • : 鋼名詞(鐵和碳的合金) steel
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 鋼筋 : concrete iron; concrete reinforcing bars; rebar; reinforcing bar; reinforced bar; reinforcing ste...
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    縫面處理採用高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型模板施工技術,提高了成型質量和工程進度;在二期施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬模板網作為一期模板;連接改進傳統的電焊連接方式,採用大量採用接頭機械連接技術,有效提高了接頭強度和連接速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程溫控綜合技術的應用,有效降低了溫度的產生;表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。
  2. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟的加速發展及西部大開發戰略的實施,我國水電事業也迎來了迅猛發展的大好時機,一批高水電站正在建設或規劃之中,其泄水建築物孔口及水頭愈來愈大,常規閘室閘墩結構難以承受如此之大的水推力作用,隨著預應力技術的成熟,這一技術已成為解決該問題的關鍵技術措施之一。
  3. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能成套技術研究」 ; 4 .水利部「水工抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能技術、上海寶礦石碼頭防腐蝕技術、江陰長江大橋大體積粉煤灰技術、南京長江二橋泵送技術等提供咨詢建議。
  4. In order to ascertain stress behavior of steel lined reinforced concrete pipe accurately, according to the fundamental principle of non - linear computation of reinforced concrete elements, the steel lined reinforced concrete penstock on downstream dam surface in a hydropower station is calculated and analyzed, and the distribution of circumferential stress of the steel lined reinforced concrete pipe is obtained, it proves that it is safe and reasonable to use structures of steel lined reinforced concrete penstock in hydroelectric station construction, and can satisfy the requirement of project

    摘要為了能夠準確地把握管的受力性能,根據單元非線性計算的基本原理,對某水電站鋼筋混凝土壩後背管進行了計算分析,得出了管環向應力的分佈情況,分佈情況說明了此水電站採用鋼筋混凝土壩後背管的結構形式是安全合理的,可以滿足工程要求。
  5. Design and study of gaobazhou hydropower station ' s prestressing force reinforcing bar concrete snail casing structure

    洲水電站預應力蝸殼結構設計與研究
  6. In china hydropower station, slrcp is firstly used in dongjiang. later, this type of penstock is used in jinshuitan, jinjiang, taolinkou, wuqiangxi, lijiaxia, jinghong, and also in the largest hydropower station : three - gorge hydropower station

    此後,在緊水灘、錦江、桃林口、五強溪、李家峽、景洪水電站工程中陸續推廣使用,舉世矚目的三峽水電站採用的就是「淺槽式鋼筋混凝土壩後背管」 。
  7. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期石圍堰基礎處理與施工技術;大江截流上下游石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大澆築方案及主要施工機械選型;的原材料和耐久性優化試驗研究;大基礎深層抗滑穩定研究;三峽電站進水口型式研究;引水管道研究;蝸殼打壓、廠間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  8. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期石圍堰基礎處理與施工技術;大江截流上下游石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大澆築方案及主要施工機械選型;的原材料和耐久性優化試驗研究;大基礎深層抗滑穩定研究;三峽電站進水口型式研究;引水管道研究;蝸殼打壓、廠間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  9. ? rack occurs during the construction period of slrcp in lijiaxian hydropower station, which generate the study of slrcp construction period ; ? ccording to the survey of slrcp which runs for years, the crack width exceed the design width. so, the crack control is focused

    李家峽後背管在施工期就出現裂縫,由此引出壓力管道施工期性能研究問題;根據對運行多年的壓力管道實地勘察,發現管道的裂縫寬度均超過當初設計裂縫寬度,由此引出裂縫控制問題。
  10. The three gorges project is a world - famous water conservancy center project. the main parts of it are the body of concrete dam, permanent ship casket, electricity - produce department, etc. these are all large volume concrete which influence the ageing resistance of the project directly, and they also have much to do with ( he concrete of moderate heal portland cement armature and concrete aggregate, etc

    長江三峽工程,是舉世矚目的特大型水利樞紐工程,工程的主體:體、永久船閘,發電廠房等均為大體積,這些工程的耐久性既與施工質量有直接關系,也與組成體的小熱硅酸鹽水泥、骨料、等原料有密切的關系。
  11. The reinforced concrete face - slab is adopted as impervious body by long tan rcc dam

    龍灘碾壓重力採用面板作為防滲體。
  12. In the light of the characteristics that the joint parts between the concrete rigid - frame structure and steel box arch ring of caiyuanba changjiang river bridge in chongqing mainly work as the compressive elements, the design of the parts is carried out by means of improving the steel plates, and the design methods and local details design of prestressing steels are put forward in order to ensure the safety of the bridge structure

    摘要針對重慶菜園長江大橋剛構與箱拱接頭主要為受壓構件的特點,採用改進板形式進行設計,提出預應力的設計方法及局部細節設計,確保結構安全可行。
分享友人