鋼筋綁扎工 的英文怎麼說

中文拼音 [gāngjīnbǎngzhāgōng]
鋼筋綁扎工 英文
steel flxer
  • : 鋼名詞(鐵和碳的合金) steel
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  • : 動詞(用繩等纏繞或捆紮) tie up; bind
  • : 扎動詞[書面語] (拔) pull out
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 鋼筋 : concrete iron; concrete reinforcing bars; rebar; reinforcing bar; reinforced bar; reinforcing ste...
  1. Through analyzing the structure of open caisson, and according to sinking stress principle, the paper introduced in the open caisson construction process sinking, correcting error, survey control as well as peculiar circumstance processing technical measure, such as in open caisson construction the inner - mold for sanding, framework supporting and steel binding, and concrete casting ; in open caisson sinking - control the sand in edge foot inner - mold, sand - pumping sinking, and pressure hydraulic monitor breaking and pressure - blowing sinking by air pressure blower etc

    摘要根據下沉受力原理,分析了沉井結構,介紹了沉井施過程中的下沉、糾偏、測量控制以及特殊情況處理的技術措施,如沉井製作中的填沙內模,模板支設和,混凝土澆注;沉井下沉控制中的刃腳內模沙土,抽沙泵抽沙下沉,高壓水槍破壓、空壓機吹壓下沉等。
  2. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由程、模板程、混凝土程、預應力程、移存梁程、孔道壓漿程、梁體封端程、橋面防水層和保護層程等施環節組成。文中介紹的採用胎具製作和,分底腹板和頂板分別並吊裝骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施質量的施技術;採用重物移運器有效移梁的施方法;壓漿、封端、橋面防水層和保護層施的一些規定和注意事項等都是對箱梁製造行之有效的施技術和施方法,並可為以後類似施作借鑒。
分享友人