鋼頂梁 的英文怎麼說
中文拼音 [gāngdǐngliáng]
鋼頂梁
英文
steel cap-
Supervision points on jacking up steel - box ruction of self - anchored suspension bridge
自錨式懸索橋鋼箱梁頂升施工的監控要點Development of anti - skip device for roof bar of 11 mine h - bar trapezium - shaped support
礦用工字鋼梯形棚頂梁防滑裝置的研製The shear mechanism, failure mode, deformation capacity, bearing capacity and the reliability of the anchored angle steels of the wrapped steel concrete cast - in - site frame typical story exterior joints under the middle and high axial compression ratio ( n = 0. 3, 0. 5, 0. 6 ), the working performance, failure mode, and the shear capacity of top story joints under the crack moment, the hysteresis characteristic and the dissipation energy capacity of the test joints are all analysed based on the 1 / 4 model pseudo - static tests of five specimens of wrapped steel concrete cast - in - site frame exterior joints, which varied in axial compression ratio, distribution of the beam angle steels and the stirrup ratio
基於上述分析,本次試驗通過五個外包鋼混凝土邊節點1 4比例模型的偽靜力試驗,以柱的軸壓比、梁角鋼布置形式、配箍率等為主要參數,分析外包鋼混凝土現澆框架一般層邊節點在中高軸壓比( n = 0 . 3 、 0 . 5 、 0 . 6 )條件下,節點的抗剪機理、破壞模式、變形能力、承載能力和角鋼錨固的可靠性;分析了頂層邊節點在張開彎矩作用下的工作性能、破壞模式和抗剪承載力;分析了試驗節點的滯回性能和耗能能力。Based on the conceptual considerations and structural design of pingsheng bridge in foshan, the first single tower and single span hybrid girder self - anchored suspension bridge in the world, the original technical achievements of the bridge, such as those of the integral bridge tower and separated stiffening girders, the stiffening hybrid girders, structural types of steel - concrete girder joint parts, steel box girder incremental launching and hanger adjustment, are presented and the key and innovative techniques for the self - anchored suspension bridge are described in a summarized account as well
摘要通過世界上首座獨塔單跨混合梁自錨式懸索橋佛山平勝大橋的方案構思及結構設計,介紹了其採用的整體橋塔分離式加勁梁橋型結構、混合加勁梁、鋼混凝土結合段構造型式、鋼箱梁頂推技術、吊索調索技術等原創性工程技術成果,綜述了自錨式懸索橋設計的關鍵和創新技術。Inquiring into coal extraction by caving face with steel beam in extraordinary geologic zone
型鋼梁放頂煤工作面在特殊地質構造區域採煤的探索Railway freight car ' s atmospheric corrosion resisting cold formed steel sections part 6 : roof cant rail of covered wagon
鐵道貨車耐大氣腐蝕冷彎型鋼.第6部分:棚車車頂側梁The main suspension gallows consist of a steel box beam, sitting on hydraulic jacks that support all the structure during concreting
主吊架有一鋼箱梁組成,坐落在液壓千斤頂上,在澆注混凝土過程中支撐所有結構。Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating
箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。The company is capable to design and manufacture all alone all kinds of containers and flow office con | ainers, and as request make structurally special enntainers and flow office containers, such products with large capacity and extra height and lcngth as steel containers, ventilators, open top containers, open side containers, eqnipment containers for special purpose, office maintenance containers, living containers, rush bin, toilet case, watch house - ease, containers for dining hall, 2 in 1 or 3 in l office compound meeting room, collapsible containers, and other containers and flow office containcrs of distinct sizes
佛山市南海平洲友利集裝箱有限公司能自行設計製造各類集裝箱及流動辦公室箱,也能按客戶要求製造特殊構造的集裝箱及辦公箱,如大容積超高超長的鋼質集裝箱、通風箱、開頂箱,側開門箱、設備專用箱、辦公裝修箱、住宿箱、垃圾箱、廁所箱、值班室箱、飯堂用箱、二合一或三合一組合辦公會議室箱、裝拆箱及其他不同尺寸的貨箱及辦公箱和集裝箱專用部件、八字板、頂板、側板、低橫梁、角柱頭等。Spring - steel roof member
彈性鋼頂梁H beam cap
工字鋼頂梁With reference to the cantilever erection of the continuous steel box girder of zhuanxing road overhead bridge crossing shenfengjin expressway in shanghai, this paper mainly describes the application of plc - controlled hydraulic sync jack - up system to the balanced cantilever erection of the box girder, closure construction of the girder at midspan, and the operation, control key points and corresponding technical requirements for application of the system
摘要結合上海莘奉金高速公路顓興路跨線連續鋼箱梁懸臂架設施工,重點闡述了plc控制液壓同步頂升系統在鋼箱梁「對稱懸拼,跨中合龍」中的應用及操作控制要點、技術要求。The theme get the integration between design of the large highway bridge in anqing and theory studying, carry out an research in emulating calculation of steel box beam cable - stay bridge. the theme used the transfer - matrix in solving computing of cable - stay bridge structure, got a improving in computing of cable and the load and landed of cable strength
針對鋼箱粱斜拉橋的特性,論文確定了以控制箱粱梁端位移與拉索內力為調整目標,利用循環的正裝過程對斜拉橋的模擬進行計算,並對索塔的塔頂位移進行了良好的控制。For example, frp reinforced concrete is used to support or surround magnetic resonance imaging ( mri ) medical equipment, and frp is also used for the constructions of some seawalls, industrial roof decks, base pads for electrical and reactor equipment, anchor in rock and ground engineering and concrete floor slabs in aggressive chemical environments in order to promote the wide usage of frp and frp reinforced concrete structures, financed cooperatively by nationa l natural science foundation ( item : the research on mechanical performance of frp reinforced concrete beam reinforced ; number : 59978046 ) and henan illustrious youth science foundation, connected with the analysis methods of modern steel reinforced concrete structure, the thesis further studies the flexural performance of frp reinforced concrete beam through the systematic study on experimental data got from this kind of beams, systematically establishes the theoretical calculating system of the flexural performance of frp reinforced concrete beam in cooperation with the up - to - date analytical methods for reinforced concrete, which suits the properties of frp
例如,纖維增強塑料筋應用於支撐和圍繞磁共振成像醫療設備的混凝土中及海堤、工業頂棚、電設備、反應設備的基座、巖土工程中的錨桿、侵蝕性環境的混凝土結構等海洋工程、橋梁工程、路面工程、巖土工程、醫療及化工工程的建設。為了推動纖維增強塑料筋及其混凝土結構在工程中的廣泛應用,本文在國家自然科學基金(項目名稱:纖維增強塑料筋混凝土梁力學性能的研究;編號: 59978046 )和河南省傑出青年基金的資助下,通過對纖維增強塑料筋混凝土梁正截面受彎性能試驗數據的系統分析,結合現代鋼筋混凝土結構學的分析方法,對纖維增強塑料筋混凝土梁正截面受彎性能進行了深入的研究,較系統的建立了適合於纖維增強塑料筋特點的纖維增強塑料筋混凝土梁正截面受彎性能的理論計算體系。Cope in steel beam
鋼梁的頂層In the room always demonstrated the area 2, 500 square meters, the mainhall main body is in 5 goes against steel frame liang to construct, the length 40 meters, the width 32 meters, the height 30 meters, twohosts unfold the area area 1, 000 square meters, selects the height13. 5 meters
室內總展示面積2500平方米,主館主體為5層中頂鋼架梁建築,長40米,寬32米,高30米,二層主展區面積1000平方米,挑高13 . 5米。The coal unloading chute is a kind of the underground reinforced concrete box structure. the main beam of coal unloading chute being made skew, this kind of structure has been the first time in domestic
進煤系統的主體建築物卸煤溝為地下式鋼筋混凝箱形結構,卸煤溝溝頂主梁採用斜向布置,這種結構布置形式在國內尚屬首次。The secondary beam of a 125 / 30t 16. 5m metallurgy crane bridge in anyang iron and steel corporation was damaged, and this accident was reappeared by computer
本課題以事故再現的基本理論為指導,運用模擬法對安陽鋼鐵公司某煉鋼廠125 30t 16 . 5m冶金橋式起重機發生過的一次橋架副梁被頂彎的事故進行再現分析。Abstract : based on the systematic analysis of the shear behavior for r. c. beams, the tests of 11 simple supported beams under the top concentrated loads and the uniform loads are supplemented. the prime variable is shear span ratio, span depth ratio, horizontal web reinforcement ratio and vertical web reinforcement ratio. according to the test results, the working behavior, the prime shear failure modes, the effect of concrete and web reinforcement ( horizontal web reinforcement and vertical web reinforcement ) and other aspects of r. c. beams are analysed. the uniform calculation method for shear capacity of deep beams, short beams and shallow beams for practical is presented
文摘:在對國內外鋼筋混凝土梁的受剪性能進行較系統分析的基礎上,補充了11根鋼筋混凝土簡支短梁在頂部集中荷載和均布荷載作用下的試驗,試驗梁的主要變化參數為剪跨比、跨高比、水平腹筋率和垂直腹筋率.根據試驗結果,對試驗梁的工作性能、主要的剪切破壞形態、混凝土項的抗剪作用、抗剪腹筋(包括水平腹筋、垂直腹筋)的作用等進行了較為深入的分析,提出了可適用鋼筋混凝土深梁、短梁和淺梁相互協調的受剪承載力的統一計算方法The cause and renovation of the crack of bridge in pingdingshan mine area rail
平頂山礦區鐵路鋼筋混凝土橋梁裂縫成因及整治分享友人